| 1 | Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store. |
| 2 | 33 K.V. Control Pannel for double Transformer. |
| 3 | 33 K.V. Control Pannel for Single Transformer. |
| 4 | 33 K.V. VCB Out Door. |
| 5 | 33 K.V. Line type Isolator |
| 6 | Control pannel for 33 K.V. I/C Pannel. |
| 7 | Control pannel cable 4X2.5 Sq.mm. |
| 8 | C.T. 200/100/1A. |
| 9 | 33 K.V. 3X300 Sq.mm. XLPE Cable. |
| 10 | 33 K.V. O/D Jointing Kit 3X300 Sq.mm. |
| 11 | Battery set 24 Volt. |
| 12 | Battery Charger 24 Volt. |
| 13 | VCB Structure - Fabrication of VCB structure minimum 3.5 Mtr. Overhead height and 2.5 mtr. Above ground level as per RESPO drawing with the help of M.S. Channel 125X65 mm.two pieces of M.S.Channels joined to each other by M.S. Flat 50X6 mm. diagonally at the interval of 0.5 Mtrs. and top and bottom of the structure. Grouting of isolator structure in CC(cement coarse sand and strone grit of 20 mm. gauge) including supply of necessary T&P and painting of structure with red oxide paint and 02 coat of bus grey paint of Burger/Asian make. (All material provided by contractor) |
| 14 | Isolator Structure - Fabrication of Isolator structure minimum 3.5 Mtr. Overhead height and 2.5 mtr. Above ground level as per RESPO drawing with the help of M.S. Channel 125X65 mm.two pieces of M.S.Channels joined to each other by M.S. Flat 50X6 mm. diagonally at the interval of 0.5 Mtrs. and top and bottom of the structure. Grouting of isolator structure in CC(cement coarse sand and strone grit of 20 mm. gauge) including supply of necessary T&P and painting of structure with red oxide paint and 02 coat of bus grey paint of Burger/Asian make. (All material provided by contractor) |
| 15 | Fabrication of Lightening Arrester/C.T. Structure as per RESPO drawing with the help of 02 Nos. M.S.Channels 125X65 mm. minimum 3.5 Mtr. Long grouting 01 Mtr. Deep from ground level in CC in ratio 1\"4:8 complete in all respect. painting of structure with red oxide paint and 02 coat of bus grey paint of Burger/Asian make. (All material provided by contractor) |
| 16 | Mounting of accessories/equipment on fabricated structure complete work with making proper alignment and tightening the work including fabrication work if required for proper operation of equipment. |
| 17 | 33 K.V. V.C.B. |
| 18 | 33 K.V. Current Transformer 200/100/1A. |
| 19 | Bus/Line Isolator. |
| 20 | Construction of masonary masonary type plinth for 33 K.V. VCB of size 1.6X1.6X1 m brick, sand, cement and stone grit including grouting of 04 Nos. foundation of bolts for erection of 33 K.V. VCB. |
| 21 | Dragging of 33 K.V. Control pannel for Single/double T/F from unloading place upto control room and placement, erection, commissioning and testing of the same as per RESPO norms. |
| 22 | Laying of single circuit 33 K.V.3X300 Sq.mm. XLPE cable in normal soil in switchyard as per norms. Cable trench should filled by fine sand. |
| 23 | Laying of copper control cable of size 4X2.5 Sq.mm., its proper dressing ferruling and connection with the system (cable will be provided by department) |
| 24 | Earthing of VCB/CT/Isolator by way of boring and lowering of ISI marked two Nos. G.I pipe 1.5\" dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral and body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.) |
| 25 | Hoisting of 33 K.V. XLPE cable 3X300 mm2. along with 6\" dia G.I. Pipe 03 meter long with required clamp etc. (All the material will be arranged by contractor at their own cost.) |
| 26 | Installation of Exide or equivalent make 24 Volt, 180 AH Battery set tabular plate and Battery Charger. |
| 27 | Note :-1- All the material provided by contractor shall be as per norms of UPPCL/RESPO.2- One carriage including loading/unloading from dump site to pit site is included in scope of work.3- During execution of work all risk will be of the contractor.4- Contractor will provide all T & P, vehicle and man power.5- All the old and used material should be taken on book.6- The quantity may be vary ±10%.7- GST will be paid extra as legally applicable.8-The work should be carried out under Additional Bussiness Plan 2024-25. |