Beautification Work Of Bangar Chauraha To New Yamuna Bridge - Repair of Existing Drain Cleaning for CC pathway 2 Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. 3 Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete 4 Providing and applying 2.5 mm thick road marking strips (retro- reflective) of specified shade/ colour using hot thermoplastic material by fully/ semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank eater and profile shoe heater,driven by experienced operator on road surface including cost of material,labour, T&P, cleaning the road surface of all dirt, seals, oil, grease and foreign material etc. complete as per direction of Engineer-in-charge and accordance with applicable specifications 5 Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colourpattern over 50 mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge. (80 mm thick C.C. paver block of M-35 grade with approved colour design and pattern.) 6 CLEANING & REPAIR OF ROAD 7 Earth work in exacavation in trenches for foundations and for pipes cables etc. in ordinary soil(loam clay or sand) including lift upto 1.5 m and dressing of sides and ramming of bottom sand disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50m. 8 Providing and laying in cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) and curing complete,including cost of form- work,in foundation and floors. 9 C.C.workwithcementapprovedcoarse sandand40mmgaugeapprovedstone ballast in proportion of 1:2:4 incl. cost of form work in foundation & floor 10 Centering and shuttering including strutting, propping etc. and removalof form for Columns, Pillars, Piers, Abutments, Posts and Struts 11 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc. including cutting , hoisting, fixing in position andB+61 applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete Electric resistance or induction butt welded tubes 12 Painting (two or more coats) on rain water, soil, waste and vent pipes and fittings with black anticorrosive bitumastic paint of approved brand and manufacture over and including a priming coat of ready mixed zincchromate yellow primer on new work 13 Providing precast cement concrete Jali 1:2:4 (1 cement : 2 coarse sand (zone-Ill) : 4 graded stone aggregate 6 mm nominal size ), reinforced with1.6 mm dia mild steel wire, including centering and shuttering, roughening cleaning, fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc. complete, excluding plastering ofthe jambs, sills and soffits ( 40 MM) 14 Supplying and stacking sludge at site including royalty and carriage up to 1 km (sludge measured in stacks will be reduced by 8% for payment) 15 Carriage of sludge upto 5 Km 16 Supplying and stacking at site dump manure from approved source, including carriage upto 5 km lead complete (manure measured in stacks will be reduced by 8% for payment) : Screened through sieve of I.S. designation 4.75 mm 17 Carriage of manure upto 5 Km 18 Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge 19 Spreading of sludge, dump manure and/or good earth in requiredthicknessasperdirectionofofficer-in-charge (costof sludge,dump manureand/ or good earth to be paid separately). 20 Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%), flooding with water, dressing, including removal of rubbish and surplus earth, if any with all leads and lifts ( cost of manure, sludge or extra good earth if needed to be paid for separately) 21 Providing & stacking of Phoenix sylvestris Roxb. (Wild date palm/khajur) of height 150-165 cm. in Big HDPE Bag as per direction of the officer-in-charge. 22 Providing & stacking of Pinus longifolia (Pinus) of height 90-105 cm. in cement pots of size 35cm as per direction of the officer-in-charge 23 Grassing with selection No.1 grass including watering and maintenance of the lawn for 30 days or more till the grass forms a thick lawn, free from weeds and fit for mowing including supplying good earth, if needed (the good earth shall be paid for separately). With rass Turf. 24 Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. 25 Existing Drain Cleaning