|
| 1 | Dismantiling cement concrete or brick or granolithic floors including stacking of dismantled materials as directed by E/IC with in a distance of 60meters (17-Chapter SI.No.697). |
| 2 | Dismantling of old interlocking tiles payment including stacking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge. (NS) |
| 3 | Earth work in Cutting or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required lavels and slops and also including 1.5 m lift and 30 m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge etc. all complete. (20-Chapter PWD.SCH.No.253(a)) |
| 4 | Cartage of Malva, Silt, sludge kankar and other disposable organic material etc. all complete with labour T&P including cartage of 8 km. (NS) |
| 5 | Class-150 Brick Work in 1:4 Cement and Coarse Sand, mortar in foundation and plinth including supply of all materials, laborand tools and plants, etc. Required for proper completion of the work. ( Chapter No. 06 Sr.No. 2) |
| 6 | 12mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive.(c) 1 Cement : 4 Coarse sand.(Chapter No.13 Si.No.2) |
| 7 | Providing and Stacking 22.40-53mm guage stone aggregates of specific sizes to water bound macadam specification including etc all complete.(NS) |
| 8 | Supply and Laying stone dust etc all complete. |
| 9 | Consolidation/Compaction of stone ballast 10cm thick (loose) coat including repairing of patches picking up to old surface spreading, ballast making medhies to retain water and carriage of metal upto 30m carriage of water upto 200m maintenance of barriers and all labour T&P including road roller charges etc. required for proper completion of work the stone ballast is to be supplied to the contractor free of cost at site. |
| 10 | Construction of un-relnforced, plain cement concrete 602 avement thickness as per disign, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M-30 (Grade), coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate nct exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved lixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction, expansion, construction and construction! joints, applying debanding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14 days, curing compund (where specified) and water finishing to lines and grade as per drawing and technical speckication clause 1501. (For Agra (Chapter No.20 Si.No.11) |
| 11 | Supply & Fixing of Glass Strips for expension Joint etc all complete. (NS) On market Rate |
| 12 | Supply & fixing R.C.C Menhole cover heavy duty size etc. All complete. (Non Scheduled) |
| 13 | Raising & Re-fixing of Manhole including all material labor T&P etc. all complete. (Non Scheduled) |
| 14 | Providing and Fixing of Barricading of 100mm dia average ballies with in a distance of 1.50 meter for 3 rows of 3 Q, 3 nos of Cross ballies, two supporting ballies of 3 meter ballies and 2 nos perpendicular ballies tie with moonj rope including supply of all material such as ballies rope T&P required for proper completion of work and also including Clothes Jali and labour component (Material will be property of Contractor after dismentling). |
| 15 | R.c.c work with cement approved coarse sand and 2cm (3/4) gauge approved stone ballast in the proportion 1:2:4 in R.C.C Slab excluding supply of reinforcement and its bending but including its fixing and binding the same with 24 bwgi binding wire and including necessary centring and shuttering etc. And also including supply of all materials labor and tools and plants etc. Required for proper completion of the work. Strength of the concrete shall not be less than M-150.(5-Chapter S.I. No.-284) |
| 16 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (b) 10mm to 12mm tor.(Chapter No. 10 S.I. No. 504(B)) |
| 17 | Supply & Fixing Granite Stone Work Display Board (Size 2.50ft x 4.00ft) including Painting, Lettering etc. all complete. (None Schedule) |
| 18 | Sub Total (A) |
| 19 | Add/Deduction Rs. For Estimate Figure Amount Match |
| 20 | Grand Total |