| 1 | 1.Construction of Single Class room building at PUE School in Thalai NagarH/O Thaluthalai PT..Earth work excavation and deposting on bank with intial lead and lift in stiff clay black cotton soils and ordinary gravely soil etc complete |
| 2 | Collection and supply of M.sandand filling in to the basement including cost and conveyanceto the siteand all labour charges for filling as per standard speecifications |
| 3 | Foundation concrete in C.C.1:4:8 mix using 40mm ISS HBG Metal including cost and conveyance of all materialsto site andall labours etc., complete |
| 4 | Supplying and fabrication of steel including cost and conveyance of bending to shape and tying in position and forming grills for all R.C.C works including cost and conveyance of all materials to site andall labours etc., complete |
| 5 | RCC in C.C.1:11/2:3 mix using 20mm ISS HBG Metal including cost and conveyance of all materialsto site andall labours etc., complete |
| 6 | Brick work in cement mortar 1:5 mix using country bricks 83/4\"x43/8\"x23/4\" and conveyance of all materials to site and all labour charges etc complete |
| 7 | Towards centering charges inclusive of all materials and labour charges etc., complete as per standared specification Column |
| 8 | Towards centering charges inclusive of all materials and labour charges etc., complete as per standared specification Blowe Sill |
| 9 | Towards centering charges inclusive of all materials and labour charges etc., complete as per standared specification above Sill |
| 10 | Platering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc., complete |
| 11 | Platering with cement mortar 1:3 mix to 10mm thick including cost and conveyance of all materials to site and all labour charges etc., complete |
| 12 | Platering with cement mortar 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc., complete |
| 13 | Paving the Floor with approved qulity fine Polished SHAHABAD Stone Slabs of size 600x600x18/20mm with matchingincluding cost and conveyance of all materials to site and all labour charges etc complete… |
| 14 | Brick jelly lime concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost andconveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete |
| 15 | Finishing the top of roof with one course of PRESSED TILES of size 20 cm X 20 cm X 2 cmlaid in cement mortar 1:3 (One cement and three Sand) 12mm thick mixed with water proofing compound conforming to I.S. at 2% by weight. |
| 16 | Distempering two coats using OLD or NEW Plastered surface using Oil Bound Distemperincluding cost and all Labour charges etc., complete |
| 17 | Painting two coats over OLD or NEW Plastered surface using Approved Quality of Exterior EmulsionPaintincluding cost and all Labour charges |
| 18 | Painting two coats forNEW IRON Worksusing ready mixed Enamel Paint over Red Oxide including cost and all Labour charges etc., complete |
| 19 | Towards Cost for Bala Painting including cost and all Labour charges etc., complete… |
| 20 | Towards cost and supply of following ElectrificationLight point SD 25 |
| 21 | Five pin point SD 25 |
| 22 | Fun point SD 25 |
| 23 | Ceiling fan SD 106 |
| 24 | Tube light SD 88 |
| 25 | Top light |
| 26 | Earth connection |
| 27 | meter board |
| 28 | EB Deposit |
| 29 | Towards cost and supply of following items.,Door1.20 x 2.10 m |
| 30 | steel window 1.20X1.30 |
| 31 | steel window 1.20X1.50 |
| 32 | SS Hand rail |
| 33 | Towards cost and supply of following items.,110 mm PVC pipe |
| 34 | 110 mm PVC door elbow |
| 35 | 110 mm PVC Tee |
| 36 | Provision for Name Board |
| 37 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package} |