| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directedin all kinds of soils. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All works upto plinth level in 1:5:10 (1 cement : 5 Fine Sand :10 Graded Crushed Stone Agg. . 40 mm nominal size) |
| 3 | Provinding and laying in position, specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing and reiforcement. All work up to plinth. 1:2:4 (1 cement:2 coarse sand :4 graded stone agg. 20 mm nominal ) |
| 4 | Providing and laying cement concrete in retaining walls, return walls , walls, (any thickness) including attached pilasters, columns, piers, abutments pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks plain window sills, fillets etc upto floor level, excluding the cost of Centering , Shuttering & finishing in 1:2:4 ( 1 cement : 2 Coarse Sand :46 Graded Crushed Stone Agg. . 20 mm nominal size) Crushed with 20% boulder. |
| 5 | Dry stone boulder |
| 6 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, filling and reinforcement. All Works Upto Plinth Level in 1:1.5:3 ( 1 cement : 1.5 Coarse Sand : 3 Graded stone Agg. 20 mm nominal size) Crushed |
| 7 | Reinforcement for RCC work including straightening , cutting, bending, placing in position and blinding all complete. |
| 8 | provinding and laying in position cement concrete 1:3:6 miX in foundation and plinth using 20mmstone aggregate. |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for: slab edges |
| 11 | Dry R.R stone masonry with hard stone in foundation and plinth using nallah stone without bond stone |
| 12 | Carriage of Cement |
| 13 | Carriage of Sand |
| 14 | Carriage of Aggregates |
| 15 | Carriage of Stones |
| 16 | CIB( citizen information board) size 2\"6\"\"x3\"6\"\"x0\"9\"\"( complete job) |