Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1001 Hoist the boat making sure that bearing surfaces are adequately cushioned Docking duration 07 days; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1002 Clean the marine growth with wooden scrapper; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1003 Wash the underwater area with fresh water rub with grade 220emery papers and smoothen the surfaces; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1004 Clean with mild detergent in fresh water Inspect for cracks and peeling of gel coat Repair if necessary; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1005 Touch up the antifouling paint as per paint scheme Paint Yard Supply; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1006 Clean all sea suction scoops and inspect for cracks; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1007 Clean the marine growth of Shaft Propeller and Rudder; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1008 Measure and record the clearance of stern tube and P bracket bushes Rudder and Rudder jumping collar; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA 1009 Overhauling and pressure testing of the underwater valves and cocks including painting of valves All material and spares yard supply Qty 09; Servi.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOA 506; HA1010 Clean the bilges and thoroughly inspect the structure to Main engine foundation Supports for distortion cracks and delamination; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1011 Check the tightness of foundation bolts of all auxiliary machinaries; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HA1012 Marine Toilet Remove and clean all flexible pipes and refit with new clipsHand pumpsuction and discharge valve to be overhauledMake JABSCOModelCMPC.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1013 Dfender Crack and deterioration observed at Dfenders at various places to be renewed as per sampleLegth approx10 MtrEBD type rubber fender 75x75x4.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1014 Cleaning and painting of bilges of following compartment to be carried out as per paint schemePaint yard supply i Engine Room 148 SqmApprox .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB 1015 Wheel House sofa Rexine is deteriorated and tear off at various places to be renewed asper samplelength 03 mtrheight and breadth 05 mtr each; Serv.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB 1016 Wheel House Sofa and sitting area seat cover to be changed as per sample Length03 mtrheight and breadth 05 mtr each Qty02; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB 1017 Wheel House and sitting area Floor Mat is damaged To be renewed as per sample Area 12 SQm Mat PVC VINYL; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1018 Quarter deck Awning structure rod 04 Nos bends due to heavy wind force and rain Rod to be repairedrenewed as per sample Mat SS hollow pipe Heavy me.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1019 Wheel House rear window sun light protection film shading screen tear off at many places to be replaced as per sample Area20 Sqm; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1020 A wooden locker at crew cabin broken Hinges securing holes inlarge Locker to be repaired and sun mica sheet to be renewed Size1mtrx1mtrx05 mtr; Ser.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1021 Anchor securing to be done with SS clamp; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1022 Anchor and chain cable to be chip and clean and paint with two coats of anticorrosive paint Make SEA Links Weight50 Kg Cable Length10 Mtr Dia10mm P.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1023 Pilot Chair base adjustment is malfunctioning to be rectified; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; HB1024 All cable and bolting on super structure toilet exhaust and window side to be leak proofed with silicone gel; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3001 Gear oil cooler to be chemically cleaned and pressure tested In way job include renewal of gasketO rings and 02 nos sacrificial anode TP 15 bar Qty.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3002 AC sea water pump to be overhauled and proved for satisfactory operation Jobs include renewal of bearings Mechanicalseal and impeller MakeCrompton .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3003 Checks all cooling coils for cleanliness and corrosion If the coils are dirty Clean with water sparay Soap solution and nylon brush and carryout pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3004 Fire Fighting system ModelNOVEC 1230 Following jobs to be undertaken in yearly routine a Check Manual operation b Calibrate all pressure de.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA 3005 Following sea water system valve to be removed overhauled and pressure tested All material and spares Yard supply QTY 24 Valves of all system; Ser.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3006 Fresh water tank to be cleaned with liquid detergent Renew Man hole cover gasket; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3007 Fuel Oil tank to be cleaned inspect and paint the as per paint scheme Paint Yard Supply Renew Manhole Cover gasket; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3008 Fire Pump to be overhauled and proved for satisfactory operation All spares and material yard supplyMake CEM Model AM 512A; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EA3009 Bilge pump to be overhauled and proved for satisfactory operation All spares and material yard supplyMake CEM Model AM 512A; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EB3010 Fresh water handpump is not developing sufficient pressurerubberbellow is damaged To be renewed and proved; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EB3011 Quick Shut off valve cover of fireman system broken to be fabricated as per sample Material FRP Sheet Saize04x08x12 inches; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EB3012 Securing Clamps of Sw Fw and fuel systemcorroded and deteriorated to be renewed as per sample a DIA 12 10 8 6 4 2 AND QTY 6 6 8 8 12 10 Respect.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EB3013 04 nos gland bush stud of port and stbd shafting thread wornout Stud to be fabricated and fitted as per sample Dia14 mm Length72 mm Materail SS; Se.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EB3014 Both main engine emergency stop switch to be secured Location Wheel house; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; EB3015 NO01 and No02 Air Conditioner gas to be charged and system to be pressure tested and leak test to be done; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; LA5001 Engine Room supply fans with motors 02 Nos to be overhaul and bearings to be replace Make CEM Model VE35230M; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; LA5002 05 in no Battery Charger to be overhauled and proved for satisfactory operation all spares and material yard supply MakeVICTRON ENERGY ModelBLUE SM.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; LA5003 Window Wiper Overhaul the window wiper motor and gear assembly Replace bearings if required Wiper blade to be changed as per sample All spares and.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; LA5004 General Lighting Replace the damage fittings with a new one Material SS Qty 08; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - WORK BOAT 506; LB5005 Total Quantity :