Power Boards / Undertakings / PSU Closing in 0 days TDR #46391207

Tender For Different Maintenance And Repairing Annual Running Work In The Area Of E.U.D.D-Rajajipuram, Central Zone, Lesa, Lucknow Sl. No. Item Description 1 Safe Carriage, Loading And Unloading Of Following Material From Esc Daliganj, Lucknow To Wo

Issued by Boards / Undertakings / PSU · rajajipuram, Uttar Pradesh
Tender Value
6 Lakhs
Estimated cost
Bid Submission
02 Dec 2024
0 days left
EMD
6000
Bank guarantee accepted
Document Fee
1180
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
rajajipuram → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

tender for Different maintenance and repairing annual running work in the area of E.U.D.D-Rajajipuram, Central Zone, LESA, Lucknow Sl. No. Item Description 1 Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store. 2 PCC Pole 8.5/9 Mtr. long. 3 S.T.P. Pole 9/11 Mtr. long. 4 Fabrication and erection of missing/damaged wire mesh fencing 02 Mtr. height with a gate and with retaining wall including grouting of fabricated M.S. Angle 65X65X6 mm. support (05 Nos. in a Sub-Station). Painting of fencing/support with all material as per specification/drawing complete in all respect. 5 Repairing of damage/Rusted Steel Tubular Pole by digging of pil up to 2 for Proper position, Putting 3 Nos Angle From of Size 35x35x6 mm, 3 Long Properly welding on 3 circle with pole than Grouting and Plinthing 300 mm Above level with cement concrete sand Sand and bricks ballast, ( All Material, Labourand T&P will be providedby the Contractor) 6 Erection, grouting & plinthing of Single Pole structure on STP along with fixing of necessary clamps and other accessories required as per RESPO norms. Painting of poles with primer and enamel paint as per RESPO specification complete in all respect. 7 Erection, grouting & plinthing of Single Pole structure on PCC along with fixing of necessary clamps and other accessories required as per RESPO norms. 8 Earthing of 11/0.4 KV Distribution Transformers body & neutral by way of boring and lowering of ISI marked two nos. G.I pipe 1.5 dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral / body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.) 9 Re-sagging of existing L/T, O/H , ABC Line opening of ABC on service point and opening of Consumer Service cable after Re-sagging of ABC Re Connection of Consumer Services cable on ST Pole / PCC. (All the material will be arranged by the contractor) 10 Restringing & Resagging of three phase 33 K.V.,11 K.V., Composite line on ACSR/Rabbit/Dogconductor as per RESSPO Norms. (All required accessories if necessary provided his own cost by contractor like disc insulator , disc fitting, pin insulator GI pin,X-arm , Top channel, T-off channel , binding wire Etc. ) 11 Grouting and nozzeling of Stay set complete of size 16X1800 mm. with cement, sand, brick-ballast 1:3:6 as per RESPO specification. (All the material will be arranged by the contractor) 12 Lopping and chopping of Tree branches coming in the way of H.T./L.T. lines at the interval of each 03 months.(12 months) (All the material will be arranged by the contractor) 13 Supply and fixing of Henley type tailess fuse unit on L.T. Distribution Pillar Box with required size of clamping of lug for L.T. P.V.C. Cable. (All the material will be arranged by the contractor) 14 Providing & fixing of Henley type tailles fuse unit 500 Amp. 650 Volt consisting of 6 nos Brass back entry, 6 nos. U-type spring contact made of copper, brass coupling with porcelain fitted on the GI sheet of 16 SWG with arrangement of 1 no. Neutral. (As per Drawing) 15 Providing & fixing of Henley type tailles fuse unit 300 Amp. 650 Volt consisting of 6 nos Brass back entry, 6 nos. U-type spring contact made of copper, brass coupling with porcelain fitted on the GI sheet of 16 SWG with arrangement of 1 no. Neutral. (As per Drawing) 16 Cleaning of 11/0.4 K.V. Sub-Stations with removal of garbage, dumps and its stacking out side the fencing area. 17 Cleaning of 33/11 K.V. Sub-Stations and yard with removal of garbage, dumps and its dumping side the fencing area at each 03 month at each Sub-Station. 18 Note :-1- All the material provided by contractor shall be as per norms of UPPCL/RESPO.2- One carriage including loading/unloading from dump site to pit site is included in scope of work.3- During execution of work all risk will be of the contractor.4- Contractor will provide all T & P, vehicle and man power.5- All the old and used material should be taken on book.6- The quantity may be vary ±10%.7- GST will be paid extra as legally applicable.8-The work will be done as per norms of UPPCL/RESPO.

