| 1 | Supply of following material as per RESPO Drawings/standard technical specifications. |
| 2 | 11 KV XLPE Cable Box 3x185 SQMM |
| 3 | 11 KV XLPE Cable Box 3x70 SQMM |
| 4 | LT Clamp |
| 5 | LT I Hook |
| 6 | Nut and Bolt |
| 7 | T. Channel with Clamp |
| 8 | 3 phase 11kv DO fuse Set Heavy Duty |
| 9 | ACSR insulated Weasel for Jumpering |
| 10 | 100kva Double Circuit LT Distribution box with MCB |
| 11 | Mounting Angle for LT distribution Box |
| 12 | 1x100Sqmm LT PVC Cable single core |
| 13 | Clamp angle for panel mounting support with nuts & bolts/washers |
| 14 | Erection,installation and commissioning ofXLPE cable at line crossing of 11 KV cold feeder (33/11 KV S/s Naujheel) by completeing following works/jobs as per RESPO Drawings/Estimate with centralized and decentralized materials, mentioned below.Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate. |
| 15 | Erection of ST Pole 11 Mtr long with all accessories etc. |
| 16 | CONCREATING OF SUPPORT WITH ALL RAW MATERIAL, LABOUR ETC. |
| 17 | EARTHING COMPLETE by MS Earth rod 6 SWG Earth wire |
| 18 | COMPLETE STAY |
| 19 | CONCREATING OF STAY WITH ALL RAW MATERIAL, LABOUR ETC. |
| 20 | Laying of ACSR weasel support wire |
| 21 | Laying of 11 KV 3X185 SQMM XLPE CABLE on Pole |
| 22 | fixing/installation of 11 kv cable jointing kit 3x185 sq mm O/G |
| 23 | Installation and commisioning of VCB I/C 60/300/5A |
| 24 | laying and commissioning of 11 KV 3x70 sqmm xlpe cable overhead |
| 25 | 11 kv cable jointing kit 3x700 sqmm O/G |
| 26 | Centralized and decentralized materials mentioned below :- |
| 27 | 11 KV Incoming VCB 600/300/5A |
| 28 | 11 XLPE Cable 3x185 SQMM |
| 29 | ST Pole 11 Mtr long |
| 30 | 11 XLPE Cable 3x70 SQMM |
| 31 | 11 KV Disc Insulator with Fitting |
| 32 | 11 KV Pin INSULTOR GI Pin |
| 33 | Suppot wire ACSR Weasel Conductor |
| 34 | 11 KV XLPE Cable Box 3x185 SQMM |
| 35 | 11 KV XLPE Cable Box 3x70 SQMM |
| 36 | LT Clamp |
| 37 | LT I Hook |
| 38 | Nut and Bolt |
| 39 | T. Channel with Clamp |
| 40 | Erection, Installation and commissioning of following material under LT Protection work of 100 KVA Distribution Transformeras per RESPO Drawings/Estimate. Work Includes all cartage, carriage, T&P, raw materials and any other material/work which is required for completion of said work but not mentioned in this boq/Estimate. |
| 41 | 3 phase 11kv DO fuse Set Heavy Duty |
| 42 | ACSR insulated Weasel for Jumpering |
| 43 | 100kva Double Circuit LT Distribution box with MCB |
| 44 | Mounting Angle for LT distribution Box |
| 45 | 1x100Sqmm LT PVC Cable single core |
| 46 | Clamp angle for panel mounting support with nuts & bolts/washers |
| 47 | Chemical Earthing of TF (Neutral & Body) with all material |
| 48 | Miscellanenous Lug, clamp etc. with all material |