| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-12-2025 | Date_extension19 | Date | 07-01-2026 |
| 2 | 27-11-2025 | Date_extension18 | Date | 18-12-2025 |
| 3 | 06-11-2025 | Date_extension17 | Date | 25-11-2025 |
| 4 | 15-10-2025 | Date_exten | Date | 04-11-2025 |
| 5 | 25-09-2025 | Date_extns | Date | 15-10-2025 |
| 6 | 02-09-2025 | Date_extn | Date | 24-09-2025 |
| 7 | 13-08-2025 | Date corrigendum13 | Date | 01-09-2025 |
| 8 | 22-07-2025 | date corrigendum 11 | Date | 12-08-2025 |
| 9 | 03-07-2025 | Tender extension corrigendum 10 | Date | 21-07-2025 |
| 10 | 10-06-2025 | Tender extension corrigendum 09 | Date | 02-07-2025 |
| 11 | 20-05-2025 | Corrigendum for date extension | Date | 09-06-2025 |
| 12 | 29-04-2025 | Extension corrigendum | Date | 19-05-2025 |
| 13 | 09-04-2025 | Date extension corrigendum | Date | 28-04-2025 |
| 14 | 20-03-2025 | Date_extension | Date | 08-04-2025 |
| 15 | 22-02-2025 | date | Date | 19-03-2025 |
| 16 | 29-01-2025 | Tender extension corrigendum | Date | 20-02-2025 |
| 17 | 08-01-2025 | Technical corrigendum | Technical Bid | 28-01-2025 |
| 18 | 07-01-2025 | datecorrigendum | Date | 28-01-2025 |
| 19 | 17-12-2024 | DateExtension | Date | 06-01-2025 |
| 20 | 18-11-2024 | Date corrigendum | Date | 16-12-2024 |
| Sl. No. | Item Description |
| 1 | Part 1 - Cost of Materials |
| 2 | 100.98.116:Supply of DI K9 Pipe Conforming to IS 8329/2000, 150mm Dia. |
| 3 | 100.98.117:Supply of DI K9 Pipe Conforming to IS 8329/2000, 200mm Dia. |
| 4 | 100.98.118:Supply of DI K9 Pipe Conforming to IS 8329/2000, 250mm Dia. |
| 5 | 100.98.460:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 150mm. |
| 6 | 100.98.461:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 200mm. |
| 7 | 100.98.462:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 250mm. |
| 8 | 100.98.441:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 40mm. |
| 9 | 100.98.446:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Double Orifice Type DS2, Size 50mm. |
| 10 | 100.98.450:Supply of CI Air Valve with Flanges, Conforming to IS 14845 - 2000, Kinetic Air Valve Type DS1, Size 80mm. |
| 11 | Part II-Working Charges-Laying of DI pipes for pumping main |
| 12 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. |
| 13 | 100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock. |
| 14 | 100.2.2:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10m2 on plan), including dressing of sides and ramming of bottoms, lift up to 1.5m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50m, in Medium Rock where Blasting is Prohibited. |
| 15 | 100.1.10:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth exceeding 1.5m but not exceeding 3m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock Requiring Blasting. |
| 16 | 100.59.1:Cutting the bituminous / concrete roads with cutting machine for a minimum depth of 200mm along the sides of proposed alignment of the pipe to be laid without causing any damage to other utilities, including the charges for hire and conveyance of tools and plant, cost of consumables and charges for lighting, watching, ribbon fencing, caution boards, traffic diversion, and as per the direction of departmental officers etc. complete, before carrying out the demolition of bituminous / concrete road by mechanical means and carrying out the excavation. |
| 17 | OD270134/2022-2023:Dismantling manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer -in-Charge:<br>Bituminous road |
| 18 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) |
| 19 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. |
| 20 | 100.41.40:Supply, stacking, spreading and consolidating of Red earth in the trench of pipe line for cushion including carriage, loading, unloading & stacking up to any lead. |
| 21 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 22 | 100.14.2:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 150mm diameter Ductile Iron Class K-9 Pipes. |
| 23 | 100.14.3:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 200mm diameter Ductile Iron Class K-9 Pipes. |
| 24 | 100.14.4:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 250mm diameter Ductile Iron Class K-9 Pipes. |
| 25 | OD271987/2022-2023:Labour for cutting D.I. pipe with steel saw.150 mm diameter D.I. pipe |
| 26 | OD271988/2022-2023:Labour for cutting D.I. pipe with steel saw.200 mm diameter D.I. pipe |
| 27 | OD271986/2022-2023:Labour for cutting D.I. pipe with steel saw.250 mm diameter D.I. pipe |
| 28 | 18.30.4:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:150 mm diameter pipe |
| 29 | 18.30.5:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:200 mm diameter pipe |
| 30 | 18.30.6:Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:250 mm diameter pipe |
| 31 | 18.70.2:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:150 mm dia pipes |
| 32 | 18.70.3:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:200 mm dia pipes |
| 33 | 18.70.4:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:250 mm dia pipes |
| 34 | 100.35.2: Testing 150mm DI/CI pipeline with potable water to the required test pressure150 mm diaObserved Data derived from item no.1018 of PHED DATA |
| 35 | 100.35.3:Testing 200mm DI/CI pipeline with potable water to the required test pressure200 mm diaObserved Data derived from item no.1020 of PHED DATA |
| 36 | 100.35.4:Testing 250mm DI/CI pipeline with potable water to the required test pressure .250 mm diaObserved Data derived from item no.1022 of PHED DATA |
