Tender For Construction Of Proposed Covered Rcc Surface Drain (1000 X 1200 Mm) From S.C. Ghosh Lane Through S.K. Palchowdhury Street To Shibtala Ghat Under Ward No. 07, 10 And 16 Within Bhadreswar Municipality (2Nd Call).
Tender Overview
Project Description
Tender For Construction of proposed covered RCC surface drain (1000 X 1200 MM) from S.C. Ghosh Lane through S.K. Palchowdhury street to Shibtala Ghat under Ward No. 07, 10 and 16 within Bhadreswar Municipality (2nd Call).
BOQ
| Sl. No. | Item Description |
| 1 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary).(Payment to be made on area cleared) |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring. |
| 4 | Dismantling all types ofmasonary excepting cement concrete, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. |
| 5 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.In ground floor including roof. a) upto 150 mm. thick |
| 6 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof.[Considering 20% of length of the drain] |
| 7 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work).(a) With earth obtained from excavation of foundation. |
| 8 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 9 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. for road restoration |
| 10 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant IS codes.a) Pakur Variety.For PCC bace |
| 11 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Varietyfor Footing bace and wall, hunch, slab, interconnectiong beam |
| 12 | Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor).(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. |
| 13 | Hire and labour charges for shuttering with centering and necessary staging up to 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (up to roof of ground floor).(f) 25 mm to 30 mm shuttering without staging in foundation. |
| 14 | Reinforcement for reinforced concrete work inall sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation, basement and up to roof of ground floor/up to 4 m .(i) Tor steel/Mild Steel (SAIL/TATA/RINL) |
| 15 | Bailing out water including all leads and lifts and including making arrangement for disposal.(2HP 8HR FOR 60 DAYS) |
| 16 | Supply of silver sand and stacking at site. |
| 17 | Supplying to the siteempty cement bags(Capacity 50 kg) in good condition including stacking , incidental charges etc all complete.(a) Polythene bags. |
| 18 | Labour for Filling empty cement gunnybags/polythene bag( capacity 50 kg) with all kinds of earth (wet or dry) including sewing (as done in case of cement bags, tying with knob after filling will not be accepted) and stacking in position within 150 m. with all lifts excluding the cost of earth (volume of earth filled Polybags should be considered as 0.028 cum) |
| 19 | Dumping of earth/sand filled polybags inclusive of all leads and lift. |
| 20 | Removing earth filled Poly bags/ Gunny bags from the channel bed/ slop initially depositing the same near channel bank at a place as directed by the E.I.C. for measurement and then disposing off the same at a distance not less than 150 m from the channel site. |
| 21 | Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc and lining the exposed portion with sheets made form cut-drums fitted and fixed complete as per direction. (a) With bamboos of length between 1.20 m. and 1.80 m. each. |
| 22 | Supplying, fitting and fixing in position reinforced cement polymer concrete manhole /gully pit cover with matching frame.As per I.S- 12592(M.D)(ii) 25 MT load bearing capacity round manhole cover provided with two lifter hooks fitted with matching frame of sizeCover: 680 mm X 90 mmFrame: 800 mm X 165 mmopening: 500mmWeight: 196 kg (approx) |
| 23 | Constructing catch pit to a depth of 1.0m (Inside) with 250mm th. 1st class Brick Work (1:4) in all sides over a layer of jhama brick soling & 100mm th. jhama cement concrete (1:4:8) including necessary earth work, providing approved type C.I. Syphone (150mm dia) with topping RCPC gully grid (5MT load bearing capacity) constructing invert withbrick-on-edge, including 20mm th. inside cement plaster (1:4) finished with neat cement punning, at the top 100mm th. R.C.C. slab (1:1.5:3) with stone chips including necessary reinforcement, shuttering as per standard drawing and as directed by E-I-C complete in all respect and removal of surplus earth with all costs of labour and materials.Inside measurement of catch pit, 600mm × 525mm |
| 24 | Supplying & laying Double Wall Corrugated (with external annular corrugation and smooth internal walls) High Density Polyethelene Pipes conforming to IS 16098 (Part-II):2013 having Stiffness Class of SN 8 with Ring Stiffness not less than 8.00 KN/Sqm. and Impact Resistance TIR value not more than 10% including necessary jointing materials for nonpressure underground Drainage, Sewerage & Cross drainage application. (ii) 200mm internal dia. |
| 25 | Supplying, fitting and fixing yard gully with approved H.C.I. grating complete.(i) 225 mm X 150 mm with 230 mm gratings |
| 26 | Supply of PVC pipes & fittings Schedule 80 (medium duty) conforming to ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239 (Part - I)(A) PVC Pipes.80 mm |
| 27 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. By Fine Sand. |
| 28 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).(i) For Construction of Sub Base by compacting 1st class brick aggregates (40 mm down) and sand (in proportion of 60:40) |
| 29 | Removal of rubbish , earth etc from the working site and disposal of the same beyond the compound , in confirmity with the municipal / corporation rules for such disposal loading into truck and cleaning the site in all respect as per direction of engineer in charge . |
| 30 | GST @ 18 % on Sl No 1 TO 35 |
| 31 | Cess @ 1 % On Sl No 1 to 36 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.