Tender For Mines 2024-2025 Reddiyarchatram Block Block Tn-05-10-01 ( 3 Works ); 1 Part 1 :Strenthening to the Road from Mangarai Main road to Ramar Temple H/o Mangarai Estimate Amount Rs.22.00 Lakhs 2 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. 3 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2min hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.Acompacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum. 4 Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal@20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) 5 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. 6 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 7 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other 8 ProvidingandlayingBituminousConcreteto25/30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgsof VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specifiedgradesandcrosssectionsandconsolidatedby8-10tonneVibratorytothe required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 507 of MORTH Rev-5 9 Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction at 10 Provision for HM stone 11 Provision for citizen information board 12 60cm Equilateral triangle cautionary sign board 13 Provision for Bed Level causeway 14 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package} 15 Part 2 : Strenthening to the Road from Kappiliyapatti Road to Panchayat Limit H/o T.Pudhupatti Estimate Amount Rs.15.50Lakhs 16 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. 17 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2min hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.Acompacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum. 18 Picking the existing worn out BTsurface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard 19 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. 20 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 21 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other 22 ProvidingandlayingBituminousConcreteto25/30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgsof VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specifiedgradesandcrosssectionsandconsolidatedby8-10tonneVibratorytothe required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 507 of MORTH Rev-5 23 Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction at 24 Provision for HM stone 25 Provision for citizen information board 26 60cm Equilateral triangle cautionary sign board 27 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package} 28 Part 3 :Strenthening to the Road from Pudhupatti Main road to Mangarai RoadH/o T.Pudhupatti Estimate Amount Rs.10.00Lakhs 29 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. 30 Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2min hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.Acompacting etc., complete complying with std. Specifications and as directed. Rate for 10 cum. 31 Picking the existing worn out BTsurface hard gneiss, granite,quartz metal 50mm to 100mm thick and repacking the metal to bring the existing surface to camber including leveling and sectioning as indicated by the departmental officer including labour charges for picking tools and equipments employed and all other incidental charges etc., complete as per standard 32 Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. 33 Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. 34 Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other 35 ProvidingandlayingBituminousConcreteto25/30/40mmthickusing0.13cumof19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgsof VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heatingthebitumenandaggregatetorequiredtemperatureandmixingtheminrequired temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paversite,spreadingthemixtouniformthicknessof40mmwithmechanicalpavertothe specifiedgradesandcrosssectionsandconsolidatedby8-10tonneVibratorytothe required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete asper specification using CMP as per clause 507 of MORTH Rev-5 36 Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, wateringand compacting by Power roller to achieve the required Proctor density at 100% compaction at 37 Provision for HM stone 38 Provision for citizen information board 39 60cm Equilateral triangle cautionary sign board 40 GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column BB for all works in this package}