| 1 | Plant & Equipment Supply (Ex-Works India), without Type Test Chargesexcept for FGD System |
| 2 | Steam Generator System (Excluding Factory Fabricated Steel Structures, Electrical Systems and C&I System) |
| 3 | Steam Turbine Generator System (Excluding Factory Fabricated Steel Structures, Electrical Systems and C&I System) |
| 4 | Balance of Plant Systems (Excluding Factory Fabricated Steel Structures, Electrical Systems and C&I System) except for FGD System |
| 5 | Electrical Systems except for FGD System |
| 6 | C&I Systems except for FGD System |
| 7 | Factory Fabricated Steel Structures except for FGD System |
| 8 | Any other Main Equipment not covered in 1.1 to 1.6 above but required for the Scope of work under the package |
| 9 | TOTAL MANDATORY SPARES Supply (Ex-Works India), [BOQ AS SPECIFIED IN Sub-SECTION VI, PART-A, SECTION-VI](Bidder is required to furnish the prices of all the items serially as specified in Sub-section-VI, Part-A, Section-VI)except for FGD System |
| 10 | TOTAL OF TYPE TEST CHARGES(AS PER FURTHER BREAK-UP OF TYPE TEST CHARGES GIVEN IN SCHEDULE-8) except for FGD System |
| 11 | Transportation including costs incidental for delivery at site except for FGD System |
| 12 | Main Equipment |
| 13 | Mandatory Spares |
| 14 | Transit Insurance except for FGD System |
| 15 | Main Equipment |
| 16 | Mandatory Spares |
| 17 | Installation Services including Storage, Erection, Testing, Commissioning, Insurance Covers except transit insurance & other services, excluding Civil Works & Site Fabricated Structural Works except for FGD System |
| 18 | Plant & Equipments for Steam Generator System (Excluding Factory Fabricated Steel Structures, Electrical Systems and C&I System) |
| 19 | Plant & Equipments for Steam Turbine Generator System (Excluding Factory Fabricated Steel Structures, Electrical Systems and C&I System) |
| 20 | Plant & Equipments for Balance of Plant Systems (Excluding Factory Fabricated Steel Structures, Electrical Systems and C&I System) except for FGD System |
| 21 | Plant & Equipments for Electrical Systems except for FGD System |
| 22 | Plant & Equipments for C&I Systems except for FGD System |
| 23 | Erection of Factory Fabricated Steel Structures (corresponding to structures whose supplies are covered underSchedule-2) except for FGD System |
| 24 | Erection of Any other Main Equipment not covered in 6.1 to 6.6 above but required for the Scope of work under the package |
| 25 | Amount linked to Safety Aspects/ compliance to Safety Rules except for FGD System |
| 26 | Civil, Structural & Architectural works except for FGD System |
| 27 | Civil, Structural (Other than Site Fabricated Steel Structures) & Architectural works except for FGD System |
| 28 | Site Fabricated Steel Structures Supply, fabrication & erection of site fabricated steel structural works (structural works other than factory fabricated structures) permitted for fabrication at site except for FGD System |