| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrockrequiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum |
| 2 | Random rubble masonry in(one Part of cement, Five part of Crushed Stone Sand (M- Sand)) mix using all granite stones and bond stones for foundation and basement from approved quarry including watering, curing, and labour charges etc., completed as per standard specification |
| 3 | Paving the floor with Double charged Vitrified tiles of approved quality and colour of size 600x600x8mm thick of approved make, quality and colour in all floors over a base layer of cement mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 20mm thick and laid straight alignment and pointed neatly with colour cement at the rate of 0.40kg/m2 laid without any air gap in the tiles neatly and fixing in position as per standard specifications and as directed by the departmental officer.The colour & quality of tiles should be got approved by Municipal Engineer before use on work |
| 4 | Finishing the top of roof with one course of machine pressed tiles of size 200 mm x 200 mm x 20 mm of approved quality in Cement Mortar 1:3 (One part of Cement and Three part of Plastering Sand (P- Sand)), 12 mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete |
| 5 | Plastering in Cement Mortor 1:5 Mix (one cement, five sand) 12mm thick including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications. |
| 6 | Supply and fixing of sanitary pipes and specials including cost andConveyance of all materials to site and all labour charges for filling etc., Complete. |
| 7 | IWC |
| 8 | 110 mm PVC pipe |
| 9 | 110 mm PVC Elbow |
| 10 | 110 mm PVC Tee |
| 11 | Supply and fixing of PVC pipes and specials including cost andConveyance of all materials to site and all labour charges for filling etc., Complete. |
| 12 | 25 mm PVC Elbow |
| 13 | 25 mmPVC Tee |
| 14 | 25mm x 20 mmPVC Reducer |
| 15 | 20mm PVC Nalli |
| 16 | 25 mm PVC pipe |
| 17 | 25 mmBall valve |
| 18 | Supply and fixing of WT bulk head fitting with guard suitable with 7W / 9W LED bulb including cost andConveyance of all materials to site and all labour charges for filling etc., Complete. SD 84 |
| 19 | Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specificationsfor 10 sqm |