BOQ

Name of Work: Different maintenance and repairing annual running work in the area of E.U.D.D-Rajajipuram, Central Zone, LESA, Lucknow
Sl. No. Item Description
1Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store.
2PCC Pole 8.5/9 Mtr. long.
3S.T.P. Pole 9/11 Mtr. long.
4Fabrication and erection of missing/damaged wire mesh fencing 02 Mtr. height with a gate and with retaining wall including grouting of fabricated M.S. Angle 65X65X6 mm. support (05 Nos. in a Sub-Station). Painting of fencing/support with all material as per specification/drawing complete in all respect.
5Repairing of damage/Rusted Steel Tubular Pole by digging of pil up to 2 for Proper position, Putting 3 Nos Angle From of Size 35x35x6 mm, 3 Long Properly welding on 3 circle with pole than Grouting and Plinthing 300 mm Above level with cement concrete sand Sand and bricks ballast, ( All Material, Labourand T&P will be providedby the Contractor)
6Erection, grouting & plinthing of Single Pole structure on STP along with fixing of necessary clamps and other accessories required as per RESPO norms. Painting of poles with primer and enamel paint as per RESPO specification complete in all respect.
7Erection, grouting & plinthing of Single Pole structure on PCC along with fixing of necessary clamps and other accessories required as per RESPO norms.
8Earthing of 11/0.4 KV Distribution Transformer\"s body & neutral by way of boring and lowering of ISI marked two nos. G.I pipe 1.5\" dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral / body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.)
9Re-sagging of existing L/T, O/H , ABC Line opening of ABC on service point and opening of Consumer Service cable after Re-sagging of ABC Re Connection of Consumer Services cable on ST Pole / PCC. (All the material will be arranged by the contractor)
10Restringing & Resagging of three phase 33 K.V.,11 K.V., Composite line on ACSR/Rabbit/Dogconductor as per RESSPO Norms. (All required accessories if necessary provided his own cost by contractor like disc insulator , disc fitting, pin insulator GI pin,X-arm , Top channel, T-off channel , binding wire Etc. )
11Grouting and nozzeling of Stay set complete of size 16X1800 mm. with cement, sand, brick-ballast 1:3:6 as per RESPO specification. (All the material will be arranged by the contractor)
12Lopping and chopping of Tree branches coming in the way of H.T./L.T. lines at the interval of each 03 months.(12 months) (All the material will be arranged by the contractor)
13Supply and fixing of Henley type tailess fuse unit on L.T. Distribution Pillar Box with required size of clamping of lug for L.T. P.V.C. Cable. (All the material will be arranged by the contractor)
14Providing & fixing of Henley type tailles fuse unit 500 Amp. 650 Volt consisting of 6 nos Brass back entry, 6 nos. U-type spring contact made of copper, brass coupling with porcelain fitted on the GI sheet of 16 SWG with arrangement of 1 no. Neutral. (As per Drawing)
15Providing & fixing of Henley type tailles fuse unit 300 Amp. 650 Volt consisting of 6 nos Brass back entry, 6 nos. U-type spring contact made of copper, brass coupling with porcelain fitted on the GI sheet of 16 SWG with arrangement of 1 no. Neutral. (As per Drawing)
16Cleaning of 11/0.4 K.V. Sub-Stations with removal of garbage, dumps and its stacking out side the fencing area.
17Cleaning of 33/11 K.V. Sub-Stations and yard with removal of garbage, dumps and its dumping side the fencing area at each 03 month at each Sub-Station.
18Note :-1- All the material provided by contractor shall be as per norms of UPPCL/RESPO.2- One carriage including loading/unloading from dump site to pit site is included in scope of work.3- During execution of work all risk will be of the contractor.4- Contractor will provide all T & P, vehicle and man power.5- All the old and used material should be taken on book.6- The quantity may be vary ±10%.7- GST will be paid extra as legally applicable.8-The work will be done as per norms of UPPCL/RESPO.

