| 1 | Earth work excavation soil and depositing on bank with initial lead of 10m and lift of 2m in Hard gravelly soil, stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., completeincluding cost of all materials lead lift etc complete as directed by the department engineer at site. |
| 2 | Providing and laying Sand filling for foundation including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. |
| 3 | Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site . |
| 4 | Providing and laying R:C:C1:1.5:3 using 12 to 20mm HBG metal including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work |
| 5 | Providing and laying R.C.C. 1:1.5:3 using 12- 20mm metal for foundation with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and \"B.G.10\" guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. |
| 6 | Providing and laying P:C:C 1:2:4 using12-20mm HBG metalwithout form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site |
| 7 | Providing and laying P.C.C 1:2:4 using 12-20mm HBG stone withform workusing steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and \"B.G.10\" guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. |
| 8 | Plastering in CM 1:312 mm thickincluding cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site . |
| 9 | Providing steel reinforcement for all RCC works including cost of all materilas steel, binding wire, labour, lead, lift,cutting, bending, typing and binding and placing in positionetc., complete as directed by the department engineer at site. |
| 10 | Supplying and filling with well gravel including cost of gravel transport charges, spreading and consolidation of each 300 mm with power roller, leads, lift, labour etc., complete as directed by the department engineer at site. |
| 11 | supplying and filling for foundation and basement with quary dust including cost of labour, transport, consolidation, lead and lift etc., complete as per standerd specification and as directed by the department at site. |
| 12 | Supplying and filling 12-20mm metalincluding cost of all materials, labour, lead and lift etc., completeas directed by the department at site. |
| 13 | Supplying, fabrication of MS angle including cost of angle, flats as per drawing and specification and galvanising, placing in position including cost of all materials, galvanizing charges, transportation, labour, lead etc., complete as directed by the department engineer at site. |
| 14 | Colour washing two coats using shell lime over one coat of white washing including cost of all materials, labour, lead lift etc., complete as per standard specification and as directed by the department engineer at site. |
| 15 | Labourcharges for assembling of template in correct position and alligenment for various equipment plinth and grouting the foundation bolt including cost of all material transport , labour,lead, lift etc, complete as directed by the dept. Engineer at site. (The templete will be make own arrangement by the contractor) |
| 16 | Supplying and fixing GI bolt and nuts with minimum 100mm long bend and thread 2 nos of GI nuts and washer including all materials, labour,lead,lift etc., completeas directed by the department engineer at site. 20mm dia |
| 17 | Supplying and fixing GI bolt and nuts with minimum 100mm long bend and thread 2 nos of GI nuts and washer including all materials, labour,lead,lift etc., completeas directed by the department engineer at site. 25mm dia |
| 18 | Providing grout holes at required position including cost of all materials, curing,labour, lead and lift etc., completeas directed by the department engineer at site. |
| 19 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 40mm dia |
| 20 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 32mm dia |
| 21 | Supplying, laying of PVC pipe with required PVC bend L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department at site. 25mm dia |
| 22 | Supplying & fixing gunmetal gate value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 32mm dia |
| 23 | Supplying & fixing gunmetal gate value including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 25mm dia |
| 24 | Labour charges for Refilling with excavated earth other than sand including cost of labour, lead and lift etc., complete as directed by the department engineer at site. |
| 25 | Dismantling of existing RCC transfomer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site. |
| 26 | Dismantling of existing PCC including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site. |
| 27 | Dismantling of the existing brick work transformer gantry including cost of all materials, lead, lift, labour charges, etc., complete as per standard specification and as directed by the department engineer at site. |
| 28 | GST for bidders within TamilNadu |
| 29 | SGST |
| 30 | CGST |
| 31 | GST for bidders outside TamilNadu (IGST) |