| 1 | Providing Scaffolding for vimanam raja gopuram with non flammebable materials wherever necessary for main form work and by providing coconut keeth as covering the areas & plat form for inspection etc all complete. |
| 2 | Vimanam Height upto 15\"-0\" |
| 3 | Scraping the decayed lime plaster from the surface of vimanam/gopuram. Care fully including isolated bricks or brick work without damaging the vari vargams, racking out the joints , cleaning the surface with water, including all working in heights-super ficial area including all folds -100 s.ft. |
| 4 | Clean removal of Lime plaster from Wall (SOR -UC: W-0103of Pg.no.25) |
| 5 | Dismantling Lime Concrete (SOR - UC : W- 0033 of Pg no 22 ) |
| 6 | Weathering course with brick jelly lime concrete using 20mm brick jelly with pure slacked lime over R.C.C. roof slab in the proportion of 32:12.5 and well watering consolidatedwith wooden beaters to slop including cost and conveyance of materials to site and labour charges etc complete for 10Cum |
| 7 | Plastering with Lime Mortor 1:1.5 mixto 20 mmthick mixed with water proofing compound confirmimg to BIS 2% by weight of Lime content used including finishing,curing,etc complete including cost and conveyance of all materials to site and all labour charges |
| 8 | DismantlingPlain Cement Concrete flooring (SOR UC: W - 0034 Pg.no.22 ) |
| 9 | Labour Charges for Old Stone Removing ( SOR -UC: W 0216 of Pg no 173 ) |
| 10 | Labour Charges for Old Stone Removing (SOR -UC: W 0217 of Pg no 173 ) |
| 11 | Dismantling the damaged Brick Masonry in lime mortar walls under 3m high (SOR -UC: W 0013 of Pg No 21) |
| 12 | Filling with foundation and basement with M sand in 15cm. Thick layerswell rammed & consolidated, including watering, complying with std.specification etc complete. |
| 13 | Labour Charges for Dressing the ExistingCutstone |
| 14 | Labour Charges for Old Stone Fixing (SOR :UC -W 0219 of pg no -173) |
| 15 | Restoration by providing herbal water wash and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges fortools & plants and machinaries to the workship spot and cleaning the site after completion of work etc |
| 16 | Pointing with Lime mortar 1:1.5 including all tools and plants and labour etc., all complete |
| 17 | Providing vargapoochu over the core walls of vimanams/ Gopurams,with Lime MORTAR 1:1.5 complete including Shaping the mukhapathram, mahanasi, koodu all ornamental works to proper shape by embedding broken bricks of shaped/chiseled bricks , rough plastering with Lime MORTAR 1:1.5and finshing with final ornamental plastering nayam theervani including cost and conveyance of all materials, labour there fore lifting of materials, all working in heights curing with water etc complete including all extra for folding and including clearingfrom the vimanams/gopurams 100 sft superficial area for kalkaram. |
| 18 | Vimanam / gopuram of ht. Up to 15\"0\" excluding Kalkaram |
| 19 | Plastering with Lime Mortar 1:1.5 mixto12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 20 | Painting two coats over the new plastered surface with water basedEgavarnam paint including the labour and materials charges etc complete complying the std speicification. |
| 21 | Supplying and fixing teak wood temple type door including all materials, labour charges for manufacturing and fixing I position including all furniture fittings etc complete with std specifications. |
| 22 | Door size 5\" |
| 23 | Door size 7\" |
| 24 | Painting two coats over new wood works using ready mixed enamel paint including costand conveyance of paint and all labour charges etc complete |
| 25 | Painting two coats over old wood works using ready mixed enamel paint including costand conveyance of paint and all labour charges etc complete |
| 26 | Painting two coats for old iron works over the one coat of primer such as ironbarsflatsandothersimilarworksetc, completecomplying with std specification |
| 27 | Finising the top of the roof with one course of pressed tiles of size 20X20X2cm over a bed of Lime mortar 1:1.5 12mm thick mixed with water proof compound at 2% b weight oflimeincluding cost and conveyance of all materials to site and all labour charges etc |
| 28 | Supply of cut stone for carrying out Garpagraham, Arthamandapam, Maha Mandapam, Thirumathil and other Temple Structures upto 10 feet length |
| 29 | 1. Piilar (SOR UC - M-2273 of Pg no 172) |
| 30 | 2. Uthiram (SOR UC - M-2274 of Pg no 172) |
| 31 | Labour Charges for dressing and fixing of New cut stone of various stages |
| 32 | 1. Pillar |
| 33 | 2. Uthiram |
| 34 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial liftof 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 35 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial liftof 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B |