AI Tender Summary

OUR REF NO 46391207
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 6 Lakhs
LAST DATE 02-12-2024
Authority
Authority Name Madhyanchal Vidut Vitran Nigam Limited
Work Description tender for Different maintenance and repairing annual running work in the area of E.U.D.D-Rajajipuram, Central Zone, LESA, Lucknow Sl. No. Item Description 1 Safe carriage, loading and unloading of following material from ESC Daliganj, Lucknow to work site/J.E. dump store. 2 PCC Pole 8.5/9 Mtr. long. 3 S.T.P. Pole 9/11 Mtr. long. 4 Fabrication and erection of missing/damaged wire mesh fencing 02 Mtr. height with a gate and with retaining wall including grouting of fabricated M.S. Angle 65X65X6 mm. support (05 Nos. in a Sub-Station). Painting of fencing/support with all material as per specification/drawing complete in all respect. 5 Repairing of damage/Rusted Steel Tubular Pole by digging of pil up to 2 for Proper position, Putting 3 Nos Angle From of Size 35x35x6 mm, 3 Long Properly welding on 3 circle with pole than Grouting and Plinthing 300 mm Above level with cement concrete sand Sand and bricks ballast, ( All Material, Labourand T&P will be providedby the Contractor) 6 Erection, grouting & plinthing of Single Pole structure on STP along with fixing of necessary clamps and other accessories required as per RESPO norms. Painting of poles with primer and enamel paint as per RESPO specification complete in all respect. 7 Erection, grouting & plinthing of Single Pole structure on PCC along with fixing of necessary clamps and other accessories required as per RESPO norms. 8 Earthing of 11/0.4 KV Distribution Transformers body & neutral by way of boring and lowering of ISI marked two nos. G.I pipe 1.5 dia 20 m deep from the ground level with solid cone at the lower end of G.I pipe. One end of G.I strip of size 50X6 mm. will be connected with neutral / body of the Transformer & other end will be clamped & welded with G.I Pipe as per UPPCL norms (All the material will be arranged by contractor at their own cost.) 9 Re-sagging of existing L/T, O/H , ABC Line opening of ABC on service point and opening of Consumer Service cable after Re-sagging of ABC Re Connection of Consumer Services cable on ST Pole / PCC. (All the material will be arranged by the contractor) 10 Restringing & Resagging of three phase 33 K.V.,11 K.V., Composite line on ACSR/Rabbit/Dogconductor as per RESSPO Norms. (All required accessories if necessary provided his own cost by contractor like disc insulator , disc fitting, pin insulator GI pin,X-arm , Top channel, T-off channel , binding wire Etc. ) 11 Grouting and nozzeling of Stay set complete of size 16X1800 mm. with cement, sand, brick-ballast 1:3:6 as per RESPO specification. (All the material will be arranged by the contractor) 12 Lopping and chopping of Tree branches coming in the way of H.T./L.T. lines at the interval of each 03 months.(12 months) (All the material will be arranged by the contractor) 13 Supply and fixing of Henley type tailess fuse unit on L.T. Distribution Pillar Box with required size of clamping of lug for L.T. P.V.C. Cable. (All the material will be arranged by the contractor) 14 Providing & fixing of Henley type tailles fuse unit 500 Amp. 650 Volt consisting of 6 nos Brass back entry, 6 nos. U-type spring contact made of copper, brass coupling with porcelain fitted on the GI sheet of 16 SWG with arrangement of 1 no. Neutral. (As per Drawing) 15 Providing & fixing of Henley type tailles fuse unit 300 Amp. 650 Volt consisting of 6 nos Brass back entry, 6 nos. U-type spring contact made of copper, brass coupling with porcelain fitted on the GI sheet of 16 SWG with arrangement of 1 no. Neutral. (As per Drawing) 16 Cleaning of 11/0.4 K.V. Sub-Stations with removal of garbage, dumps and its stacking out side the fencing area. 17 Cleaning of 33/11 K.V. Sub-Stations and yard with removal of garbage, dumps and its dumping side the fencing area at each 03 month at each Sub-Station. 18 Note :-1- All the material provided by contractor shall be as per norms of UPPCL/RESPO.2- One carriage including loading/unloading from dump site to pit site is included in scope of work.3- During execution of work all risk will be of the contractor.4- Contractor will provide all T & P, vehicle and man power.5- All the old and used material should be taken on book.6- The quantity may be vary ±10%.7- GST will be paid extra as legally applicable.8-The work will be done as per norms of UPPCL/RESPO.
Basic Detail
Tender No 25/E.U.D.C.-Talkatora/2024-25
Bidding Type Tender
Location
City rajajipuram
State Uttar Pradesh
Key Dates
Publish Date 26 Nov 2024
Submission Date 02 Dec 2024
Open Date 03 Dec 2024
Finance
Tender Value 6 Lakhs
Tender Fee 1180
EMD 6000
Exemption Not Available
Document List
dc78248d-c045-4195-aa85-d05fa1a23788.html
BOQ_1717361.xls
formAfinal.pdf
TenderDoc25.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Nov 26, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Dec 02, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Dec 03, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

dc78248d-c045-4195-aa85-d05fa1a23788.html

xls

BOQ_1717361.xls

pdf

formAfinal.pdf

pdf

TenderDoc25.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders