| 1 | Full body renovation job (For Aluminum Structure):- No. of working days – 35 days |
| 2 | Partial body renovation job (For Aluminum Structure):- No. of working days – 30 days |
| 3 | Partial body renovation job (For M/S Structure):- No. of working days – 35 days |
| 4 | Full body renovation job (For AC Coach):- No. of working days – 45 days |
| 5 | Partialbody renovation job (For AC Coach):- No. of working days – 35 days |
| 6 | Full body renovation job (For Midi Bus):- No. of working days – 25 days |
| 7 | Partial body renovation job (For Midi Bus):- No. of working days – 20 days |
| 8 | Miscellaneous body repairing Jobs:No. of working days mentioned below:- |
| 9 | Looking glass to fit. 1/8 day |
| 10 | Looking glass to fit after braket repairing. ¼ day |
| 11 | Inside LCD Monitor to fit. ¼ day |
| 12 | Radiator mounting braket to repair each. ¼ day |
| 13 | Radiator braket to repair. ¼ day |
| 14 | Timing cover to repair. ¼ day |
| 15 | Passenger gate for A/C to adjust for proper closing & opening. ½ day |
| 16 | Bonnet lock to fit/repair each. ¼ day |
| 17 | Driver gate/Passenger gate door lock to change. ¼ day |
| 18 | Mudguard to repair. ½ day |
| 19 | Engine bonnet to be repair. ½ day |
| 20 | Roof top cover to repair for A/C. ½ day |
| 21 | Radiator grill to repair. ½ day |
| 22 | Radiator grill to make newly. 2 days |
| 23 | Driver gate to repair. 1 day |
| 24 | Driver gate to make newly. 2 days |
| 25 | Foot rest for A/C passenger seat to repair. 1 day |
| 26 | Passenger seat shock absorber to repair. 1/4 day |
| 27 | Dickey Lock to repair/Change. 1/4 day |
| 28 | Gear lever bottom cover to make by rexine. 1/4 day |
| 29 | Electrical G/check. ½ day |
| 30 | Wipper machine to fit. ¼ day |
| 31 | Wipper machine to fit after linkage modifying. ½ day |
| 32 | Roof light to fit each. ¼ day |
| 33 | Head light L/S & R/S to fit & line to connect. ½ day |
| 34 | Back light L/S & R/S to fit & line to connect. ½ day |
| 35 | Electric horn to fit & line to connect. ¼ day |
| 36 | Indicator light to fit & line to connect. ¼ day |
| 37 | Combinations switch to change. ¼ day |
| 38 | Stop light line to change. ¼ day |
| 39 | Louver to change for each pair. ¼ day |
| 40 | Self to change. ½ day |
| 41 | Alternator to change. ½ day |
| 42 | Floor mat pasting for A/C buses. 2 days |
| 43 | Valvate pasting for roof inside ceiling. 1 day |
| 44 | Passenger stair mat to past for A/C buses. ½ day |
| 45 | Passenger seat clamp making for each. ¼ day |
| 46 | Back side grill to repair. ½ day |
| 47 | Back side grill to make newly. 1 day |
| 48 | Electrical wiring newly making & fitting. 4 days |
| 49 | New trolly making. 2½ days |
| 50 | Trolly repair. 1 day |
| 51 | Back restcap making (each). 1/8 day |
| 52 | Accidental bend chassis to repair (minor). 3 days |
| 53 | Accidental bend chassis to repair (major). 5 days |
| 54 | Stepny braket to repair. 1 day |
| 55 | Propeller shaft cross member to repair. ½ day |
| 56 | Passenger gate with passenger stair height to shorten. 2 days |
| 57 | Passenger seat handle making (Wooden). 1/8 day |
| 58 | Passenger seat handle making (M/S). 1/2 day |
| 59 | Inside body post to fit. ¼ day |
| 60 | Back seat platform to repair. 1 day |
| 61 | All passenger seat & back rest opening & fitting. 1 day |
| 62 | Head light portion to modify. 2 days |
| 63 | Front Left/Right ventilator glass frame repair/newly makeup. ½ day |
| 64 | Window upper glass to fit. ½ day |
| 65 | Marcopolo window glass and rubber to change. ½ day |
| 66 | Marcopolo window glass sliding to change. ¼day |
| 67 | Left side golai to repair. 3 days |
| 68 | Right side golai to repair. 3 days |
| 69 | Mudguard rubber to fit. ¼ day |
| 70 | Passenger seat frame newly making (each) (3 seater Deluxe). 2 days |
| 71 | Passenger seat frame newly making (each) (2 seater Deluxe). 2 days |
| 72 | Passenger seat frame newly making (each) (3 seater Semi Deluxe). 2 days |
| 73 | Passenger seat frame newly making (each) (2 seater Semi Deluxe). 2 days |
| 74 | Window glass guard M.S. flat/pipe to fit (each side). ¼ day |
| 75 | Bodu-U-bolt to tighten/change. 1 day |
| 76 | Front show lower both side newly made & painting. 7 days |
| 77 | Miscellaneous body repairing jobs:- No. of working days mentioned below:- |
| 78 | Front structure to be made new (Top to bottom) with painting. 8 days |
| 79 | Left or right side structure to be repaired. (Major). 4 days |
| 80 | Front structure to be repair (Minor). 4 days |