| 37 | 18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia |
| 38 | 18.69.1:Providing and laying D.I Specials of Class K - 12 suitable for mechanical jointing as per IS : 9523 :Upto 600 mm dia |
| 39 | 100.37.6.1:In situ fabrication of M.S. pipes of size 150mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete. |
| 40 | 100.37.6.2:Fabricating M.S. flanges of diameter 150mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 41 | 100.37.6.3:Cutting 150mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 42 | 100.37.6.4:Welding 150mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 43 | 100.37.6.5:Grinding cut and weld edges of 150mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 44 | 100.37.7.1:In situ fabrication of M.S. pipes of size 200mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete. |
| 45 | 100.37.7.2:Fabricating M.S. flanges of diameter 200mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 46 | 100.37.7.3:Cutting 200mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 47 | 100.37.7.4:Welding 200mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 48 | 100.37.7.5:Grinding cut and weld edges of 200mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 49 | 100.37.8.1:In situ fabrication of M.S. pipes of size 250mm (I.D.) using 8mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete. |
| 50 | 100.37.8.2:Fabricating M.S. flanges of diameter 250mm using 12mm thick M.S. plate including cost and conveyance charges of M.S. plate, all fabrication charges, charges of painting the steel work with two or more coat deluxe multi surface paint to give an even shade over an under-coat of primer etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 51 | 100.37.8.3:Cutting 250mm (I.D.) M.S. pipes for making bends and other specials by gas cutting including cost of gas, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 52 | 100.37.8.4:Welding 250mm (I.D.) M.S. pipes for making bends and other specials by gas/electric welding machine including cost of gas and welding rods, all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 53 | 100.37.8.5:Grinding cut and weld edges of 250mm (I.D.) M.S. pipes during fabrication work including all labour and hire charges of tools etc., complete: For pipes fabricated with 8mm thick M.S. plates. |
| 54 | 100.31.1.4:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 150mm diameter, Class I. |
| 55 | 100.31.1.5:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 200mm diameter, Class I. |
| 56 | 100.31.1.6:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 250mm diameter, Class I. |
| 57 | 100.32.2:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 40mm Single Acting Air Valve. |
| 58 | 18.17.3:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :40 mm nominal bore |
| 59 | 100.32.3:Conveying and fixing C. I. Double Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 50mm Double Acting Air Valve. |
| 60 | 18.17.4:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :50 mm nominal bore |
| 61 | 100.32.4:Conveying and fixing C. I. Double Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 80mm Double Acting Air Valve. |
| 62 | 18.17.6:Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :80 mm nominal bore |
| 63 | Part III - Construction of Valve Chamber & Anchor Blocks |
| 64 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 65 | OD272153/2022-2023:Earthwork excavation by mechanical means ( Hydrolic excavator)/manual means in foundation trenches or drains not exceeding 1.5 m in widthor 10 sqm in plan including dressing of sides and rammoing of bottom,lift 1.5 m up to 3m. including getting out the excavated soil and disposal of surplus excavated soil as directed with in a lead of 50 mOrdinary Rock |
| 66 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) |
| 67 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 68 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 69 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 70 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 71 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 72 | Part IV-Road Restoration (MoRTH) |
| 73 | 3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305. |
| 74 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. |
| 75 | 4.1.A.3:Granular Sub-Base with Close Graded Material (Table:- 400-1) :- Plant Mix Method - Grading - III Material Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 76 | 4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 77 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 78 | 12.8.B.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical SpecificationsPCC Grade M20 |
| 79 | 5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means. |
| 80 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 81 | 5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom. |
| 82 | 5.7.1:Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.09 mm (Type-A) aggregates using viscosity grade bitumen ( VG - 30) to the required line, grade, and level to serve as wearing course on a previously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 75 tonnes/hour., laying and rolling with a Smooth wheeled roller 8-10 tonne capacity, and finishing to the required level and grade. |
| 83 | 5.8.a:Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder (VG 30) laid on the prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. Grading I - 19 mm nominal chipping size |