| 36 | Brick work in Cement Mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" size inculding curing, scaffolding etc. complete complying with std. specification |
| 37 | Brick work in Lime mortar 1:2 mix using country bricks ( 83/4\"*41/4\"*23/4\") size inculding curing, scaffolding etc. complete complying with std. specification |
| 38 | Upto basement |
| 39 | Above basement |
| 40 | Brick work in Lime mortar 1:2 mix using Ground moulded Chamber burnt bricks ( 9\"*43/8\"*23/4\") size inculding curing, scaffolding etc. complete complying with std. specification |
| 41 | Above basement |
| 42 | Plastering with Cement Mortar 1:5 mixto 12mmthick including cost and conveyance of all materials to site and all labour charges etc |
| 43 | Paving with cut stone flooring using cut stone of size600x600mm and 100mm thick and all the sides are machine cutting, top surface is neatly dressed and pointing with lime mortar 1:1.5 including all materials and labour charges. |
| 44 | Random Rubble masonry work with Combination Mortar 1:1:5 mix using selected stones and rough stones in foundation and basement including dewatering wherever necessary proper setting,curing,etc., |
| 45 | Centering for soffits of reinforced cement concrete slabs, plain surface including strutting 3 meter height using MS plates of size 90cmx60cm and 10 gauge stiffen and with welded mild steel angles of size 25x25x3mm laid over silver oak |
| 46 | For basement |
| 47 | For plain surfaces |
| 48 | For Column |
| 49 | Providing and laying in position, Standardised Concrete Mix M20 Grade in accordance with IS 456:2000 using 20mm and down graded hard broken granite stone jelly for all rcc works with minimumm cement content 325Kg/m3 and maximum water cement ratio of 0.55, including admixture(plasticiser/super plasticiser) in recommanded proportions as per IS 9103 to acclerate, retard setting of concrete, improveworkability with out i paring strength and durability with about (5 cum) 7730 Kg of 20mm machine crushedstone jelly and with about (3.3 Cum) 5156 Kg of 10 12mm machine crushed stone jelly and with about (4.79cum) 7670 Kg of sand, but excluding cost of reinforcement grill and fabrication charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing etc and providing fixtures like fan clamps in RCC floor/ roof slabs wherver necessary without claming extra complete complying std specification and also directed by departmental officers. The coarse and fine aggregates to be used should comply with requirements of IS standards(No Seperate payment will be made by the department for excess usage of materilas). |
| 50 | for Sub structure |
| 51 | for Super structure |
| 52 | Supplying and Fabricating and placing in position MS Steel or ribbed for steel for all reinforced cement concrete works as per the design given including cost of steel and |
| 53 | Wiring with 2 x1.5 sq.mm. (22/0.3) PVC insulated single core unsheathed copper conductor of 1100 V grade in suitable ULP trunking box on wall and ceiling withaccessories with Module GI switch box on wall with 6A one way module switch with module front plate with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wireforLight point / fan point (for electronic regulator) ( 5 points / Coil) Higher End( DATAA ) |
| 54 | Supply and fixing of 1 no.6A two module 5 pin socket , 1 no. 6A one module switch on suitable module surface mounting Box (GI ) with module cover plate (plastic) on wall with connections. Higher End (S D 462) |
| 55 | Supply and fixing of single box type 1 x 20 W single LED fitting complete with TW round blocks on wall or ceiling with LED tube with PVC unsheathed Copper leads from terminals to the fitting. (Data B) |
| 56 | supply and fixing of 30W LED street light fitting with LED (Lower end) with 25mm dia. GI pipe (class B) with 1 no.25mm GI bend complete on the existing post/ on wall with PVC unsheathed copper leads with MS clamps and with painting . (S D 534) |
| 57 | Supply and fixing of fancy glass shade and 9W LED for BH point. (Data C ) |
| 58 | Supply and fixing of WT bulk Head fitting with Guard with 9W LED bulb (DataD ) |
| 59 | supply and fixing of 65 mm dia. (2 -1/2\") GI pipe (class B) of 6 metre length with 300mm x 300mm x 6mm MS base plate duly welded at the bottom with concreting with construction of masonary pedestal with suitable SMC box with door arrangement to house 6A SP MCB switch, 2/4 way connector on suitable hylem sheet and supply and fixing of 30W LED street light fitting with LED (Higher end) with 1 metre 32mm dia. GI pipe (class B) Complete with suitable MS clamps for LED steet light fitting and SMC box with PVC unsheathed copper leads from SMC box to fitting and with painting of suitable colour . (SD 541 ) |
| 60 | Supply and fixing of 3 nos.6A two module 5 pin socket ,3 nos. 6A one module switch on suitable modulesurface mounting Box ( GI ) with module cover plate (plastic) on wall with connections. Higher End(SD 474 ) |
