}

Tender For Supply, Installation And Commissioning Of Spm Analyzers (Dust/Opacity Monitors) At Outlet Of Esp Hoppers Id Fan Ducts Of Rtps Units-5,6&8., Raichur-Karnataka

Karnataka Power Corporation Limited has published Tender For Supply, Installation And Commissioning Of Spm Analyzers (Dust/Opacity Monitors) At Outlet Of Esp Hoppers Id Fan Ducts Of Rtps Units-5,6&8.. Submission Date for this Tender is 10-12-2024. Scientific Equipment Tenders in Raichur Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

46481430
Tender For Supply, Installation And Commissioning Of Spm Analyzers (Dust/Opacity Monitors) At Outlet Of Esp Hoppers Id Fan Ducts Of Rtps Units-5,6&8.
Tender
Indian
Karnataka
Raichur
10-12-2024

Tender Details

Supply, Installation And Commissioning Of Spm Analyzers (Dust/Opacity Monitors) At Outlet Of Esp Hoppers Id Fan Ducts Of Rtps Units-5,6&8.B)Materials Supply Shall Be Completed In All Respect Within The Stipulated Period As Per The Contract. Materials Shall Be Delivered To Rtps Site Through Ee(Stores)O&M. Unloading Of Materials At Rtps Site Location And Shifting Of The Same To Work Location Is Under The Contractor/Agency Scope Only.C)The Installation And Commissioning Of All The Supplied Materials And Ensuring Satisfactory Performance Of The Commissioned System At Rtps Site Shall Be On The Basis Of Single Point Responsibility, Completely Covering The Activities And Services In Respect Of All The Equipment & Works Specified And Covered Under The Specifications.D)Handling, Shifting, Unpacking And Erection And Commissioning Of The Entire System Shall Be Under The Scope Of Bidder Itself. E)All Required Consumables, Hardware And Software, Accessories, Providing Mounting Flanges/Fixtures For The Installation Of Spm Analyzers (Dust/Opacity Monitors) Along With Fabrication And Welding Of Materials Required During Installation Works And Providing Any Other Materials Required Which Are Not Included In The Scope For Successful Installation And Commissioning Of The Spm Analyzers (Dust/Opacity Monitors) At Outlet Of Esp Hoppers Id Fan Ducts Of Rtps Units-5,6&8 Are Under The Contractor/Agency Itself.F)All The Materials Required For The Installation And Commissioning Of Spm Analyzers (Dust/Opacity Monitors) At Outlet Of Esp Hoppers Id Fan Ducts Of Rtps Units - 5,6&8 Shall Be Provided As Detailed Under The Technical Specifications.G)Warranty All The Materials Supplied Shall Cover A Warranty For A Period Of 12 Months From The Date Of Commissioning Or 18 Months From The Date Of Supply. Any Faulty Items/Spares Observed During This Period Shall Be Replaced At Free Of Cost.

Key Value

Document Fees
INR 630 /-
EMD
INR 50270.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail