Design, Manufacturing, Supply, Installation & Commissioning Of Skid Mounted Single Tube Reactor Test Set-Up
Tender Overview
Project Description
Design, manufacturing, supply, installation & Commissioning of Skid Mounted Single Tube Reactor test set-up , Gas Connection Line Of Co2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of H2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of Co Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Connection Line Of N2 Complete With Ball Valve, Filter, Inline Pressure Regulating Valve With Inlet Outlet Pressure Gauge, Pressure Safety Valve, Mass Flow Controller And Non-Return Valve. , Gas Manifold For Connecting 4 Co2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 8 H2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 Co Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Gas Manifold For Connecting 4 N2 Cylinders Along With Necessary Isolation Valves. Pt With Low Pressure Alarm , Feed Tank-01 43A-Tt-01 Complete With Manual Feeding Option, Pressure Gauge, Level Transmitter, Temperature Element, Provisions Of N2 Blanketing And Necessary Accessories Viz. Isolation Valve, Pressure Safety Valve, Tubing/Hose, Drain Nozzle With Double Valve Systemetc. , Dosing Pumps 43A-Pa-01 Complete With Inlet/Outlet Isolation Valves For Transfer Of Liquid Feed, Tubing/Hoses, Strainers Etc. , Static Mixture (43A-Sm-01) , Auto Sample Handling And Switchover System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Manual Sampling Handling System With Necessary Accessories As Mentioned In Annexure T1 To T3 , Feed Heater 43A-Fh-01: As Mentioned In Annexure T1 To T3 , Reactor 1 43A-Re-01: As Mentioned In Annexure T1 To T3 , Reactor 2 43A-Re-02: As Mentioned In Annexure T1 To T3 , Thermosyphon Loop: As Mentioned In Annexure T1 To T3 , Product Cooler 43A-Ee-01: As Mentioned In Annexure T1 To T3 , Water Chiller 43A-Wc-01: As Mentioned In Annexure T1 To T3 , Gas-Liquid Separator 43A-Vv-01: As Mentioned In Annexure T1 To T3 , Product Storage Tank-02 43A-Tt-02: As Mentioned In Annexure T1 To T3 , Skid For Single Tube Reactor Unit , All Tubing, Fittings, Valves, Tubing Work: As Mentioned In Annexure T1 To T3 , All Miscellaneous E&I Items: As Mentioned In Annexure T1 To T3 , Power And Control Panel, With Plc & Required Hardware, Software, Cables, Field Equipment And Overall Electrical Work As Mentioned In Annexure T1 To T3 , Installation, Testing And Commissioning Work: As Mentioned In Annexure T1 To T3 , Spares As Mentioned In Section K , Gas Detectors As Mentioned In Annexure – T1 To T3. , Line Heaters As Mentioned In Annexure – T1 To T3
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Jan-2025 | Extension of Bid Submission End date. | Date | 16-Jan-2025 |
| 2 | 07-Jan-2025 | Correction and Clarifications to Bidders Queries | Other | 16-Jan-2025 |
| 3 | 16-Jan-2025 | Extension of Bid Submission End date by 4 days | Date | 20-Jan-2025 |
| 4 | 20-Jan-2025 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 27-Jan-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Gas connection line of CO2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve. |
| 2 | Gas connection line of H2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve. |
| 3 | Gas connection line of CO complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve. |
| 4 | Gas connection line of N2 complete with ball valve, filter, inline pressure regulating valve with inlet outlet pressure gauge, pressure safety valve, mass flow controller and non-return valve. |
| 5 | Gas manifold for connecting 4 CO2 cylinders along with necessary isolation valves. PT with low pressure alarm |
| 6 | Gas manifold for connecting 8 H2 cylinders along with necessary isolation valves. PT with low pressure alarm |
| 7 | Gas manifold for connecting 4 CO cylinders along with necessary isolation valves. PT with low pressure alarm |
| 8 | Gas manifold for connecting 4 N2 cylinders along with necessary isolation valves. PT with low pressure alarm |
| 9 | Feed tank-01 43A-TT-01 complete with manual feeding option, pressure gauge, level transmitter, temperature element, provisions of N2 blanketing and necessary accessories viz. isolation valve, pressure safety valve, tubing/hose, drain nozzle with double valve systemetc. |
| 10 | Dosing pumps 43A-PA-01 complete with inlet/outlet isolation valves for transfer of liquid feed, tubing/hoses, strainers etc. |
| 11 | Static mixture (43A-SM-01) |
| 12 | Auto Sample handling and switchover system with necessary accessories as mentioned in annexure T1 to T3 |
| 13 | Manual Sampling handling system with necessary accessories as mentioned in annexure T1 to T3 |
| 14 | Feed heater 43A-FH-01: as mentioned in annexure T1 to T3 |
| 15 | Reactor 1 43A-RE-01: as mentioned in annexure T1 to T3 |
| 16 | Reactor 2 43A-RE-02: as mentioned in annexure T1 to T3 |
| 17 | Thermosyphon loop: as mentioned in annexure T1 to T3 |
| 18 | Product cooler 43A-EE-01: as mentioned in annexure T1 to T3 |
| 19 | Water Chiller 43A-WC-01: as mentioned in annexure T1 to T3 |
| 20 | Gas-liquid separator 43A-VV-01: as mentioned in annexure T1 to T3 |
| 21 | Product storage tank-02 43A-TT-02: as mentioned in annexure T1 to T3 |
| 22 | Skid for single tube reactor unit |
| 23 | All tubing, fittings, valves, tubing work: as mentioned in annexure T1 to T3 |
| 24 | All miscellaneous E&I items: as mentioned in annexure T1 to T3 |
| 25 | Power and control Panel, with PLC & required hardware, software, cables, field equipment and overall electrical work as mentioned in annexure T1 to T3 |
| 26 | Installation, testing and commissioning work: as mentioned in annexure T1 to T3 |
| 27 | Spares as mentioned in Section K |
| 28 | Gas Detectors as mentioned in Annexure – T1 to T3. |
| 29 | Line Heaters as mentioned in Annexure – T1 to T3 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender