|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50meters and lift upto 1.5 m,as directed by Engineer-in-Charge. All kinds of soil. |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains,pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspitsand the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed- 1 meter from cutting edge: All kinds of soil. |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with- 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 cement : 6 coarse sand) |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone. |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with- 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. |
| 8 | Excavating, supplying and filling of local earth (including royalty)by mechanical transport upto a lead of 5 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete |
| 9 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes- 900 mm dia. R.C.C. pipe |
| 10 | Construction of CIB (including Concrete/Brick Pedestal of size 3\"X2\", plastering, painting all complete job asper the direction of Engineering In-charge. |
| 11 | Carriage of material from source to site of work by MT & HL including loading, unloading and stacking complete.. |
| 12 | Cement 15.00 KM by MT. |
| 13 | Sand and stone agg. 30.00 KM by MT. |
| 14 | Stone 400 Mtr by HL/AT |