| 1 | 1.Strengthening the road fromPudhu venkaraiyan palayam road to Kollan Valasu (Noyyal River )km 0/0 - 1/19H/O Palayakottai (working reach 0/0-1/180) |
| 2 | Clearing the Scrubjungle including all labour charges for burrying and burning etc.,complete. |
| 3 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrainetc, complete. as per SS 20 A |
| 4 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS |
| 5 | 0/0-1/0 |
| 6 | 1/0-1/180 |
| 7 | Picking the existing worn out BT surface including cost and conveyance and all other labour charges etc complete |
| 8 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. |
| 9 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. |
| 10 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., |
| 11 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat |
| 12 | BITUMINOUS CONCRETE 25/30/40 MMTHICK USING cmp (Grade-II) ProvidingandlayingBituminousConcreteto25/30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgsof VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specifiedgradesandcrosssectionsandconsolidatedby8-10tonneVibratorytothe required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 507 of MORTH Rev-5 |
| 13 | Provision for KM stone |
| 14 | Provision forHM stone |
| 15 | 900mm dia Pipe culvert ch-650 |
| 16 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation |
| 17 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation |
| 18 | Supplying and erecting centeringshuttering includingnecessary supportsfor including cost and conveyance of all materials to site and all labour charges etccomplete. |
| 19 | Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation |
| 20 | Supplyingand fixing of RCC hume pipes with suitabe Collars Including cost ofPipes and Labour charges etc, complete. |
| 21 | Provision for name board |
| 22 | Provision forphotographic charges |
| 23 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \"BB\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) |