| 1 | Repairingofleakageinexisting Distribution/Rising Main/Transmission Main AC/PVC/HDPE pipe lineup to 1.5 mtr depth ofsizesasgivenbelowbydiggingout suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material tomake repairleak proof and then refilling of excavated trench/pit/road shallbe done properly i.e.afteralayer of 20cm with proper watering and ramming in layers. For entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Required material such as pipe piece, CID Joints shall be provided by Department free of cost) |
| 2 | In all type Soil AC/PVC/HDPE pipe |
| 3 | 50/63/75mm |
| 4 | 80/90mm |
| 5 | 100/110mm |
| 6 | 125/140mm |
| 7 | 150/160/180mm |
| 8 | 200/225mm |
| 9 | 250/280mm |
| 10 | 300/315mm |
| 11 | 350mm |
| 12 | 400mm |
| 13 | Add on above item no. 1.1 for B.T. Road |
| 14 | Add on above item no. 1.1 for C.C. Road . PitinCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 15 | Addonaboveno.1.1itemifdepthof pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 16 | Addonaboveno.1.1itemifdepthof pipeline is above3.0 mtr. |
| 17 | Repairingofleakageinexisting Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointingmaterial tomake repairleak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground levelforentirejobcontractorwillusehis own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe pieceCID Joints shall be provided by Department free of cost) |
| 18 | In all type Soil |
| 19 | 80mm |
| 20 | 100mm |
| 21 | 125mm |
| 22 | 150mm |
| 23 | 200mm |
| 24 | 250mm |
| 25 | 300mm |
| 26 | 350mm |
| 27 | 400mm |
| 28 | Add on above item no. 1.2 for B.T. Road |
| 29 | Add on above item no. 1.2 for C.C. Road . PitinCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 30 | Addonaboveno.1.2itemifdepthof pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 31 | Addonaboveno.1.2itemifdepthof pipeline is above3.0 mtr. |
| 32 | Minor repair of leakages such as lead caulking, plugging, clamping and ring fixing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging outsuitablesizeofpitatsiteofwork including dewatering and providing adequate safety arrangement at site to make repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as lead wool, white hump, plugs, clamps etc. shall be provided by Department free of cost) |
| 33 | In all type Soil |
| 34 | 50/63/75mm |
| 35 | 80/90mm |
| 36 | 100/110mm |
| 37 | 125/140mm |
| 38 | 150/160/180mm |
| 39 | 200/225mm |
| 40 | 250/280mm |
| 41 | 300/315mm |
| 42 | 350mm |
| 43 | 400mm |
| 44 | Add on above item no. 1.3 for B.T. Road |
| 45 | Add on above item no. 1.3 for C.C. Road . Pit inCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 46 | Addonaboveno.1.3itemifdepthofpipeline is above 1.5 mtr and up to 3.0 mtr. |
| 47 | Addonaboveno.1.3itemifdepthofpipeline is above3.0 mtr. |
| 48 | Replacement of CI/ DI Double flange sluicevalves,non return valves,butter fly valves etc.in existing Distribution/Rising Main/Transmission Main pipe line up to 1.5 mtr depth of sizes as given below by digging outsuitablesizeofpitatsiteofwork including providing and fixing MS Nut and Bolt and rubber gasket, dewatering and providing adequate safety arrangement at site and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground levelforentirejobcontractorwillusehis own T&P & labour and will arrange transportation of required material from store. (Required material such as Valve, Tail piece, CID Joints etc. shall be provided by Department free of cost) |
| 49 | In all type Soil |
| 50 | 80 mm |
| 51 | 100 mm |
| 52 | 125 mm |
| 53 | 150 mm |
| 54 | 200 mm |
| 55 | 250 mm |
| 56 | 300 mm |
| 57 | 350 mm |
| 58 | 400 mm |
| 59 | Add on above item no. 1.4 for B.T. Road |
| 60 | Add on above item no. 1.4 for C.C. Road . PitinCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 61 | Add on above item no. 1.4 if depth of pipeline is above 1.5 mtr to 3.0 mtr |
| 62 | Deduct on above item no. 1.4 if valve is fixedat plinth level / platform i.e. no excavation is required |
| 63 | Removal of Chokingfrom pipeline, including tree roots, malba,sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main AC/PVC/HDPE/uPVC pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 64 | In all type Soil |
| 65 | 75 mm |
| 66 | 90/80 mm |
| 67 | 110/100 mm |
| 68 | 140/125 mm |
| 69 | 180/160/150 mm |
| 70 | 225/200 mm |
| 71 | 250 mm |
| 72 | 300 mm |
| 73 | Add on above item no. 1.5 for B.T. Road |
| 74 | Add on above item no. 1.5 for C.C. Road . PitinCCRoadshallbecutinoptimumsizethrough CC cutter machine only. |
