|
| 1 | Supply part of 11/.4 KV 250 KVA DISTRIBUTION SUB STATION |
| 2 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV,250 KVA |
| 3 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) |
| 4 | Prov. RCC Muff with conceret Filling (Prov. By HPSEBL) |
| 5 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line (Prov. HPSEBL) |
| 6 | Prov. MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA\"s |
| 7 | Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch (Prov. By HPSEBL) |
| 8 | Prov. Transformer Bed, Belting & Knee Bracing |
| 9 | Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 10 | Prov. X-Arm [Channel Iron (100x50x6 mm), Length : (460mm) x 2 Nos for supporting Main Channel of Transformer] |
| 11 | Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 12 | Prov. MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 13 | Prov. MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 14 | Prov. MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 15 | Prov. MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 16 | Prov. GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 17 | Prov. GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 18 | Prov. D.O Fuse Unit |
| 19 | Prov. Surge Arrester, 9 kV Station Class(Porcelain Type) |
| 20 | Prov. Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)(Prov. By HPSEBL) |
| 21 | Prov. Stay set complete (Prov. By HPSEBL) |
| 22 | Prov. Stay Wire (7/3.15 mm) (10 kg Per Stay Set) (Prov. By HPSEBL) |
| 23 | Prov. Pipe Earthing Set |
| 24 | Prov. LT Distribution Panel Box With MCCB(160A, 10KA, 4P, 1No) & SFU(32A, 5No, rewirable) (Prov. By HPSEBL) |
| 25 | Prov. Half Clamp (M.S. Flat 50X6 mm) |
| 26 | Prov. Full Clamps (M.S. Flat 50X6 mm) (Prov. By HPSEBL) |
| 27 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more(with flat and spring washers)] |
| 28 | Prov. Aluminium Thimble (Prov. By HPSEBL) |
| 29 | Prov. Copper Thimble (Prov. By HPSEBL) |
| 30 | Prov. Danger Plate (Prov. By HPSEBL) |
| 31 | Prov. Barbed Wire |
| 32 | Prov. Aluminum Paint. |
| 33 | Prov. 6/1/3.35mmsq |
| 34 | Prov. S/T Pole 8 Mtr. Long |
| 35 | Prov. Transformer structure protection plinth (Civil Work as per HPSR) for 250 KVA S/stn. |
| 36 | Erection of 250KVA S/Stn. i.e. digging of pit for pole & earthing two No. poles & 3 Nos. for earthdrilling of holes in X-arms, preparation of plateform str. Members C.I., A.L. i.e. X-arms & K.B. set, errection of D/P, concreating of RCC muff errection of plateform, errection of X-arms, D.O., L.A., MCCB, Switch LT box, energy meter, errection of transformer, earthing connection to G.O. switch, Transformer L.A. etc., errection of stay set, jumper, pipe earthing 3 Nos set, L.T. cable, barbed wire and painting complete in all respect. |
| 37 | Supply /Erection of CTPT |
| 38 | CT-PT Combined unit (PT : 11 KV/110 V):CT :10-50/5A |
| 39 | 3-PH, 4 Wire HT Meter (DLMS) |
| 40 | PVC Multistarnd 4 mm2 copper wire with 1-PH inch pipe for concealing |
| 41 | M/S Angle Iron (50X50X6mm) Length 2800mm |
| 42 | M/S Angle Iron (35X35X5mm) Length 460mmX2 |
| 43 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] |
| 44 | X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of CT-PT Unit] |
| 45 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 46 | Erection of CT PT Combined Unit Complete in all Respect |
| 47 | Prov. HP make AIQ Desktop HP 200G4 with core 3-10110U-10 Gen. processer , 8GB DDR4 RAM expenditure upto 16GB, ITB , HDO (T2QORPM) 2st antiglare LED desplay with FHD (1920X1060) Integrated HD Graphics & Webcam, 2xUSB, 3.0 2XUSB , 2.0 cardreacer. Audio part VGNHDMI/DP Part 10x 100, 1000 Mcomdliant LAN USB key board and mouse internalspl. connectivity BO2 11b/g/n/ac PL Windows etc. with three years on site warranty. (II) 650VA Ofline UPS System with 12VX 7AH X 2 Nos: 158VAH/SMF Battery to provide 20 Min. battery back upwith three year warranty UPS and Battery from delivery. |
| 48 | Prov. Brother DCP-L2680W Laser Multi Fuction Monochrome Printer |