| 1 | Construction of Mini Community Sanitary complex Near Idinthakarai Saveriyar Kovilin VijayapathiPanchayat in Radhapuram Panchayat Union |
| 2 | Earth workexcavation and depositing on bank with in initial leadlift in hard gravelly soilforfoundation etc. complete. |
| 3 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance ofall materials to site and all labour charges etc complete. |
| 4 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to siteand all labour charges etc complete. |
| 5 | Foundation and Basement |
| 6 | Above Basement(Super structure) |
| 7 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center |
| 8 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labourcharges etc., Complete.( Super Structure) |
| 9 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 10 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 11 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 12 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 13 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 14 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 15 | Painting two coatwith ready mixedplastic emulsion of firstquality paint and of approved colour over apriming coatincluding thorogh scarpping clean removal of dirt etc., complete as per standard specification. |
| 16 | Provision for Elastomeric paint over roof |
| 17 | Cost and supply of IWC |
| 18 | Cost and supply of EWC |
| 19 | Cost and supply ofWood plastic Composit door |
| 20 | Door D1 0.75 m x 1.80m |
| 21 | Door D 1.20m x 1.80 m |
| 22 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour |
| 23 | RCC Ring |
| 24 | Round Slab |
| 25 | Sanitary arrangements |
| 26 | 110 mm dia pvc pipe |
| 27 | 500 lit HDPE tank |
| 28 | Construction of Mini Community Sanitary complex at Keela Vijayapathi PDS in VijayapathiPanchayat in Radhapuram Panchayat Union |
| 29 | Earth workexcavation and depositing on bank with in initial leadlift in hard gravelly soilforfoundation etc. complete. |
| 30 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance ofall materials to site and all labour charges etc complete. |
| 31 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to siteand all labour charges etc complete. |
| 32 | Foundation and Basement |
| 33 | Above Basement(Super structure) |
| 34 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center |
| 35 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labourcharges etc., Complete.( Super Structure) |
| 36 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 37 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 38 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 39 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 40 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 41 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 42 | Painting two coatwith ready mixedplastic emulsion of firstquality paint and of approved colour over apriming coatincluding thorogh scarpping clean removal of dirt etc., complete as per standard specification. |
| 43 | Provision for Elastomeric paint over roof |
| 44 | Cost and supply of IWC |
| 45 | Cost and supply of EWC |
| 46 | Cost and supply ofWood plastic Composit door |
| 47 | Door D1 0.75 m x 1.80m |
| 48 | Door D 1.20m x 1.80 m |
| 49 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour |
| 50 | RCC Ring |
| 51 | Round Slab |
| 52 | Sanitary arrangements |
| 53 | 110 mm dia pvc pipe |
| 54 | 500 lit HDPE tank |
| 55 | Construction of Mini Community Sanitary complex at Kaduthula PDS in VijayapathiPanchayat in Radhapuram Panchayat Union |
| 56 | Earth workexcavation and depositing on bank with in initial leadlift in hard gravelly soilforfoundation etc. complete. |
| 57 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance ofall materials to site and all labour charges etc complete. |
| 58 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to siteand all labour charges etc complete. |
| 59 | Foundation and Basement |
| 60 | Above Basement(Super structure) |
| 61 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center |
| 62 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labourcharges etc., Complete.( Super Structure) |
| 63 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 64 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 65 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 66 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 67 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 68 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 69 | Painting two coatwith ready mixedplastic emulsion of firstquality paint and of approved colour over apriming coatincluding thorogh scarpping clean removal of dirt etc., complete as per standard specification. |
| 70 | Provision for Elastomeric paint over roof |
| 71 | Cost and supply of IWC |
| 72 | Cost and supply of EWC |
| 73 | Cost and supply ofWood plastic Composit door |
| 74 | Door D1 0.75 m x 1.80m |
| 75 | Door D 1.20m x 1.80 m |
| 76 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour |
| 77 | RCC Ring |
| 78 | Round Slab |
| 79 | Sanitary arrangements |
| 80 | 110 mm dia pvc pipe |
| 81 | 500 lit HDPE tank |
| 82 | Construction of Mini Community Sanitary complex at Idinthakarai Library in VijayapathiPanchayat in Radhapuram Panchayat Union |
| 83 | Earth workexcavation and depositing on bank with in initial leadlift in hard gravelly soilforfoundation etc. complete. |
| 84 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance ofall materials to site and all labour charges etc complete. |