| 75 | Add on above item no. 1.5 if depth of pipeline is above 1.5 mtr and up to 3.0 mtr. |
| 76 | Add on above item no. 1.5 if depth of pipeline is above3.0 mtr. |
| 77 | Removal of Chokingfrom pipeline, including tree roots, malba,sand and other by manually or other means, cleaning of line and testing in existing Distribution/Rising Main/Transmission Main CI/MS/DI pipe line up to 1.5 mtr depth of sizes as given below by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material and then refill the pitfrom excavatedsandbyrammingitat sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe piece CID Joints shall be provided by Department free of cost)as per satisfaction of EIC. Rates for per pit. |
| 78 | In all type Soil |
| 79 | 80 mm |
| 80 | 100 mm |
| 81 | 125 mm |
| 82 | 150 mm |
| 83 | 225/200 mm |
| 84 | 250 mm |
| 85 | 300 mm |
| 86 | Add on above item no. 1.6 for B.T. Road |
| 87 | Add on above item no. 1.6 for C.C. Road . Pit inCCRoadshallbecutinoptimum size through CC cutter machine only. |
| 88 | Add on above item no. 1.6 if depth of pipe line is above 1.5 mtr up to 3.0 mtr. |
| 89 | Add on above item no. 1.6 if depth of pipeline is above 3.0 mtr |
| 90 | Disconnection of water connection from existing pipe line in all type of soils up to 1.5 mtr depth by digging out suitable size of pit at site of work, with cutting of service line and refixingofclamprevolvingit180degree refill the pit from excavated sand by ramming it & upto ground level for entire job contractor will use his own T&P & labour. |
| 91 | Add on above item no. 1.7 for B.T. Road |
| 92 | Add on above item no. 1.7 for C.C. Road . Pit inCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 93 | Add on above item no. 1.7 if depth of pipeline is above 1.5 mtr and up to 3.0 mtr |
| 94 | Removal of sluice valve in existing pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site. This will also include cutting of pipe ends, fixing of pipe piece with jointingmaterial tomake repairleak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground levelforentirejobcontractorwillusehis own T&P & labour and will arrange transportation of required material from store. (Required material such as pipe pieceCID Joints shall be provided by Department free of cost) |
| 95 | In all type Soil |
| 96 | 80 mm dia pipe to 100mm |
| 97 | 125 mm dia pipe to 150mm |
| 98 | 200 mm dia pipe to 250mm |
| 99 | 300 mm dia pipe to 350mm |
| 100 | 400mm |
| 101 | Add on above item no. 1.8 for B.T. Road |
| 102 | Add on above item no.1. 8 for C.C. Road . Pit inCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 103 | Add on above item no. 1.8 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 104 | Work of Inter Connection in AC/PVC/HDPE pipe line up to 1.5 mtr depth by digging out suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/CIDjointsrequiredforinter connectionshallbeprovidedbythe department free of cost). |
| 105 | In all type Soil |
| 106 | 80 mm to 110 mm |
| 107 | 125 mm to 165 mm |
| 108 | 200 mm to 300 mm |
| 109 | Add on above item no. 1.9 for B.T. Road |
| 110 | Add on above item no. 1.9 for C.C. Road . Pit inCCRoadshallbecutinoptimumsize through CC cutter machine only. |
| 111 | Add on above item no. 1.9 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 112 | Work of Inter Connection in CI/DI/MS pipe lineupto1.5mtrdepthbydiggingout suitable size of pit at site of work including dewatering and providing adequate safety arrangement at site, cutting of existing pipeline, jointing of Tee (complete) and other specials to make inter connection repair leak proof and then refill the pit from excavated sand by ramming it at sides of pipe & upto ground level for entire job contractor will use his own T&P & labour and will arrange transportation of material required from store. (Material such as Tee/ Tee Clamp/rubber sheet/CIDjointsrequiredforinter connectionshallbeprovidedbythe department free of cost). |
| 113 | In all type Soil |
| 114 | 80 mm to 100 mm |
| 115 | 125 mm to 150 mm |
| 116 | 200 mm to 300 mm |
| 117 | 350 mm to 450 mm |
| 118 | 500 mm to 600 mm |
| 119 | Add on above item no. 1.10 for B.T. Road |
| 120 | Add on above item no. 1.10for C.C. Road .Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 121 | Add on above item no. 1.10 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr |
| 122 | Labour charges for removal of complaint of polluted water supply to the consumers |
| 123 | Surveyofthelocalityofpollutedwater supply for preliminary assessment of source of pollution during supply hours |
