Shifting of EB Poles at Km 156/6 of Madurai - Kaniyakumar Road
Sl. No.
Item Description
1
1. Supplying and fixing of HT/LT OH FEEDER ERECTION including cost and conveyance of materials and including labour and all other incidental charges etc., as per EB Sanction No: as per EB Sanction No: 0120911/CE/D/Tin/EE/EI/AEE/Tech/F.Est. 105/2024-25/Dt:13.11.2024.
2
Mini Tower
3
42\" RSJ Pole 250*125mm (8 Nos)
4
8 Mr PSC Pole 200 Kg WL
5
Base Plate
6
V X Arn 1373 MM 4.6\"
7
V X Arm 1068 MM 3.6\"
8
Three Phase Cross Arm
9
Single Phase Cross Arm
10
Gaurding X Arm
11
33 KV Tapping Channel X Arm
12
11 KV Tapping Channel X Arm
13
33 KV HT Pin Insulator
14
33 KV Polymer Disc
15
11 KV Polymer Pin Insulator
16
11 KV Polymer Disc
17
Aluminium Knob
18
Metal Parts for DOG and Racoon Conductor
19
Back Clamp for RSJ Pole
20
LT Shackle
21
LT Metal Parts
22
LT Pin Insulator
23
LT Pin Only
24
Stay Clamp for RSJ Pole
25
33 KV HT TI Fitting
26
11 KV HT TI Fitting
27
8 mtr PSC Pole Back Clamp
28
Stay set Complete
29
Stay wire
30
Stay Shackle
31
Pole Concreting
32
Bolt & Nut MS 3 1/2\"X5/8\" 88/90X16MM
33
UG Cable 3*300 Sq.mm
34
Termination Kit
35
Stay Clamp for RSJ Pole - cable fixing
36
V Through
37
DOG CONDUCTOR
38
AAAC 7/3.50 mm Conductor
39
AAAC 7/2.50 mm Conductor
40
GI Wire No 8 for Pole earthing
41
Stay Clamp for Pole Earthing
42
GI Wire No 6 for Guarding Arrangement
43
Cost of the Materials Suppplied at Site
44
Storage charges 3% of Cost of the Materials Suppplied at Site
45
Sub Total(i)
46
Labours and Transport Charges 15% of Cost of the Materials Suppplied at Site
47
LT Service DC & RC
48
Sub Total(ii)
49
Dismantling Charges for reusable Materials devoluted to store (B)
50
Transporting Charges for Scrap Materials devoluted to Store
51
Calculation of SubTotal, GST and Total Amount carried out by system automatically
52
Basic cost of value put to tender as per estimate
53
Add GST at 18%
54
Total Value put to Tender
55
Negotiated Percentage
56
Final Negotiated Value
57
Add GST at 18% of Final Negotiated Value
58
Total Value of Contract Including 18% of GST
59
Basic cost of value put to tender as per Estimate
60
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.