|
| 1 | Earth work in excavation bymanual means for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand : 10 graded stone aggregate 20mm nominal size) |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand :6 graded stone aggregate 20mm nominal size) |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating eachdeposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. |
| 5 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor five level excluding the cost of centring, shuttering and finishing with. 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars |
| 7 | Painting of pillars (with superior exterior paint)including cost of labour charges including painting of Forest Department LOGO and the front face of the pillar with stencil. For mainline BPs, Red Shade: Adventure 2189 (Nerolac) and for chak BPs Yellow shade:Bumble Bee 2014.(Nerolac) Exterior Emulsion paint is recommended incl carriage complete job. |
| 8 | Centering and shuttering including strutting propping etc and removal of form work forcolumns, piers,abutments, pillars, posts and struts |
| 9 | Carriage of Bajri from source to site of work by M.T./H.L average |
| 10 | Carriage of Sand from source to site of work by M.T./H.L average |