| 61 | Supply and fixing of 1 no.6/16A two module socket , 1 no. 16A one module switch on suitable modulesurface mounting Box (GI ) with module cover plate (plastic) on wall with connections. Higher End( SD 486 } |
| 62 | Supply and fixing of MS clamps of size 1¼\" x 1¼\" on pillar with suitable Bolt / nuts and painting of suitable colour. (Data E ) |
| 63 | Supply and run of MS angle with necessary clamping arrangements on the pillars with neccesaary accessories as directed by the departmental officer. (Data F ) |
| 64 | Supply and run of 50mm x25mm T.W,Reeper painted with anti termite on wall or MS angle with Coninous run of 32mmx20mm Pressfit Caping and Casing pipe on the Reeper for fixing lights ,plugs without damaging the stone wall with Nailingwith proper connections ( DATA G ) |
| 65 | Supply and Run of 2 of 2.5 sq.mm. (36/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade insuitable PVC rigid pipe on wall and ceiling with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire with painting of suitable colour. ( SD 427 ) |
| 66 | Supply and Run of 2 of 2.5 sq.mm. (36/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in the existing PVC duting with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire . ( DATA H) |
| 67 | Supply and Run of 2 of 4 sq.mm. (56/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire with painting of suitable colour( SD 429 ). |
| 68 | Supply and Run of 2 of 4 sq.mm. (56/0.3) PVC insulated SC unsheathed copper conductor of 1100 V grade in the existing PVC duting with continuous earth wire connection by 2.5 sq.mm. PVC insulated SC unsheathed copper wire . ( DATA I ) |
| 69 | Supply and clamping of 4 x 2.5 sq.mm PVC LTUG armoured copper cable in on post or on wall with MS Clamps. (DataJ) |
| 70 | Supply and laying of 4 x 2.5 sq.mm PVC armoured LTUG cable in a trench to be excavated at a depth of 0.75 metre putting 0.15 metre layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good (Data K) |
| 71 | Supply and laying of 4 x 10 sq.mm PVC armoured LTUG cable in a trench to be excavated at a depth of 0.75 metre putting 0.15 metre layer of sand and covering the cable completely with bricks and sand and refilling the earth to make good (SD 202) |
| 72 | Supply and clamping of 4 x 10 sq.mm PVC LTUG armoured Alu cable on post or on wall with MS Clamps. (SD 220) |
| 73 | Supply and fixing of brass cable gland for 4 x 25/ 10sqmm PVC armoured LTUG cable with earth connection. (SD 185) |
| 74 | Supply and providing cable end termination of 4 x 10 sq.mm. PVC LTUG aluminium armoured cable with necessary aluminium cable sockets by crimping etc with electrical connection complete (DataL ) |
| 75 | Supply and fixing of 8 way single pole and neutral MCB sheet steel enclosure distribution board with double door (metal) with 1 no. 40A DP MCB Isolator as incoming and 6 nos. 6A to 32A SP MCB as outgoing on suitable angle iron frame on wall with earth connection only. Higher End(SD 600 ) |
| 76 | Supply and fixing of 6 way Horizontal Triple pole and neutral MCB sheet steel enclosure distribution boardwith double door (metal) with 1 no. 63A 4P MCB switch as incoming and 18 nos. 6A to 32A SP MCB asoutgoing on suitable angle iron frame on wall with earth connection only. Higher End (SD 632 ) |
| 77 | Supply and fixing of 40A phase selector switch on sheet steel enclosure box with indicator lamps and electrical connections complete. (Data M ) |
| 78 | Supply and run of 4 x 6 sq.mm PVC insulated SC unsheathed Cu.Conductor of 1100V on 7/20 GI bearer wire for service connection mains. (SD 68 ) |
| 79 | Supply and run of 4 x 6 sq.mm PVC insulated SC unsheathed Cu.Conductor of 1100V grade in 32mm dia GI pipe (Class \"B\") suitably bent at both ends with necessary angle iron up right and end supports for mains.( SD 73) |
| 80 | Supply and fixing of powder coated box on wall fabricated with MS sheet of 16 gauge of size 900mm x 300mm x 450mm with 3 nos. of 63A (500V) porcelain fuse units, 1 no. of 63 TPN sheet steel double break switch with HRC Fuse units provision for fixing TNEB meter with electrical connections complete. (Data N) |
| 81 | Supply and fixing of 63A Three phase 500V 4 Pole Change over Switch on suitable angle iron frame work with MS cable entry boxes with earth connection only. (SD 734 ) |
| 82 | Supply and fixing of 32A DP MCB in sheet steel enclosure box with electrical connections complete.(DataO) |
| 83 | Earthing as per the PWD standard with an earth electrode of 2mt class \"B\" GI pipe of dia not less than 32mm, with copper earth plate of size 125mm x 50mm x 6mm, with necessary funneling arrangements with necessary masonry work and with 38mm RCC cover slab for the brick masonry. (SD 234) |
| 84 | Supply and run of 1 of No.8 SWG Copper wire for earth connection. (Data P ) |
| 85 | sub total |
| 86 | GST 18% |