| 81 | Frond wind screen to change left/right side. ¼ day |
| 82 | Frond wind screen to change both side. ½day |
| 83 | Frond wind screen to change after structure repairing.½ day |
| 84 | Newly making of curved glass structure to fit new curved glass of varying sizes. 4 days |
| 85 | a) Passenger gate with glass frame to be made newly & painting. 4 days |
| 86 | b) Emergency gate with glass frame to be made newly & painting. 3 days |
| 87 | Stair case to repair (minor). 02 days |
| 88 | Stair case to repair (major). 03 days |
| 89 | a) Window glass frame to repair (each). ½ day |
| 90 | b) Window broken glass to change (each). 1/4 day |
| 91 | Window glass frame to making newly (each). 1 day |
| 92 | Window glass rubber to change (each). 1/4 day |
| 93 | Window glass frame panel structure to repair (each). 1 day |
| 94 | a) Back side body to repair with painting. 3 days |
| 95 | b) Back side body to be made newly including painting. 5 days |
| 96 | Roof tar felt to fit. ½ day |
| 97 | Passenger seat frame to repair (Semi Deluxe) each (including painting). 1 day |
| 98 | Passenger seat frame to repair (Deluxe) each (including painting). 1 day |
| 99 | Front cabin floor to repair. 2 days |
| 100 | Passenger gate golai to repair. 2 days |
| 101 | Diesel tank to washing, repairing & painting. 1 day |
| 102 | Silencer box to repair (opening & fitting). 1 day |
| 103 | Silencer pipe to repair (opening & fitting). 1 day |
| 104 | Air pipe, Diesel pipe, Engine oil pipe to repair (each point). 1/8 day |
| 105 | Front wind screen (single glass) to change. 1 day |
| 106 | Front wind screen (single glass) to change after frame repairing. 2 days |
| 107 | Front wind screen (single glass) to change after frame newly making. 10 days |
| 108 | Front structure to be modified in to two parts from single wind screen. 7 days |
| 109 | A.C. Coach window glass to change (each). ½ day |
| 110 | A.C. Coach window glass to change after structure repairing (each). ½ day |
| 111 | Each passenger seat to repair Rexene changed only (Semi Deluxe). ½ day |
| 112 | Each passenger seat (Semi deluxe) to repair Rexene & ply board to changed. ½ day |
| 113 | Each passenger seat back rest Rexene to change only (Semi Deluxe). ½ day |
| 114 | Each passenger seat back rest Rexene & ply board to change (Semi Deluxe). ½ day |
| 115 | Each passenger seat to repair Rexene to change only (Deluxe). ½ day |
| 116 | Each passenger seat to repair Rexene & ply board to change (Deluxe). ½ day |
| 117 | Each passenger seat back rest & Rexene changed. ½ day |
| 118 | Each passenger seat back rest Rexene & ply board to changed (Deluxe). ½ day |
| 119 | Engine bonnet, Fr. Bumper, Fr. Cross member & Fr. Grill opening & fitting. ½ day |
| 120 | a) Front bumper to repair. ½ day |
| 121 | b) Front bumper to be made newly & painting.2 days |
| 122 | a) Rear bumper to repair. ½ day |
| 123 | b) Rear bumper to be made newly & painting. 2 days |
| 124 | Front cross member to repair. ½ day |
| 125 | Luggage carrier to repair (inside). 1 day |
| 126 | Luggage dickey to repair. 1 day |
| 127 | Engine Dash board to repair. 1 day |
| 128 | Rear glass to fit. ½ day |
| 129 | Rear glass to fit after making 2 parts. 1 day |
| 130 | Checker plate (gangway) riveting. 1 day |
| 131 | Checker plate (Full) riveting (after seat frame opening). 3 days |
| 132 | Head light cashing (bed Foard types) making in case of FRB show. 2 days |
| 133 | Air cleaner (damaged) repairing. ½ day |
| 134 | Vehicle inside & outside washing. ½ day |
| 135 | Each Tyre lever/hammer wooden handle making. ½ day |
| 136 | Bolt cutting/welding (each). 1/8 day |
| 137 | Any spares heating by gas. 1/8 day |
| 138 | Route board making & painting. ½ day |
| 139 | Route board with frame making & painting & fitting on the vehicle. 1 day |
| 140 | Vehicle under chassis washing. 1 day |
| 141 | Ceiling velvet pasting (full). 2 days |
| 142 | Ceiling velvet pasting (half). 1 day |
| 143 | Accidental body panel (8’ x 4’) repairing & painting. 3 days |
| 144 | Big window glass to change. 1 day |
| 145 | Floor plywood change with mat pasting of A.C. coach. 6 days |
| 146 | Each passenger seat back rest to be made newly of A.C. coach. 1 day |
| 147 | Each passenger seat cushion to be made newly of A.C. coach. 1 day |
| 148 | Each chassis u-bolt of body to be changed & fitment with new balate packing. ½ day |
| 149 | Front engine cashing full repair & properly aligned. 3 days |
| 150 | Each chassis cross member to be changed (including paint). ½ day |