| 84 | 5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size) |
| 85 | 5.6.1.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.2 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - I ( 19 mm nominal size ) |
| 86 | OD272574/2022-2023:Taking out existing CC interlocking paver blocks from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 87 | OD272575/2022-2023:Laying old cement concrete interlocking paver blocks of any design/ shape laid in required line, level, curvature, colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (Old CC paver blocks shall be supplied by the department free of cost.) |
| 88 | Part V - Road Restoration - LSGD (MORD Road) |
| 89 | 3.5.3:Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m <br> Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 |
| 90 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1)(A) By Mix in Place MethodConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(i) For Grading I Material |
| 91 | 4.9:Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.By Mechanical Means with 1 km lead |
| 92 | 5.1.1a:Prime Coat :- Low porosityProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 93 | 5.2.3a:Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 94 | 5.9.1.2a:20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder - Bitumen S-65Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508.Case - I By Manual Means(II) Bitumen (S-65) |
| 95 | 5.12.A.3.2a:Seal Coat - Manual Means - Type C - Bitumen S-65Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510A. By Manual Means :- Case - III : Type C(II) Bitumen (S-65) |
| 96 | 11.4.3.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III. P.C.C. grade M 20 (i) Nominal mix (1:2:4) |
| 97 | Part VI - Construction of 2.9 LL Sump cum Pump House at Pushpakandam |
| 98 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 99 | OD93596/2022-2023:DOWEL BARS - Supplying and Providing MS dowel bars of size 16mm dia of 2.0m long (1m inrock and 1m in concrete) including drilling holes of 30mm dia and filling the gap with cement grout(0.50kg/each) etc |
| 100 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 101 | 2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting) |
| 102 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 103 | 5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to siteof laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level |
| 104 | 5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to siteof laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level |
| 105 | 5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum). |
| 106 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 107 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 108 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 109 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 110 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For vertical surface two coats @0.70 kg per sqm |
| 111 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For horizontal surface one coat @1.10 kg per sqm. |
| 112 | 50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete. |
| 113 | 13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) |
| 114 | 10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover |
| 115 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc |
| 116 | 21.1.1.2:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately):For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron) |
| 117 | 21.1.2.2:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron) |
| 118 | 21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness |
| 119 | 21.15.1:Providing and fixing aluminium casement windows fastener of required length for aluminium windows with necessary necessary screws etc.complete.Anodized (AC 15 ) aluminium |
| 120 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 121 | 13.71:Lettering with black Japan pint of approved brand and manufacture |
| 122 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 123 | 100.41.34:Supplying and fixing Rectangular C.I. manhole cover 455mm x 610mm with frame (low duty) charges including all cost, labour charges etc., complete. |
| 124 | 50.18.9.18.2:Providing and fixing PVC pipes including fixing the pipe with clamps/Clips at 1.00 m spacing. This included jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 75 mm dia 4 Kfg/cm2 - External work - Exposed on wall |
| 125 | 50.18.9.21.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Bend |
| 126 | 50.18.9.21.7:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Vent cowl |
| 127 | OD153059/2022-2023:Supplying and providing water level indicator to the tank using scale fabricated out of 2mm<br>thick MS plate with in the frame work of suitable size MS square tube, 160mm PVC pipe for guiding the float,<br>necessary pullies, suitable nylon thread for connecting float and level indicator, painting the entire structure, lettering<br>etc complete including all charges for material and labour for GL tank |
| 128 | 100.36.1:Filling water with 5000 litre tankers fited in lorry and conveying water from a distance of 5 km (average) to the reservoir site and pumping the water into the reservoir of height not less than 3 m using 5 HP diesel engine pump set , hire for tanker lorry, tools and other appliences and cost of water etc. complete. |
| 129 | Part VII - Construction of 3LL Sump cum Pumphouse at Bedumettu |
| 130 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared |
