Supply Of School Kitchen Construction Materials At Hiremagadi Mannoddigere, Hanchi Grama Panchayath, Soraba Taluk, Shimoga Dist - Mgnrega - Broken Stone Aggregate 40 Mm Size///,Broken Stone Aggregate 20 Mm Size///,Broken Stone Aggregate 12 Mm To 10 Mm Size///,Coarse Sand (Zone Iii)///,Portland Cement///,Hom Of Vibrator 0.71 Days///,Casurina Poles 100 To 150 Mm///,Casurina Poles 75 To 100 Mm Dia///,Tmt Bars Fe 500///,Binding Wire///,Mixer (Concrete Small Used In Culvert)///,Welder Grade I///,Ready Mix Primer Paint (Ready Mix Red Lead Paint)///,Painter Class I ///,Enamel Metal Paint///,Mason Class I (With Tools)///,Granite Sink 23Cm Thick//,Copper Plated Brass Piller Tap 15Mm//,Cp Brass Chain With Plug//,Cp Brass Waste 32 Mm Of Standard Pattern//,Brass Stop Cock//,Lead Or Pvc Connection Pipe 32Mm Dia (For Wash Basin)//,Licenced Plumber With Tools//,Pvc Pipes 10Kgf/Sqcm 90Mm Outer Dia//,Polyenthylene Water Storage Tank Of Specified Capacity L//,Plasticizer/Super Plasticizer//,Mathi/Nandi Wood Planks For Panels 25 Mm Thick//,Hom Of Machinaries For Planing//,Mathi/Nandi Wood Scantling//,M.S Rods//,Ms Flat//,Fitter Class I//,Nylon Rollers//,Rubber Beading For Shutters Beading//,Pvc Beading//,Cleat Angles//,Chrominum Plated Screws//,Thick Plain Glass 5.50 Mm//,Fabricator//,Dry Distemper//,Water Proofing Cement Paint//,Liquid Wood Filler//,White Cement/,Vitrified Tiles 600X600 Mm//,White Vitreous China Clay Flat Back Wash Basin Size 630X450mm/,Add White Lead Paint, Gasket, Cement, Sand For Making Good The Wall And Floor At 2% On Material/,Add 5% For Fittings And Wastage Charges/,Add Cement Sand And Grit 1% On Material/,Labour Charges For Lifting And Placing In Position And Making Connection At 7% On Material/,Handling Loading And Unloading 3% On Material/,Jungle Wood Runners And Planks/,Silver Oak Or Equivalent Planks 38 Mm Thick/,Add Handling, Loading And Unloading At 2% On Material/,Add Sundries Charges At 2% On Material/,Rubble Stones/,Bond Stone 20X20x45 Cm/,Add Sundries Charges At 1% On Labour/,Add Watering Charges At 1% On Labour/,Burnt Bricks Class 35 (Non Modular)/,Add Handling, Loading And Unloading At 1% On Material/,Add Cutting And Other Wastage 5%/,Add Hom Of Welding And Grinding Machine At 4% On Material/,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3% On Cost Of Paint/,Add Providing And Removing Scaffolding At 3% On Labour/,Add Brush At 1% On Cost Of Paint/,Alluminium Tower Bolt 20 Cm/,Alluminium Handles 15 Mm/,Add Hom Of Welding And Grinding Machine At 2% On Material/,Whitening/,Add Brush, Putty, Glue At 5% On Cost Of Paint/,Add Brush, Putty, Sand Paper, Roller At 1% On Cost Of Paint/,Primer/,Add Brush, Putty, Sand Paper At 5% On Cost Of Paint/,Lime/,Ceramic Tiles 30X30 Cms/,Add Sundries Charges At 1% On Material/,Over Head And Other Miscellaneous Charges/,Mixer (Concrete) 1 Cum Capacity/,Add Watering Charges At 1% On Material/,Powder Coated 60 To 70 Micron,C.I/M.S Brackets For Flushing Cistern