| 1 | Excavation in foundation in ordinary Soil (Loam, Cley or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251) |
| 2 | Earth work in Filling in ordinary Soil (Loam, Clay or sand) including, lift up to 1.50 M and lead up to 30 M and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge up to a distance of 30 M form the foundation trenches. Including royalty. (SI No. 251) |
| 3 | Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10) |
| 4 | Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1) |
| 5 | Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3) |
| 6 | Providing and laying of 22.4-53mm gauge stone ballast 10cm thick (loose) coat including reparing of patches picking up to old surface spreading, ballast making medhies to retain water and carriage of metal up to 30m carriage of water upto 200m maintenance of barriers and all labour T&P including Road Roller Charges etc. required for proper completion of work The stone ballast is to be supplied to the contractor free of cost at site. {S.I. No. 755(c)} |
| 7 | Providing and laying of stone dust etc. all complete |
| 8 | Construction of stone ballast 10 cm thick (loose) coat including repairing of patches picking up to old surface spreading ballast making medhies to retain water and carriage of metal upto 30m carriage of water up to 200m maintenance of barriers and all labour T&P including road roller charges etc. required for proper completion of work the stone ballast is to be supplied to the contractor free of cost at site |
| 9 | Supply & fixing of pre-cast M-30 cement concrete Coloured INTERLOCKING TILES over 40mm thick local sand bed, with 3mm thick joints filled with local sand including leveling, tempering and sweeping etc., interlocking bricks will be as description given in direction issued by the IRCSC-03-2004 and should be ISI marked all complete. (N.S.) 60mm thick, Strength should not less than M-30 (NS) |
| 10 | 12mm thick cement plaster in single coat of fair side of single of half brick wall forinterior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii)) |
| 11 | Finishing walls putty approved brand and manufacture and of required shade and undecorated wall surface to give and even shade over and including curing and cost of all materials. (New Item) |
| 12 | Finishing walls with exterior emulsion paint (Apex) of approved brand and manufactured and of required shade and undecorated wall surface to give even shade over @ 1.25 Ltr/10sqm including one coat of primer applied @ 0.75Ltr./10sqm coat curing and cost of all material, labour, T&P etc. required for proper completion of work for two coat. |
| 13 | Mild Steel or iron in plain work such as reinforced concrete or reinforced brick work (When not included in and an overall rates) brought to required shape as necessary including bending for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level. (10 mm to 12mm tor (TMT Bars). |
| 14 | Supply/Fixing of Black Granite Stone work display board. (NS) |
| 15 | Sub Total (A) |
| 16 | Add / Deduction For Estimate Figure Amount Match |
| 17 | Grand Total |