| 131 | OD93988/2022-2023:DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m inrock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc |
| 132 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil |
| 133 | 2.7.2:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting) |
| 134 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 135 | 5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to siteof laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level |
| 136 | 5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to siteof laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level |
| 137 | 5.34.1:Extra for providing richer mixes at all floor levels. Note:- Excess/less cement over the specified cement content used is payable/ recoverable separately.Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum). |
| 138 | 50.6.1.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete. |
| 139 | 10.6.1:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.25 mm M.S. laths with 1.25 mm thick top cover |
| 140 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc |
| 141 | 21.1.1.2:Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/ appropriate Z sections and other sections of approved make conforming to IS : 733 and IS: 1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminnium snap beading for glazing /paneling, C.P. brass/ stainless steel screws, all complete as per architectural drawings and the directions of Engineer-in-charge.(Glazing, paneling and dash fasteners to be paid for separately):For fixed portionPowder coated aluminium (minimum thickness of powder coating 50 micron) |
| 142 | 21.1.2.2:For shutters of doors, windows & ventilators including providing and fixing hinges / pivots and making provision for fixing of fittings wherever required including the cost of EPDM rubber/ neoprene gasket required (Fittings shall be paid for separately)Powder coated aluminium (minimum thickness of powder coating 50 micron) |
| 143 | 21.3.1:Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasket etc. complete as per the architectural drawings and the directions of Engineer - in -Charge. ( Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness |
| 144 | 21.15.1:Providing and fixing aluminium casement windows fastener of required length for aluminium windows with necessary necessary screws etc.complete.Anodized (AC 15 ) aluminium |
| 145 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 146 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 147 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform |
| 148 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 149 | 13.7.1:12 mm cement plaster finished with a floating coat of neat cement of mix:1:3 ( 1 cement : 3 fine sand) |
| 150 | 13.47.1:Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm) |
| 151 | 22.23.1:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For vertical surface two coats @0.70 kg per sqm |
| 152 | 22.23.2:Providing and applying integral crystalline slurry of hydrophilic in nature forwaterproofing treatment to the RCC structures like retaining walls of the basement,water tanks, roof slabs, podiums, reservior, sewage & water treatment plant, tunnels/ subway and bridge deck etc., prepared by mixing in the ratio of 5 : 2 (5 partsintegral crystalline slurry : 2 parts water) for vertical surfaces and 3 : 1 (3 partsintegral crystalline slurry : 1 part water) for horizontal surfaces and applying thesame from negative (internal) side with the help of synthetic fiber brush. The materialshall meet the requirements as specified in ACI-212-3R-2010 i.e by reducingpermeability of concrete by more than 90% compared with control concrete as perDIN 1048 and resistant to 16 bar hydrostatic pressure on negative side. The crystallineslurry shall be capable of self-healing of cracks up to a width of 0.50mm. The workshall be carried out all complete as per specification and the direction of the engineerin-charge. The product performance shall carry guarantee for 10 years against anyleakage.For horizontal surface one coat @1.10 kg per sqm. |
| 153 | 13.71:Lettering with black Japan pint of approved brand and manufacture |
| 154 | 10.25.2:Item Shifted to Sub head 14 as item 14.73Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works |
| 155 | 100.41.34:Supplying and fixing Rectangular C.I. manhole cover 455mm x 610mm with frame (low duty) charges including all cost, labour charges etc., complete. |
| 156 | 50.18.9.18.2:Providing and fixing PVC pipes including fixing the pipe with clamps/Clips at 1.00 m spacing. This included jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge 75 mm dia 4 Kfg/cm2 - External work - Exposed on wall |
| 157 | 50.18.9.21.4:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Bend |
| 158 | 50.18.9.21.7:Providing and fixing PVC moulded fittings/ accessories for Rigid PVC pipes, including jointing with PVC solvent cement - 75 mm dia Vent cowl |
| 159 | 10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes |
| 160 | OD153140/2022-2023:Supplying and providing water level indicator to the tank using scale fabricated out of 2mm thick MS plate within the framework of suitable size MS square tube, 160mm PVC pipe for guiding the float, necessary pullies, suitable Nylon thread for connecting float and level indicator, painting the entire structure, lettering etc. complete including all charges for material and labour for GL Tank. |