| 124 | Labour charges for digging of pit of suitable sizeforremovalofwaterpollution on existing distribution AC/PVC/uPVC/HDPE pipe lines up to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted water during non supply hours, identifying the source of pollution and repairing of fault in pipe line by fixing of pipe piecewith jointingmaterial (pipe and jointing material shall be supplied by department) to make itleak proof and then refilling the pit from excavated sand by ramming it at site of pipe upto ground level. The rate includes all labour charges to complete the work for pipe size |
| 125 | In all type Soil |
| 126 | 50 to 75 mm |
| 127 | 80-110 mm |
| 128 | 125 to 165 mm |
| 129 | 200 to 300 mm |
| 130 | 350 to 400 mm |
| 131 | Add on above item no.1.12 for B.T. Road |
| 132 | Add on above item no. 1.12 for C.C. Road .Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 133 | Add on above item no. 1.12 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 134 | Labour charges for digging of pit of suitable size for removal of water pollution on existing distribution CI/DI/MS pipe linesup to 1.5 mtr depth including cutting of pipe and assessment of direction of flow of polluted waterduringnonsupply hours,identifying the source of pollution and repairing of fault pipe line byfixing of pipe piece with jointing material (pipe and jointing material shall be supplied by department) to make it leak proof and then refilling the pit from excavated sand by rammingitatsite of pipeuptoground level. The rate includes all labour charges tocomplete the work for pipe size |
| 135 | In all type Soil |
| 136 | 80-100 mm |
| 137 | 125 to 150 mm |
| 138 | 200 to 300 mm |
| 139 | 350 to 400 mm |
| 140 | Add on above item 1.13 for B.T. Road |
| 141 | Add on above item no. 1.13 for C.C. Road .Pit in CC Road shall be cut in optimum size through CC cutter machine only. |
| 142 | Add on above item no.1.13 if depth of pipe line is above 1.5 mtr and up to 3.0 mtr. |
| 143 | Restoration of bitumen road by patch work of WBM using crushed /broken aggregate as per the standard specification and consolidationwithhandrammerspreading and consolidation of binding material , cleaning of surface of WBM and providing of seal& tack coatas persitecondition by using ready cold mixup to the satisfaction of engineer in charge. The rate includes the making of pit in regular shape, all labour, material and T&P charge complete job. |
| 144 | Restoration of cementconcrete road includingmakingofpitinregularshape, ramming and consolidation of surface, laying, positioning and compactingcement concrete ( M-20 ) minimum thickness 200 mm upto the satisfaction of engineer incharge. The rate includes themaking of pitin regular shape, all labour, material and T&P chargecomplete job. |
| 145 | Replacingpipes/pipepiece-removing leakages from CI Pipe Line with care by excavatingtrenchtorequiredlengthand depth with dewatering and filling of trenches with earth up to original level after testing the system. This includes the earth work in excavation in saturated soil up to a depth of 0.30 m ( 1 ft ) including pumping of water etc complete as per specifications. Also this includes the extra for earth work in excavation in saturated soil for every 25 cm depth of part thereof over 0.30 m depth including pumping or bailing out of water, labour charges for dewatering, carriage ( Loading / Unloading ) of pipe and other jointing materials etc from store of Junior Engineer concern to required site, cutting of pipes and making CI Det joints in all respect for ( Rates are inclusive of earth work and exclusive of WBM / Chap / Cement Concrete/ Bituminous road cutting ) |
| 146 | CI Pressure Pipe Line ( 450 mm) |
| 147 | For Length up to 1.0 m |
| 148 | For Length up to 2.0 m |
| 149 | For Length up to 3.0 m |
| 150 | Providing and fixing of flanged/ plain ended MS Specials made from MS sheet strips of relevant IS specification of approved thickness by welding, lowering, laying, aligning, fixing in positionat all level/depths in trenches complete including all taxes, material, labour, inside lining, outside coating testing and commissioning along with pipe line as per technical specifications and direction of Engineer in-charge. |
| 151 | MS pipe specials up to 600mm dia (with minimum 5mm thicknesssheet) |
| 152 | Welding onM.S. / G.I. Pipes and othermaterial by Electric Welding, this includes all the material like welding rods/ equipment like welding machine/ generator, if required for job. |
| 153 | On Site |
| 154 | G. Total |