Construction of Drainage at Kucchippalaiya Nadu Street in Kodavasal Town Panchayat.; 1 Earth Work Excavation for foundation in all types of soils and sub soils to full depth (such as Soils in Rock / Silt / Light Black Cotton Soil / Ordinary Soil ) except in rock requiring blasting but inclusive of shoring, shuttering and bailing out water wherever necessary and refilling the sides of foundation with excavated earth other than sand in layers of 150 mm thick well rammed and consolidated, depositing the surplus earth in places shown by the Departmental Officers with initial lead of 10 m and initial lift of 2 m. Complete as per TNDSS23 & 24, V, VI (S2), VII, 9,10 2 Collection supply and filling of well gravel filling approved quarry including cost andConveyance of all materials to site and all labour charges for filling etc., Complete. 3 Plain Cement Concrete of mix 1 : 4 : 8 (One part ofCement four part of sand eight part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII 4 Supplying anderrectingsteel centering including necessary supportsfor plain surfaces for Reinforced Cement Concrete works such as Coloumn footing,Coloumn pedestals,plith beams, grade beams,staircase steps,etc which requires only nominal strutting using mild steel sheetsof size 90mm x60mm and 10Bg stiffened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervels etc complete in all floorsComplying with standard Specification without Strutting. ( TNSS NO or NBC No 30(S) 86 86 A V, VI(S3)VII 5 Without Strutting 6 With Strutting 7 Reinforced Cement Concrete 1:1½:3 Mix (One Part of cement, one and half Part of M- Sand and three Part ofaggregate)using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing but excluding cost of reinforcement etc.Complete with std.Specifications.(Using Vibrator)TNDSS NO: 30 V, VI (S3), VII-3. 8 Supplying and fabrication of steel and placing in position of TMT steel rods for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specification in TNDSS NO:97 V,VI (S6) VII (S6), VII-3. 9 Plain Cement Concrete of mix 1 : 2 : 4(One part of Cement twopart of sand four part of aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII 10 Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.