| 1 | Dismentling old c.c. Tilesall complete |
| 2 | Dismentling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in charge within a distance of 60 meter. SI no 694 |
| 3 | Dispolsal of malwa from out site up to 5 km. Distance all complete |
| 4 | cement concrete with 4 cm. Gauge approved stone ballast coarse sand and cement in proportion of 1:4:8 including supply of all materials,labour and T & P etc.required for proper completion of work . S.I. No. 281 |
| 5 | R.C.C. Work with cement ,approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in slab excluding supply of reinforcement and its bending , but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials , labour, Tools & plants etc. required for proper completion of the work binding wire of supplied by the contractor free of cost inculiding making of drip coarse.S.I.No. 283 |
| 6 | M-150 Brick Work in 1:4 (one cement & Four coarse sand of 1.25F.M. Mortar) in Foundation & Plinth including supply of all materials , labour & T& P etc. Required for proper completion of work .SI no 307(a) |
| 7 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / tractor mounted appropriate equipment on prepared surface , mixing by mix in place method with rotavator at OMC, and compacting with smooth MORD specifications 401. |
| 8 | cement concrete with 2cm gauge approved stone grit , coarse sand & cementin the proportion of 1:1.5:3 in cc pavement (thickness as per design ) cement coarce &fine aggregate confirming to IS standard mixed in concrete mixture / plant of not less then 0.2 cum capacity & appropriate weight batcher using approved mix design , laid in approved fixed form work (steel channel) laying and fixing of 125 micron thick polythene film wedges , steel plates including leveling the form work spreading the concrete with shovels , rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including hassion cloth for curring of concrete pavements for not less then 14 days curring compound (where as specified ) and water finishing to lines & grade including supply of all material , labour, tools& plants etc. requiredfor proper completion of the work and also including complete shifting of recron 3S fibre reinforcement material etc & concrete etc. NEW ITEM 3( p.no 49) |
| 9 | R.C.C. Work with cement ,approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in slab excluding supply of reinforcement and its bending , but including its fixing and binding the same with 24 B.W.G.G.I.binding wire and including necessary centering and shuttering etc. and supply of all materials , labour, Tools & plants etc. required for proper completion of the work binding wire of supplied by the contractor free of cost .but for slab.S.I.No.284 |
| 10 | M.S.or ironin Plain work such as R.C.C. Or R.B. Work wrought torequired shape as necessaryincluding bending for proper completion of the work and including supply of all steelandits wastage , bend , hooks , and authorised overlapping shall be measured and including cost of binding wire.S.I.No.504 |
| 11 | Cleaning silt drain malwa with disposal andshifting,duraboard use in c.c. Road etc all complete work |
| 12 | S & F Site board with writting latter all complete work . |
| 13 | M.S work in heavy size for jall , channel, etc all complete work |
| 14 | ADD GST |