Estimate For Providing And Fixing Of Attractive Jhulas In Matatila Udhyan. - P/F febricated four seater duck model MGR made of FRP and steel with height 0.90m area 0.50m x 1.80m including supply, carriage, fixing, instalation,labour, materialall lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge. 2 P/F febricated Hores merry-go-round made of FRP and steel with height 0.90m radius 2.00m including supply, carriage, fixing, instalation,labour, materialall lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge. 3 P/F of boat shape Sea-Saw febricated made of FRP and steel with height of 0.60m area 0.60m x 1.40m including supply, carriage, fixing, instalation,labour, materialall lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge. 4 P/F four seater circuler swing made of FRP and steel with height of 1.80m area 1.20m x 1.50m including supply, carriage, fixing, instalation,labour, materialall lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge. 5 P/F febricated Nursery combo set made of FRP and steel area 2.40m x 4.00m including supply, carriage, fixing, instalation,labour, materialall lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge. 6 P/L 80 mm thick Interiocking concrete block pavement laid in stone dust base and fill joint with fine sand. joint filled after lablling and dressing base including earth work in excavation in foundation supply of all material, labour, T&P etc. requlred for proper completion of the work. As per directed by Engineer -in charge. 7 P/L of plain cement concrete 1:3:6 laid in floori/c cost of all lead, lift, material, labour, T&P ,mechanical mixing and vibration etc complete in all respect. As per directed by Engineer -in charge. 8 R.R.Stone masonry in 1:4 cement mortar in wall i/c cost of all lead lift, material, labour, T&P etc complete As per directed by Engineer -in charge. 9 20 mm thick cement plaster in 1:5with cement sand mortar including all cost of labour, material,T&P , etc complete As per directed by Engineer -in charge. 10 Two coat white washing painting on new surface with asian/ berger including cost of allmaterial, with prime coat ,labour , T&P etc complete As per directed by Engineer -in charge 11 walls painting in Two coat with acrylic emulsion painthaving VOC less than 50 gm/litre resistance, of approved brand and manufacturer including applying additional coats wherever required to achieve even shade and colour new surface with all cost of labour, material,T&P etc as per direction of Engineer- in-charge . 12 walls painting in one coat with acrylic emulsion paint having VOC less than 50 gm/litre resistance, of approved brand and manufacturer including scrapping old surface applying additional coats wherever required to achieve even shade and colour with all cost of labour, material,T&P etc as per direction of Engineer- in-charge