Heavy Industries and Public Enterprises Private Organizations Closing in 0 days TDR #46674856

Design, Manufacturing, Supply, Installation & Commissioning Of Skid Mounted Single Tube Reactor Test Set-Up

Issued by Private Organizations · pune, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Jan 2025
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
pune → Maharashtra
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Design, manufacturing, supply, installation & Commissioning of Skid Mounted Single Tube Reactor test set-up , Gas Connection Line Of Co2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of H2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of Co Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of N2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Manifold For Connecting 4 Co2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 8 H2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 Co Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 N2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Feed Tank-01 43A-Tt-01 Complete With Manual Feeding Option, Pressure Gauge, Level Transmitter, Temperature Element, Provisions Of N2 Blanketing And Necessary Accessories Viz. Isolation Valve, Pressure Safety Valve, Tubing/Hose, Drain Nozzle With Double Valve Systemetc. , Dosing Pumps 43A-Pa-01 Complete With Inlet/Outlet Isolation Valves For Transfer Of Liquid Feed, Tubing/Hoses, Strainers Etc. , Static Mixture (43A-Sm-01) , Auto Sample Handling And Switchover System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Manual Sampling Handling System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Feed Heater 43A-Fh-01: As Mentioned In Annexure T1 To T3 , Reactor 1 43A-Re-01: As Mentioned In Annexure T1 To T3 , Reactor 2 43A-Re-02: As Mentioned In Annexure T1 To T3 , Thermosyphon Loop: As Mentioned In Annexure T1 To T3 , Product Cooler 43A-Ee-01: As Mentioned In Annexure T1 To T3 , Water Chiller 43A-Wc-01: As Mentioned In Annexure T1 To T3 , Gas-Liquid Separator 43A-Vv-01: As Mentioned In Annexure T1 To T3 , Product Storage Tank-02 43A-Tt-02: As Mentioned In Annexure T1 To T3 , Skid For Single Tube Reactor Unit , All Tubing, Fittings, Valves, Tubing Work: As Mentioned In Annexure T1 To T3 , All Miscellaneous E&I Items: As Mentioned In Annexure T1 To T3 , Power And Control Panel, With Plc & Required Hardware, Software, Cables, Field Equipment And Overall Electrical Work As Mentioned In Annexure T1 To T3 , Installation, Testing And Commissioning Work: As Mentioned In Annexure T1 To T3 , Spares As Mentioned In Section K , Gas Detectors As Mentioned In Annexure – T1 To T3. , Line Heaters As Mentioned In Annexure – T1 To T3

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 07-Jan-2025 Extension of Bid Submission End date. Date 16-Jan-2025
2 07-Jan-2025 Correction and Clarifications to Bidders Queries Other 16-Jan-2025
3 16-Jan-2025 Extension of Bid Submission End date by 4 days Date 20-Jan-2025
4 20-Jan-2025 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 27-Jan-2025

BOQ

Name of Work: Design, manufacturing, supply, installation & Commissioning of Skid Mounted Single Tube Reactor test set-up
Sl. No. Item Description
1Gas connection line of CO2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
2Gas connection line of H2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
3Gas connection line of CO complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
4Gas connection line of N2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve.
5Gas manifold for connecting 4 CO2 cylinders along with necessary isolation valves. PT with low pressure alarm
6Gas manifold for connecting 8 H2 cylinders along with necessary isolation valves. PT with low pressure alarm
7Gas manifold for connecting 4 CO cylinders along with necessary isolation valves. PT with low pressure alarm
8Gas manifold for connecting 4 N2 cylinders along with necessary isolation valves. PT with low pressure alarm
9Feed tank-01 43A-TT-01 complete with manual feeding option, pressure gauge, level transmitter, temperature element, provisions of N2 blanketing and necessary accessories viz. isolation valve, pressure safety valve, tubing/hose, drain nozzle with double valve systemetc.
10Dosing pumps 43A-PA-01 complete with inlet/outlet isolation valves for transfer of liquid feed, tubing/hoses, strainers etc.
11Static mixture (43A-SM-01)
12Auto Sample handling and switchover system with necessary accessories as mentioned in annexure T1 to T3
13Manual Sampling handling system with necessary accessories as mentioned in annexure T1 to T3
14Feed heater 43A-FH-01: as mentioned in annexure T1 to T3
15Reactor 1 43A-RE-01: as mentioned in annexure T1 to T3
16Reactor 2 43A-RE-02: as mentioned in annexure T1 to T3
17Thermosyphon loop: as mentioned in annexure T1 to T3
18Product cooler 43A-EE-01: as mentioned in annexure T1 to T3
19Water Chiller 43A-WC-01: as mentioned in annexure T1 to T3
20Gas-liquid separator 43A-VV-01: as mentioned in annexure T1 to T3
21Product storage tank-02 43A-TT-02: as mentioned in annexure T1 to T3
22Skid for single tube reactor unit
23All tubing, fittings, valves, tubing work: as mentioned in annexure T1 to T3
24All miscellaneous E&I items: as mentioned in annexure T1 to T3
25Power and control Panel, with PLC & required hardware, software, cables, field equipment and overall electrical work as mentioned in annexure T1 to T3
26Installation, testing and commissioning work: as mentioned in annexure T1 to T3
27Spares as mentioned in Section K
28Gas Detectors as mentioned in Annexure – T1 to T3.
29Line Heaters as mentioned in Annexure – T1 to T3

