|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. a)Depth of excavation not exceeding 1,500 mm |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete(b) Depth of excavation for additional depth beyond1,500 mm. and upto 3,000 mm. but not requiringshoring. |
| 3 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes. (i) Pakur Variety |
| 4 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mmnominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes. M 20 Grade |
| 5 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation and upto roof of ground floor/upto 4 m (JSW/JSPL/SHYAM/SRMB/ELECTRSTEEL/SSL) |
| 6 | Brick work with 1st class bricks in cement mortar (1:4) (a) In foundation and plinth |
| 7 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](i) With 1:6 cement mortar (c) 15 mm thick plaster |
| 8 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992.(A) (i) Single Socketed 3 Meter Length (b) 110 mm INLET/OUTLET of HPGF |
| 9 | Labour for fitting and fixing U.P.V.C. pipes for above ground work including cost of jointing materials etc. fitting and fixing all necessary specials, cutting pipes, cutting holes in walls or R.C. floor where necessary and mending good all damages excluding the cost of masonry or concrete work, if necessary, but including the cost and fitting and fixing holder bat clamps (any floor) or for underground work including cutting trenches upto 1.5 metre and refilling the same complete as per direction of the Engineer in-charge. (Payment will be made on centre line measurement of the total pipeline including specials.(A) Above ground (ii) 110 mm dia. |
| 10 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992.(B) Fittings (ii) Plain Tee (b) 110 mm |
| 11 | Providing & Supplying manhole cover of size 600 x 600 mm |
| 12 | Providing & Supplying Screen mesh of size 600 mm x 550 mm |
| 13 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992. Providing & Supplying cowel |
| 14 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) |
| 15 | Construction of community level modified leach pit |
| 16 | GST Charges |
| 17 | Cess |