| 1 | Item Name :- 3)WBM Grading 3Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical specification Clause 405. (A)By Manual Means |
| 2 | Item Name :- Tack Coat (i) Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30-0.40 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical pecification Clause 503. |
| 3 | 20mm thick Open-Graded Premix Carpet Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a mixall, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat Type C as per Technical Specification Clause 508. |
| 4 | Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 |
| 5 | Maintenance Charge including @ Earth work ,repair of painted surface, earth work on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 1st year (@0 % of total work amount S.No.1-5) |
| 6 | Maintenance Charge including @ Earth work ,repair of painted surface, earth work on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 2nd year (@1.50 % of total work amount S.No.1-5) |
| 7 | Maintenance Charge including @ Earth work , repair of painted surface, earth work on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 3rd year (@3.00% of total work amount S.No.1-5) |
| 8 | Maintenance Charge including @ Earth work ,repair of painted surface, earth work on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 4th year(@4.50% of total work amount S.No.1-5) |
| 9 | Maintenance Charge including @ Earth work ,repair of painted surface, earth work on patri ,culvert,road furniture etc.as per direction of E.I for the period of five years from the actual completion of workMaintenance cost for 5th year (@6.00% of total work amount S.No.1-5) |