| 1 | DismantlingCement concrete / RCC by manually or by mechanical means as per relevant Indian standards code including stacking of serviceable materials and disposal of unserviceable materials within a leadof 50 meters or as directed at site including cutting the exposed rods upto required level including all labour, tools and equipments lifting , transport , unloading etc complete. |
| 2 | Providing, hostingand fixing in position precast reinforced cement concrete as per IS : 456 - 2000 of grade 1:1.5:3 in volumetric proportions (1 cement: 1.5 coarse river sand / M sand as per IS 383: 3 graded hard granite stone aggregate of 20 mm nominal size) in cable chase slabs works as per relevant specifications, drawings and as directed including mixing, transporting, placing, vibrating, curing, centering, shuttering includinding cleaning the drains and disposal of waste materials within the lead of 2KM as per the instruction ofEngineer-In-Charge but exculding the coat of reinforcement includingall labour, material, equipments, tools, plants, fuel, etc. complete |
| 3 | Supplying, transporting and fabricating steel reinforcement as per Indian standard code 1786 and placing in positionfor all RCC members, as shown in the drawing including all handling, straightening, cutting, bending, placing in position and binding with 1.25mm dia binding wire all complete includingcost of all materials, labour, lifting, tools, equipments, etc., complete. |
| 4 | Taking out existing Cement Concrete interlocking paver blocks from damged protion of yard including removal of rubbish etc. disposal of unserviceble material and staking of serviceable materials within 50m leas as per the direction of Enginner-in-Charge |
| 5 | Laying old cement cocrete interlocking paver blocks of any design/ shape laid in requiredline, level, curvature, colour and pattern over and including 50 mm thick compacted bed ofcoarse sand, filling the joints with fine sand etc. all complete as per the as per relevant Indian standards code and direction of Engineer in charge. (Old CC paver blocks shall be supplied by the department free of cost with in lead of 500m). |
| 6 | Cleaning the open storm water drains by removing mud accumulated and vegetations growths instruction of the Engineer-In-Charge including cleaning the area about 1m wide along both sides of the drain and disposal of waste materials within the lead of 2KM including the cost of hiring charges for tractor with trolley, labours, tool & plant, disposal of waste materialsetc required to complete the worksatisfactorily |
| 7 | Earth work in excavation by mechanical means Hydraulic excavator/ Manual means over area (exceeding 30cm in depth, 1.5m in width as well as 10 sqm in plan for providing storm water drain as per the as per relevant Indian standards codeincluding getting out and disposal of excavated earth lead upto 50m andfor all lift, as directed by Engineer-in- Charge |