Supply Materials To Construction Of Nrlm Shed At Hosur Village In Hosur Gp In Babaleshwar Taluka - Hosurgp-09 Mr9762 Add Sundries Charges At 1 % On Material,Hosurgp-09 Mr9773 Add Watering Charges At 1 % On Material,Hosurgp-09 Mr9678 Mixer (Concrete) - 1 Cum Capacity,Hosurgp-09 367 Portland Cement,Hosurgp-09 982 Coarse Sand (Zone Iii),Hosurgp-09 Mr9431 Broken Stone Aggregate 12 Mm To 10 Mm Size,Hosurgp-09 Mr9432 Broken Stone Aggregate 20 Mm Size,Hosurgp-09 Mr9433 Broken Stone Aggregate 40 Mm Size,Hosurgp-09 Mr9498 Mathi/Nandi Wood Planks For Panels 25 Mm Thick,Hosurgp-09 Mr9759 Add Providing And Removing Scaffolding At 3% On Labour,Hosurgp-09 Mr9434 Burnt Bricks Class 35 (Non Modular),Hosurgp-09 Mr9752 Add Handling , Loading And Unloading At 1% On Material,Hosurgp-09 Mr9640 Brick,Hosurgp-09 Mr9764 Add Sundries Charges At 2 % On Material,Hosurgp-09 Mr9444 Casurina Poles 100 - 150 Mm,Hosurgp-09 Mr9753 Add Handling , Loading And Unloading At 2% On Material,Hosurgp-09 Mr9445 Casurina Poles 75 - 100 Mm Dia,Hosurgp-09 Mr9487 Jungle Wood Runners And Planks,Hosurgp-09 Mr9534 Silver Oak Or Equivalent Planks 38 Mm Thick,Hosurgp-09 Mr9772 Add Watering Charges At 1 % On Labour,Hosurgp-09 Mr9761 Add Sundries Charges At 1 % On Labour,Hosurgp-09 Mr9804 Stone Chistler Class Ii,Hosurgp-09 Mr9724 Mason Class Ii (With Tools),Hosurgp-09 Mr9725 Mason Class I (With Tools),Hosurgp-09 Mr9677 Mixer (Concrete Small Used In Culvert),Hosurgp-09 Mr9426 Boulders,Hosurgp-09 Mr9424 Bond Stone 20 X 20 X 45 Cm,Hosurgp-09 Mr9535 Size Stone 20 X 20 X 25 Cms,Hosurgp-09 7335 Binding Wire,Hosurgp-09 Mr9554 Tmt Bars Fe 500,Hosurgp-09 Mr9675 Hom Of Vibrator 0.71 Days,Hosurgp-09 7318 Plasticizer / Super Plasticizer,Hosurgp-09 Mr9757 Over Head & Other Miscellaneous Charges,Hosurgp-09 Displya Board,Hosurgp-09 297 Stone Aggregate(Single Size) 10 Mm Nominal Size,Hosurgp-09 295 Stone Aggregate(Single Size) 20 Mm Nominal Size,Hosurgp-09 Mr10022 Handling Loading And Unloading 3% On Material,Hosurgp-09 Mr10021 Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material,Hosurgp-09 Mr10017 Polyenthylene Water Storage Tank Of Specified Capacity,Hosurgp-09 Mr9742 Add Brush, Putty, Sand Paper, Roller At 5% On Cost Of Paint,Hosurgp-09 830 Enamel Paint,Hosurgp-09 Mr9690 Painter Class I,Hosurgp-09 Mr9737 Add Brush, Putty, Glue At 5% On Cost Of Paint,Hosurgp-09 Mr9562 Whitening,Hosurgp-09 815 Dry Distemper,Hosurgp-09 Mr9616 White Cement,Hosurgp-09 Mr9447 Ceramic Tiles 30 X 30 Cms,Hosurgp-09 Mr9551 Teak Wood Beading 20 X 20 Mm,Hosurgp-09 Mr9726 Add 15% Wastage,Hosurgp-09 Mr9525 Reeded Glass 3 Mm Thick,Hosurgp-09 Mr9732 Add 5% Wastage Charges,Hosurgp-09 Mr9500 Mathi/Nandi Wood Scantling For Styles Ad Rails 25 Mm Thick,Hosurgp-09 Mr9501 Mathi/Nandi Wood Scantling For Styles And Rails 30 Mm Thick,Hosurgp-09 Mr9485 Honnewood Planks For Panels 20 Mm Thick,Hosurgp-09 Mr9484 Honne Wood,Hosurgp-09 Mr9674 Hom Of Machinaries For Planing,Hosurgp-09 Mr9749 Add Cutting And Other Wastage 5%,Hosurgp-09 Mr9953 Victrified Tiles 600 X 600 Mm