| 85 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to siteand all labour charges etc complete. |
| 86 | Foundation and Basement |
| 87 | Above Basement(Super structure) |
| 88 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center |
| 89 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labourcharges etc., Complete.( Super Structure) |
| 90 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 91 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 92 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 93 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 94 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 95 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 96 | Painting two coatwith ready mixedplastic emulsion of firstquality paint and of approved colour over apriming coatincluding thorogh scarpping clean removal of dirt etc., complete as per standard specification. |
| 97 | Provision for Elastomeric paint over roof |
| 98 | Cost and supply of IWC |
| 99 | Cost and supply of EWC |
| 100 | Cost and supply ofWood plastic Composit door |
| 101 | Door D1 0.75 m x 1.80m |
| 102 | Door D 1.20m x 1.80 m |
| 103 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour |
| 104 | RCC Ring |
| 105 | Round Slab |
| 106 | Sanitary arrangements |
| 107 | 110 mm dia pvc pipe |
| 108 | 500 lit HDPE tank |
| 109 | Construction of Mini Community Sanitary complex at Idinthakarai PDS in VijayapathiPanchayat in Radhapuram Panchayat Union |
| 110 | Earth workexcavation and depositing on bank with in initial leadlift in hard gravelly soilforfoundation etc. complete. |
| 111 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance ofall materials to site and all labour charges etc complete. |
| 112 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to siteand all labour charges etc complete. |
| 113 | Foundation and Basement |
| 114 | Above Basement(Super structure) |
| 115 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center |
| 116 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labourcharges etc., Complete.( Super Structure) |
| 117 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 118 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 119 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 120 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 121 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 122 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 123 | Painting two coatwith ready mixedplastic emulsion of firstquality paint and of approved colour over apriming coatincluding thorogh scarpping clean removal of dirt etc., complete as per standard specification. |
| 124 | Provision for Elastomeric paint over roof |
| 125 | Cost and supply of IWC |
| 126 | Cost and supply of EWC |
| 127 | Cost and supply ofWood plastic Composit door |
| 128 | Door D1 0.75 m x 1.80m |
| 129 | Door D 1.20m x 1.80 m |
| 130 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour |
| 131 | RCC Ring |
| 132 | Round Slab |
| 133 | Sanitary arrangements |
| 134 | 110 mm dia pvc pipe |
| 135 | 500 lit HDPE tank |
| 136 | Construction of Mini Community Sanitary complex Near Idinthakarai Bus stop in VijayapathiPanchayat in Radhapuram Panchayat Union |
| 137 | Earth workexcavation and depositing on bank with in initial leadlift in hard gravelly soilforfoundation etc. complete. |
| 138 | Plain Cement concrete 1:4:8 mix using 40mm ISS metal including all cost and conveyance ofall materials to site and all labour charges etc complete. |
| 139 | Brick work CM 1:5 mix using good country bricks including cost and conveyance of all materials to siteand all labour charges etc complete. |
| 140 | Foundation and Basement |
| 141 | Above Basement(Super structure) |
| 142 | Supplying and errecting centering are strutting including necessary supports for place surface for RCC columns footing pedestal beam criticals pears etc.,using mild steel angles of sizes 90 x 90 x 10 cm gauge stifness welded mild steel of sizes 25 x 25 x 3 cm for boarding laying over silver oak joists of single 10cm - 6.5cm space of 75cm ceter to center |
| 143 | R C C 1:11/2:3 mix usinig 20mm ISS HBG metal including all cost and conveyance of labourcharges etc., Complete.( Super Structure) |
| 144 | Supplying and Fabrication of steel for RCC works including all cost of cutting bending and tying of steels and kept ready for concrete in position etc., |
| 145 | Plastering with cement 1:3-10mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 146 | Plastering with cement 1:5-12mm thick includingcost and conveyance of al materials to siteand all labour charges etc complete. |
| 147 | Paving the flooring with special type of flooring tiles (Cement based Hydraulically pressed Anti skid tiles (20mm thick) in CM 1:3, 20mm thick |
| 148 | Dadooing walls Plain Galzed tiles of size 150x150x6mm |
| 149 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the wallssmooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. |
| 150 | Painting two coatwith ready mixedplastic emulsion of firstquality paint and of approved colour over apriming coatincluding thorogh scarpping clean removal of dirt etc., complete as per standard specification. |
| 151 | Provision for Elastomeric paint over roof |
| 152 | Cost and supply of IWC |
| 153 | Cost and supply of EWC |
| 154 | Cost and supply ofWood plastic Composit door |
| 155 | Door D1 0.75 m x 1.80m |
| 156 | Door D 1.20m x 1.80 m |
| 157 | Cost, Supply and fixing of Precast RCC Ring, including all cost and labour |
| 158 | RCC Ring |
| 159 | Round Slab |
| 160 | Sanitary arrangements |
| 161 | 110 mm dia pvc pipe |
| 162 | 500 lit HDPE tank |