Repairing and Maintenance of Approach Road and its Slope Protection in connection with Construction of RCC Jetty at Tiger More over river Dutta in G.P.- Rangabelia in Block- Gosaba under Basanti Sub Division of CED-IV, SDB.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of existing structure like culvert, bridge, retaining wall and other structure comprising of masonry, cement concrete,steel work, inlcuding T & P and scaffolding wherever necessary, sorting the dismantled material , disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202 for Rural Roads of MORD.b) Cement Morter |
| 2 | Dismantling of existing structure like culvert, bridge, retaining wall and other structure comprising of masonry, cement concrete,steel work, inlcuding T & P and scaffolding wherever necessary, sorting the dismantled material , disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202 for Rural Roads of MORD. (I) By Manual Meansb) Cement Concrete |
| 3 | Providing and laying nominal mix Cement Concrete (with mix proportion 1:1.5:3) / M-20 grade with coarse and fine aggregates conforming to IS : 383,the size of coarse aggregates not exceeding 25 mm of Pakur or other approved variety including screening and cleaning of aggregates if necessary, both of aproved quality and cement, as necessary, compacting by vibrator or other suitable means, cost of curring with water, cost of quality control sampling, testing etc. and including placing a separation membrane of impermeable PVC sheet 125 micron thick transparent of white in colour laid flat with minimum creses, before placing the separation membrane,the sub-base shall be swept clean of all the extraneous materials. Wherever overlap of plastic sheet is necessary, the same shall be at least 300 mm and any damaged sheathing shall be replaced at the Contractor\"s cost. Including carriage of all materials to site but excluding the cost of staging shuttering and reinforcement if any. |
| 4 | Extra 10 % ( Ten Percent) the Schedule rate shall be enhanced over all the item of work relating to Brick and Concrete of SE/SDPC in the Riverine areas for the following Gram Panchaye Rangabelia of Gosaba Block |
| 5 | First class Brick work in cement sand mortar in steining of well, pier, abutment, wing wall, parapets cross drain. H.P. culverts, guard wall etc. including curing, scaffolding, raking out joints etc. complete including cost and carriage of all materials.(a) In 1:4 proportion |
| 6 | All the islands situated under North and South 24 Parganas, which are not connected by major bridges from the main |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/ staging where necessary (Ground floor). (Excluding cost of chipping over concrete surface](iii) With 1:3 cement mortar. (b) 20 mm thick plaster |
| 8 | Extra 22.5 % ( Twenty Two Point Five Percent) the Schedule rate shall be enhanced over all the item of work relating to Brick and Concrete of SE/SDPC in the Riverine areas for the following Gram Panchaye Rangabelia of Gosaba Block |
| 9 | Labour Charges for collecting or taking out displaced cement concrete or brick block of all sizes from slop, bed or appron and relaying the same in cannel bed or slop including clearing ,dressing ,ramming and preparing bed with necessary earthwork complete within a lead of 200 meter and all lifts complete |
| 10 | Making filter with well graded 40 mm down ballasts and laying uniformly behind weep holes, below pitching on bed, side slopes including supply and carriage of all materials to site including preparing bed with earthwork up to 30 cm depth, where necessary and compacting with wooden malllet after laying to achieve designed section as per direction of the Engineer-in-Charge (measurements will be on finished work / in stack after deducting necessary void). (a) 1st Class Brick Ballast |
| 11 | Extra 20 % ( Twenty Percent) the Schedule rate shall be enhanced over all the item of work relating to Brick and Concrete of SE/SDPC in the Riverine areas for the following Gram Panchaye Rangabelia of Gosaba Block |
| 12 | Providing and laying pre-cast brick block pitching of required size (53 Cm. x 53 Cm, x 25 Cm. or as directed by the Engineer-in-charge ) with 1st class kiln burnt bricks in cement mortar including flush pointing on all faces except exposed face which to be plastered with 19 m.m. thick cement plaster , curing, dressing, ramming & preparing subgrade in slopes & bed complete with necessary earth work not exceeding 300 mm in depth with all leads & lifts including cost of all materials/ blocks up to site by all means of transport. The gap between adjacent blocks will not be more than 10 m.m. (Sand, cement mortar mix for making blocks, pointing & plastering is 1:4) |
| 13 | Extra 20 % ( Twenty Percent) the Schedule rate shall be enhanced over all the item of work relating to Brick and Concrete of SE/SDPC in the Riverine areas for the following Gram Panchaye Rangabelia of Gosaba Block |
| 14 | Labour charge for dumping / laying of Laterite / Stone Boulders 25 kg & above / Shingles / Brick Bats, from stack of worksite with all leads and lifts in water or spreading the same on the slope of the bank of River/Sea or the slope of the embankment or in the River/ Sea bed to an uniform thickness as per direction of the Engineer-in-chargeincluding cost of all accessories and other incidental charges d) Brick Bats |
| 15 | Extra 20 % ( Twenty Percent) the Schedule rate shall be enhanced over all the item of work relating to Brick and Concrete of SE/SDPC in the Riverine areas for the following Gram Panchaye Rangabelia of Gosaba Block |
| 16 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. (b) Where staging is not required. |
| 17 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.Note: Diameter of pile to be measured at a distance of 1.5m from the thicker end.(i) 12.5 Cm av. Diameter |
| 18 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles(i) 12.5 cm av. diameter |
| 19 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm.and less than 15cm (i) Jhaw / Eucalyptus. |
| 20 | GST@ 18% |
| 21 | Labours Welfare CESS @1%(sub total + GST 18%) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender