| 1 | Earth work in excavation of foundation in ordinary/sandy loam, clay or sand including lift upto 1.5 m. and lead upto 30.00m. including filling, watering, ramming of excavated earth in to the trenches or upto the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc.Earth work in excavation of foundation in ordinary/sandy loam, clay or sand including. |
| 2 | C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 20-40 mm including all material, labour, T&P etc. |
| 3 | First Class brick work in 1:4 c.m. with first class brick, cement and coarse sand F.M. 1.5 to 2.0 including all cost of material, labour, T&P etc. |
| 4 | Shuttering & Centering for slab and bed block including all material, labour, T&P etc. |
| 5 | Reinforcement work in slab and bed block with cutting, bending, placing, binding including cost of all material, labour, binding wire, T&P etc. |
| 6 | R. C. C. with M-20 (1:1.5:3) in slab and bed block withcement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10mm size with mechanically mixed andmechanically compaction including all cost of material, labour, T&P etc. |
| 7 | Wearing coat with M-20 (1:1.5:3) in cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm with mechanically mixed including all cost of material, labour, T&P etc. |
| 8 | Deep struck pointing in 1:2 c.m. on open new brick surface with cement and coarse sand F.M. 1.5 to 2.0 including all material, labour, T&P etc. |
| 9 | Finishing wall with water proof cement paint of approved make such as super snowcem of required shade on new wall surface with two coat of paint over one coat of primer to give an even shade after thoroughly brushing the surface to remove all dirt and remains, loose powdered materials including curing and cost of all materials, labour T&P etc. required for proper completion. |
| 10 | Earth work in filling including all cost of labour, manual compaction and T&P, lead, lift etc with royalty and its lead up to 1.0 Km. required for completion of work. |
| 11 | Supplying and fixing of wheel guard stone including cost of all material, labour, t&p etc. |
| 12 | Letter writing on V.R.B. above 80mm size including material, labour all work. |