| 161 | 100.36.1:Filling water with 5000 litre tankers fited in lorry and conveying water from a distance of 5 km (average) to the reservoir site and pumping the water into the reservoir of height not less than 3 m using 5 HP diesel engine pump set , hire for tanker lorry, tools and other appliences and cost of water etc. complete. |
| 162 | Part VIII - Construction of Steel Tank at Kailasapara, Shoolapara |
| 163 | 2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil |
| 164 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 165 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size |
| 166 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 167 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 168 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. |
| 169 | OD93970/2022-2023:Supply of Sand including loading, unloading, transportation and other incidental charges as perthe direction of departmental officers.1 |
| 170 | OD93893/2022-2023:Supply, installation and commissioning of a pre-engineered, prefabricated, factorymanufactured steel storage Water Tank having a capacity of 150000 L(1Nos.) thickness of 0.6mm, in multiple layers as required for the capacity and height of the tank and multiple-layeredPE sheet/membrane for the inner containment liner. The Tank Shell / Body &amp; theLinermaterial shall be manufactured in a facility certified and compliant to ISO 9001 - 2000standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drainsand fittings, overflow and drain, high and low water level indicators. All connections to thetanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF:The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, withheavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 personsfor maintenance and cleaning and tank shall have an access hatch with cover, on the roof, foroperation and Maintenance TANK COVER :Tank covers shall be of approved galvanizedvermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or othermaterial, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the topedge of the tank with galvanized bolts and nuts. LADDERS :Tanks shall be provided withHotdipGalvanized ladders internally or externally. External roof supports shall be of anappropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevantspill level, air gap and overflow requirements relative to Effective Capacity. All nuts and boltsused for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened.The tank shall have a circular angle fixed around the total circumference of the tanks, at the top,of minimum 2 mm thickness. Tanks shall be properly flushed out with clean water prior to beingbrought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 5.826 m in diameter and 5.7 m in height DESIGN LIFE: The tanks shall have a design life of 50 years.TANK CONNECTIONS: Standard design valve outlet connection : i) 150mm CI Flanged valveii) Overflow connection including an Internal approved bell-mouth shaped bends to maximizethe overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of thetank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall bepurpose designedand manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 andANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall befurnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured toonepiececonstruction, fabricated from multi-layer PE sheet, certified for potable drinking water, to(ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer constructionfor strength, reinforced with woven scrim industrial fabric to prevent elongation and enhancetensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensilestrength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulatingtape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposedmaterial at the edges of the liner joints to further prevent the ingress of water into the scrim. vii)Liners shall be positively and continuously attached to the top outer edge of the circumferenceof the tank to prevent entry of water from the runoff from the roof structure. viii) All liners ontanks over 2m in height shall have a continuous intermediate liner support designed out of nylon(or other material)cord, around the circumference of the tank, at vertical intervals correspondingto the level of each ring. ix) The intermediate liner support cords shall be firmly secured to thesteel shell at each level, to prevent stress on the liner welded joints, and thereby eliminatepossibility of failure CORROSSION PROTECTION. The tank structure shall have a secondarycorrosion protection system using sacrificial magnesium anodes. The number of anodes, theirlocation around the tank and the mass of each anode shall be designed for anode replacementfrequency of five years. The anodes shall be installed external to the tank and concrete apronwith their location marked with a suitably label-Cost for Tank steel with 10years guaranteeincludes shel l,Steel wall,steel domed roof,Zinc Alum steel&39;,Cost for Poly ethyleneinfinityliner ,Geo synthetic Fibre with food grade plastics are used for inside coating and SupportArrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost ofFabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut andbolts,Freight Charges,Erection Installation and commissioning of tank components. |
