Design, Engineering, Supply, Loading, Transportation,Unloading, Storage, Installation, Testing, And Commissioningof Conversion Of Furnace Oil To Pipeline Natural Gas System Including To Conversion Of Dual-Fuel (Png & Folpg) Burners For Calciner No. 2, 3,
Tender Overview
Project Description
Design, Engineering, Supply, Loading, Transportation,Unloading, Storage, Installation, Testing, and Commissioningof Conversion Of Furnace Oil To Pipeline Natural Gas System Including to Conversion of Dual-Fuel (PNG & FOLPG) Burners for Calciner No. 2, 3, & 4,and 20TPH Termax Boiler & Related Piping works
BOQ
| Sl. No. | Item Description |
| 1 | Design, Engineering, Supply, Loading, Transportation,Unloading, Storage, Installation, Testing, and Commissioningof Conversion Of Furnace Oil To Pipeline Natural Gas System Including to Conversion of Dual-Fuel (PNG & LPG) Burners for Calciner No. 2, 3, & 4, and 20TPH ThermaxBoilerwith related Piping works |
| 2 | Supply, Installation, Testing, and Commissioningof Dual-Fuel (PNG & LPG) conversionto the Burner for Calciner No. 2 including BMS pannel. |
| 3 | Supply, Installation, Testing, and Commissioningof Dual-Fuel (PNG & LPG) conversionto the Burner for Calciner No. 3 including BMS pannel. |
| 4 | Supply, Installation, Testing, and Commissioningof Dual-Fuel (PNG & LPG) conversionto the Burner for Calciner No. 4 including BMS pannel. |
| 5 | Supply, Installation, Testing, and Commissioningof valve train for PNG &LPG operation inThermax Boiler |
| 6 | Design, Engineering, Supply, Loading, Transportation,Unloading, Installation, Testing, and Commissioningof Piping related works Includes Piping&fittings, instrumentation, necessary testing , Painting as per BIS colour code, etc. withpipe supports and necessary civilfoundation works. |
| 7 | Rate per meter 200NB pipe (Approximate quantity 200m) |
| 8 | Rate per meter 150NB pipe (Approximate quantity 150m) |
| 9 | Rate per meter 100NB pipe (Approximate quantity 50m) |
| 10 | Rate per meter 50NB pipe(Approximate quantity 100m) |
| 11 | Rate per meter 25NB pipe (Approximate quantity 50m) |
| 12 | Third-party inspection with certified inspection bodyas per PNGRB standards |
| 13 | Comprehensive AMC cost per year for whole units for 2 year after defect liability period |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender