| 1 | Inlet Head Works |
| 2 | Jack well (Intake Structure) |
| 3 | Providing, Supplying and Fixing of MS structure for Pump fixing and Lifting mechanism with MS platform and chain pully. |
| 4 | Construction of RCC Check Dam (32.77MTR ) |
| 5 | Provision for land area development |
| 6 | WTP at Tindolong New Plant (2.5 MLD) |
| 7 | Design, Construction, Supply of Materials, Erection, Installation & commissioning of Complete WTP Pressure filtration System Plant of average 1.50 lakhs litre/hr capcity (2w+1SB) with SCADA conpatible pressure monitoring , controlling and back washing mechanism |
| 8 | Aerator |
| 9 | Sedimentation Tank |
| 10 | Flash Mixture & Parshall Flume |
| 11 | Clarriflocculator |
| 12 | Alum, Lime Dosing System & Electrochlorinator |
| 13 | Sludge Disposal System |
| 14 | Distribution network with valves, specials & house service connection |
| 15 | Manufacture and Supply of HDPE Distribution pipes i/c trending, procurement of fittings materials, T&P etc. all complete DN250 -1973, Fitting & fixing -1973, DN200-884a) WTP to Zonal Tankpipeline HDPE PE100 PN12.5- DN250 -1973mtr &Fitting & fixing -1973mtr, DN 200-884-mtr & Fitting & fixing -884mtr, DN 125-816-mtr & Fitting & fixing -816mtr, DN 110-2404-mtr & Fitting & fixing -2404mtr, Fittingb)Distribution pipeline HDPE PE 100 PN 12.5- DN250 -707mtr &Fitting & fixing -707mtr, DN 200-2763-mtr & Fitting & fixing -2763mtr, DN 160-5556-mtr & Fitting & fixing -5556mtr, DN 125-4082mtr & Fitting & fixing -4082mtr, DN 110-3869mtr & Fitting & fixing -3869mtr, DN 90-14455mtr & Fitting & fixing -14455mtr, DN 63-29399mtr & Fitting & fixing -29399mtr, Fitting |
| 16 | Provision House service connectionHouse Connection Pipes HDPE PE100 PN10- a) DN50-12881mtr & fitting/fixing-12881mtrb) DN40-17501mtr & fitting/fixing-17501mtr, c) Fitting, d) House Service Connection Pipe with Water Meter (4179 Nos) |
| 17 | Installation of Valves, field instruments & Controllersa) Providing, Supplying, installation & commissioning of WTP (4 Nos) Zonal TankInlet & Outlet (26 Nos)Control Valves with flow Meter, Pressure Transmitter, Level Transmitter, Air Valves, Isolation Valves with RTU and necessary fittings and Valve Chamber (30 Nos)b) Providing, Supplying & Installation of Air Valve Setup with necessary fittings of PN16 for Transmission and distribution Pipeline (45 Nos)c) Providing, Supplying & Installation of Isolation & drain Valve Setup PN16 for Transmission & Distribution Pipeline (14 Nos)d) Providing, Supplying & Laying-fixing of Fire hydrants and 20mtr hose at strategic locations including gate valves and civil chambers with all necessary fittings (13 Nos) |
| 18 | Provision for Anchor Block |
| 19 | SCADA System for monitoring & operation of WSS at Tindolong |
| 20 | Providing, Supply, Installation, Commissioning of complete SCADA System for monitoring & operation of Water Treatment Plant |
| 21 | Pumping system (Hybrid mode) at Tindolong |
| 22 | Design, Supply, Installation of Solar Power plant (200 KW) all Electrical and mechanical items complete |
| 23 | 3 Phase power supply & Sub Station of 625 KvA |
| 24 | a) 11 KV HT Line with MVCC |
| 25 | b) 630 KVA 11/0.415KV Sub-Station |
| 26 | ) VCB/RMU/GOAB & DO and 3 P E/M |
| 27 | Raw water pumping (2 Working +1 Standby) system with 200m pipes all E&M field instruments |
| 28 | Clear water pumping (2W +1S) system with 200m pipes all E&M field instruments |
| 29 | Clear water reservoir |
| 30 | Ground level clear water reservoir |
| 31 | Electrical Transformer & Genset at Tindolong |
| 32 | Provision for electrical Generator Set |
| 33 | Other Components |
| 34 | RCC building for SCADA Room & office |
| 35 | Bachelor Bararck for security personnel and staffs at WTP |
| 36 | Chemical House with store room |
| 37 | RCC Drainage network |
| 38 | CC Pathways inside WTP |
| 39 | Approach Road to WTP |
| 40 | Boundary wall around WTP & Zonal Tank premises a) Boundary Wall Around WTP Premises at Tindolongb)Boundary wall around Zonal Tank Premises (12 Nos) |
| 41 | Entry gate and Secutiry Room |
| 42 | Surveillance Camera for WTP Area |
| 43 | Pipes |
| 44 | Provision for K7 DI raw main 200 mm Dia pipe i/c laying & fitting, fixing, a) DI Pipeline Intake to WTP DN200 K7 i/c Fittings & specials (800 rmt) |
| 45 | WTP at Shivaji Nagar |
| 46 | Headwork |
| 47 | Alum Lime Dosing & Electrochlorinator |
| 48 | Construction of Clarrifloculator |
| 49 | Construction of Pressure sand filter with filter house |
| 50 | Other Components at Shivaji Nagar |
| 51 | Provision for formation cutting for footpath |
| 52 | River Crossing at Tezu Nallah for raw main a)Suply of materials b)Construction c) Carrying charges of materials |
| 53 | SCADA System for monitoring & operation of WTP |
| 54 | 3 Phase power supply & Substation |
| 55 | a) 11 KV HT Line with MVCC |
| 56 | b) 100 KVA 11/0.415KV Sub-Station |
| 57 | ) VCB/RMU/GOAB & DO and 3 P E/M |
| 58 | 250 KvA DG Set |
| 59 | Generator Shed |
| 60 | SCADA & Control Room with office (5x5m) |
| 61 | Design and Construction of 1 No\"s Elevated Staging with suitable Structural design capacity 140000 Litre Zonal Tank with conformity with the department all complete,(1 Unit) |
| 62 | Design and Construction of 3 No\"s Elevated Staging with suitable Structural design capacity 150000 Litre Zonal Tank with conformity with the department all complete, (3 Unit) |
| 63 | Design and Construction of 2 No\"s Elevated Staging with suitable Structural design capacity 200000 Litre Zonal Tank with conformity with the department all complete, as directed and specified. (2 Unit) |
| 64 | Design and Construction of 1 No\"s Elevated Staging with suitable Structural design capacity 250000 Litre Zonal Tank with conformity with the department all complete, as directed and specified. (1 Unit) |