| 171 | OD93915/2022-2023:Supply, installation and commissioning of a pre-engineered, prefabricated, factory manufactured steel storage Water Tank having a capacity of 300000 L(1Nos.) thickness of 0.6 mm, in multiple layers as required for the capacity and height of the tank and multiple-layered PE sheet/membrane for the inner containment liner. The Tank Shell / Body & amp; the Liner material shall be manufactured in a facility certified and compliant to ISO 9001 - 2000 standards. The Tank shall be supplied with access points, penetrations for inlets, outlets, drains and fittings, overflow and drain, high and low water level indicators. All connections to the tanks shall be with flanged or threaded nozzles, placed to the KWA water mains TANK ROOF :The roof of the tank shall be of corrugated Galvalume sheet steel and shall be domed, with heavy- duty Hot-dip Galvanized truss frame for support, and capable of supporting 4-5 persons for maintenance and cleaning and tank shall have an access hatch with cover, on the roof, for operation and Maintenance TANK COVER :Tank covers shall be of approved galvanized vermin proof construction. Roof ends shall be fitted with suitable vermin-proofing tape or other material, to prevent ingress of dust and foreign objects. Covers shall be firmly fixed to the top edge of the tank with galvanized bolts and nuts. LADDERS: Tanks shall be provided with Hotdip Galvanized ladders internally or externally. External roof supports shall be of an appropriately designed Hot-dip galvanized Steel construction. Tanks shall comply with relevant spill level, air gap and overflow requirements relative to Effective Capacity. All nuts and bolts used for the panels shall be a minimum of 12mm size and hot-dip galvanized/Case hardened. The tank shall have a circular angle fixed around the total circumference of the tanks, at the top, of minimum 2 mm thickness. Tanks shall be properly flushed out with clean water prior to being brought into service TANK DIMENSIONS: The dimensions of the Tank shall be of 9.710m in diameter and 4.3m in height DESIGN LIFE: The tanks shall have a design life of 50 years. TANK CONNECTIONS: Standard design valve outlet connection : i) 150mm CI Flanged valve ii) Overflow connection including an Internal approved bell-mouth shaped bends to maximize the overflow capacity. One no. 100 mm, iii) One (1) scour drain outlet from the floor of the tank with isolation valve. One No. 100mm.TANK LINERS:Tank liners shall be purpose designed and manufactured and shall comply to AS/NZS 4020 (Appendix A )of 2005 and ANSI/NSF 61 - 2008, Section 5 Certificates of compliance to above standards shall be furnished by the manufacturer of the tanks. Tank liners shall: i) Be factory manufactured to onepiece construction, fabricated from multi-layer PE sheet, certified for potable drinking water, to (ANSI/ NSF 61) and duly UV Stabilized. ii) Be of PE (polyethylene) in multi-layer construction for strength, reinforced with woven scrim industrial fabric to prevent elongation and enhance tensile strength. The total liner material thickness shall be no less than 0.6 mm thick. The tensile strength shall not be less than 2266 N (warp) and 2495 N (weft) and heat sealing strength of 2056 N v) All the liner welded lap joints shall be strengthened with Metallocene encapsulating tape welded over the overlap. vi) The Metallocene tape shall cover and protect the exposed material at the edges of the liner joints to further prevent the ingress of water into the scrim. vii) Liners shall be positively and continuously attached to the top outer edge of the circumference of the tank to prevent entry of water from the runoff from the roof structure. viii) All liners on tanks over 2m in height shall have a continuous intermediate liner support designed out of nylon (or other material)cord, around the circumference of the tank, at vertical intervals corresponding to the level of each ring. ix) The intermediate liner support cords shall be firmly secured to the steel shell at each level, to prevent stress on the liner welded joints, and thereby eliminate possibility of failure CORROSSION PROTECTION. The tank structure shall have a secondary corrosion protection system using sacrificial magnesium anodes. The number of anodes, their location around the tank and the mass of each anode shall be designed for anode replacement frequency of five years. The anodes shall be installed external to the tank and concrete apron with their location marked with a suitably label-Cost for Tank steel with 10years guarantee includes shel l,Steel wall,steel domed roof,Zinc Alum steel&39;,Cost for Poly ethylene infinity liner ,Geo synthetic Fibre with food grade plastics are used for inside coating and Support Arrangements,Cost for Fabricated items,attachments and accessories like steel ladder,Cost of Fabricated nozzles,over flow nozzles and drain arrangements, Cost for HDG nut and bolts,Freight Charges,Erection Installation and commissioning of tank components. |
| 172 | OD94052/2022-2023:DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m inrock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc |
| SR No | FileName | File Description |
| 1 | Click here to download tender document | Tender Documents |
| 2 | Click here to download tender document | Tender Documents |
| 3 | Click here to download tender document | Tender Documents |
| 4 | Click here to download tender document | Tender Documents |
| 5 | Click here to download tender document | Tender Documents |
| 6 | Click here to download tender document | Tender Documents |
| 7 | Click here to download tender document | Tender Documents |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail