Supply Of Materials For The Construction Of Compound Wall To High School In Budival Village - Broken Stone Aggregate 40 Mm Size Budn001,Broken Stone Aggregate 20 Mm Size Budn001,Broken Stone Aggregate 12 Mm To 10 Mm Size Budn001,Coarse Sand (Zone Iii) Budn001,Portland Cement Budn001,Mixer (Concrete) - 1 Cum Capacity Budn001,Add Watering Charges At 1 Pecentage On Material Budn001,Add Sundries Charges At 1 Pecentage On Material Budn001,Granite/Trap Broken Metal 100 Mm And Down Size Budn001,Plasticizer / Super Plasticizer Budn001,Hom Of Vibrator 0.71 Days Budn001,Tmt Bars Fe 500 Budn001,Binding Wire Budn001,Silver Oak Or Equivalent Planks 38 Mm Thick Budn001,Casurina Poles 100 - 150 Mm Budn001,Add Handling , Loading And Unloading At 2Pecentage On Material Budn001,Add Sundries Charges At 2 Pecentage On Material Budn001,Solid Concrete Blocks (40X20x20 Cms)-5.00 N/Sqmm Budn001,Mixer (Concrete Small Used In Culvert) Budn001,Mason Class I (With Tools) Budn001,Add Handling , Loading And Unloading At 1Pecentage On Material Budn001,Add Providing And Removing Scaffolding At 3Pecentage On Labour Budn001,Mason Class Ii (With Tools) Budn001,Water Proofing Cement Paint Budn001,Add Brush, Putty, Sand Paper At 2Pecentage On Cost Of Paint Budn001,Painter Class I Budn001,Ms Flat 12 X 75Mm Budn001,Cast Iron Ornamental Design Budn001,M.S. Square Bright Bars 20Mm Budn001,Cast Iron Arrows Budn001,Expansion Bolt Budn001,Corbon Electrodes Budn001,Welder Grade I Budn001,Hom Of Welding And Grinding Machine Budn001,Add Budn001,Add Over Head Charges 15 Pecentage Budn001,Mechanic Class Ii/Mechanic Hmp Grade I/Eme Grade Budn001,Hom Of Cutting And Grinding Machine Budn001,Ready Mix Primer Paint (Ready Mix Red Lead Paint) Budn001,Add Wire Brush, Fine Steel Wool, Putty, Sand Paper, At 3Pecentage On Cost Of Paint Budn001,Enamel Metal Paint Budn001,Add Brush At 1Pecentage On Cost Of Paint Budn001,Tools & Plants And Electrical Charges At 2 Pecentage Budn001,Display Board Budn001