AI Tender Summary

OUR REF NO 46674856
AUTHORITY Private Organizations
TENDER VALUE Ref. Documents
LAST DATE 27-01-2025
Authority
Authority Name Thermax Limited
Work Description Design, manufacturing, supply, installation & Commissioning of Skid Mounted Single Tube Reactor test set-up , Gas Connection Line Of Co2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of H2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of Co Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of N2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Manifold For Connecting 4 Co2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 8 H2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 Co Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 N2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Feed Tank-01 43A-Tt-01 Complete With Manual Feeding Option, Pressure Gauge, Level Transmitter, Temperature Element, Provisions Of N2 Blanketing And Necessary Accessories Viz. Isolation Valve, Pressure Safety Valve, Tubing/Hose, Drain Nozzle With Double Valve Systemetc. , Dosing Pumps 43A-Pa-01 Complete With Inlet/Outlet Isolation Valves For Transfer Of Liquid Feed, Tubing/Hoses, Strainers Etc. , Static Mixture (43A-Sm-01) , Auto Sample Handling And Switchover System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Manual Sampling Handling System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Feed Heater 43A-Fh-01: As Mentioned In Annexure T1 To T3 , Reactor 1 43A-Re-01: As Mentioned In Annexure T1 To T3 , Reactor 2 43A-Re-02: As Mentioned In Annexure T1 To T3 , Thermosyphon Loop: As Mentioned In Annexure T1 To T3 , Product Cooler 43A-Ee-01: As Mentioned In Annexure T1 To T3 , Water Chiller 43A-Wc-01: As Mentioned In Annexure T1 To T3 , Gas-Liquid Separator 43A-Vv-01: As Mentioned In Annexure T1 To T3 , Product Storage Tank-02 43A-Tt-02: As Mentioned In Annexure T1 To T3 , Skid For Single Tube Reactor Unit , All Tubing, Fittings, Valves, Tubing Work: As Mentioned In Annexure T1 To T3 , All Miscellaneous E&I Items: As Mentioned In Annexure T1 To T3 , Power And Control Panel, With Plc & Required Hardware, Software, Cables, Field Equipment And Overall Electrical Work As Mentioned In Annexure T1 To T3 , Installation, Testing And Commissioning Work: As Mentioned In Annexure T1 To T3 , Spares As Mentioned In Section K , Gas Detectors As Mentioned In Annexure – T1 To T3. , Line Heaters As Mentioned In Annexure – T1 To T3
Basic Detail
Tender No TL/CCU2401/2024/OTN-01
Bidding Type Tender
Location
City pune
State Maharashtra
Key Dates
Publish Date 20 Jan 2025
Submission Date 27 Jan 2025
Open Date 28 Jan 2025
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
99869846-f4f1-4506-bda3-ef235fb93ef2.html
BOQ_882027.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 20, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Jan 16, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 16, 2025
18:00 IST

Corrigendum-2 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 20, 2025
18:00 IST

Corrigendum-3 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 27, 2025
18:00 IST

Corrigendum-4 Issued

Clarifications on tender conditions and amendments issued.

Completed
Jan 27, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Jan 28, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

99869846-f4f1-4506-bda3-ef235fb93ef2.html

xls

BOQ_882027.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders