|
| 1 | Part A (2024-2025) |
| 2 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMSNursing hostelC wing , which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203600 nursing hostel c wing ,.40203603 nursing hostel c wing ,.40203610 nursing hostel c wing ,.40203613 nursing hostel c wing, (4 Nos.) |
| 3 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS PG Hostel C Wing Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203624 PG Hostel C wing ,.40203631PG Hostel Hostel C wing. (2 Nos.) |
| 4 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS,PG hostel A wing(WOMEN)and Nursing Hostel A wing, Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203595 new nusiring hostel Awing ,40203598new nusiring hostel Awing ,40203606 new nusiring hostel Awing ,40203616new nusiring hostel Awing ,40203619PG hostel A ((WOMEN)wing ,40203627 PG hostel (women) A wing, (6 Nos.) |
| 5 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS , UG girls ,UG boys hostel Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203591 UG GIRLS ,.40203593 UG GIRLS,40203635 UG BOYS HOSTEL, 40203638 UG BOYS HOSTEL, (4 Nos.) |
| 6 | Comprehensive maintenance of M/s Kone makeGOODS Lifts, installed atSERVICE Building AIIMS which include routine, preventive and breakdown maintenance i/c. repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 0.50 mtrs/sec(ii)Floor= Gr+1(iii)Stops&Openings=2stops,2 openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v).Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi).Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish.lift no and location 40203650 service building. (1 Nos.) |
| 7 | Comprehensive maintenance of KONE make 21 Passenger Lifts, installed at AIIMS Medical Collage Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with followingspecifications:-(i) Speed = 1.6 meters/sec(ii) Travel= About 15.60 meters.(iii) Floor = GF + 4(iv) Stop & Openings = 5 Stops & 5 Openings (All opening on the same side)(v) Controller = AC variable voltage & variable frequency)(vii) Operation = Microprocessor based duplex full collective with Digital closed loop feed-back.Lift no and location40203575 medical college, 40203579 medical college, 40203582 medical college, 402036379 medical college, (4 Nos.) |
| 8 | Comprehensive maintenance of KONE make 20 Passenger Lifts, installed at AIIMS Ayush Building which include routine, preventive and breakdown maintenance i/c. repair/ replacement warn out items/ parts with minimum down time without changing originaldesign and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1.00 meters/sec(ii) Travel= About 3.60 meters.(iii) Floor = GF + 1(iv) Stop & Openings = 2 Stops & 2 Openings (All opening on the same side)(v) Controller = AC variable voltage & variable frequency)(vii) Operation = Microprocessor based duplex full collective with Digital closed loop feed-back.(viii) Type of doors = Two Speed, two panel central opening brushed stainless steel finish. Lift no and location 40203642 ayush building (1 No.) |
| 9 | Comprehensive maintenance of M/s Kone make 15 Passenger Lifts, installed at AIIMS NURSING COLLEGE Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty andguarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1 mtrs/sec(iii)Floor= Gr+3(iv)Stops & Openings = 3 stops, 3 openings (All opening on the same side)(v) Controller = AC variable voltage & variablefrequency(vi) Operation = Microprocessor based duplex full collective with digital closed loop feed back(vii)Type of doors= Two speed two panel central opening brushed stainless steel finish .lift no. and location 40203584 nusring college ,40203587 nursing college (2 Nos.) |
| 10 | Comprehensive maintenance of M/s Kone make 15 Passenger Lifts, installed at AIIMS library Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1 mtrs/sec(ii)Floor= Gr+2(iii)Stops & Openings = 3 stops, 3 openings (Allopening center)(iv) Controller = AC variable voltage & variable frequency(v) Operation = Microprocessor based duplex full collective with digital closed loop feed back(vi)Type of doors= Two speed two panel central opening brushed stainless steel finish.lift and location 40206382 library (1 Nos.) |
| 11 | Comprehensive maintenance of M/s Kone make 13(884 KG) Passenger Lifts (gearless Kone I Monoscope) installed at AIIMS Extension of UG boys Hostel) Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1.0 mtrs/sec (ii) Travel = About 15.3 Meters(iii)Floor= GF+ 5th (iv)Stops & Openings = 6 stops, 6 openings (Allopening on the same side )1.1 43852943, 43852944 |
| 12 | Part B (2025-2026) |
| 13 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMSNursing hostelC wing , which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203600 nursing hostel c wing ,.40203603 nursing hostel c wing ,.40203610 nursing hostel c wing ,.40203613 nursing hostel c wing, (4 Nos.) |
| 14 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS PG Hostel C Wing Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203624 PG Hostel C wing ,.40203631PG Hostel Hostel C wing. (2 Nos.) |
| 15 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS,PG hostel A wing(WOMEN)and Nursing Hostel A wing, Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203595 new nusiring hostel Awing ,40203598new nusiring hostel Awing ,40203606 new nusiring hostel Awing ,40203616new nusiring hostel Awing ,40203619PG hostel A ((WOMEN)wing ,40203627 PG hostel (women) A wing, (6 Nos.) |
| 16 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS , UG girls ,UG boys hostel Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203591 UG GIRLS ,.40203593 UG GIRLS,40203635 UG BOYS HOSTEL, 40203638 UG BOYS HOSTEL, (4 Nos.) |
| 17 | Comprehensive maintenance of M/s Kone makeGOODS Lifts, installed atSERVICE Building AIIMS which include routine, preventive and breakdown maintenance i/c. repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 0.50 mtrs/sec(ii)Floor= Gr+1(iii)Stops&Openings=2stops,2 openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v).Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi).Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish.lift no and location 40203650 service building. (1 Nos.) |
| 18 | Comprehensive maintenance of KONE make 21 Passenger Lifts, installed at AIIMS Medical Collage Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with followingspecifications:-(i) Speed = 1.6 meters/sec(ii) Travel= About 15.60 meters.(iii) Floor = GF + 4(iv) Stop & Openings = 5 Stops & 5 Openings (All opening on the same side)(v) Controller = AC variable voltage & variable frequency)(vii) Operation = Microprocessor based duplex full collective with Digital closed loop feed-back.Lift no and location40203575 medical college, 40203579 medical college, 40203582 medical college, 402036379 medical college, (4 Nos.) |
| 19 | Comprehensive maintenance of KONE make 20 Passenger Lifts, installed at AIIMS Ayush Building which include routine, preventive and breakdown maintenance i/c. repair/ replacement warn out items/ parts with minimum down time without changing originaldesign and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1.00 meters/sec(ii) Travel= About 3.60 meters.(iii) Floor = GF + 1(iv) Stop & Openings = 2 Stops & 2 Openings (All opening on the same side)(v) Controller = AC variable voltage & variable frequency)(vii) Operation = Microprocessor based duplex full collective with Digital closed loop feed-back.(viii) Type of doors = Two Speed, two panel central opening brushed stainless steel finish. Lift no and location 40203642 ayush building (1 No.) |
| 20 | Comprehensive maintenance of M/s Kone make 15 Passenger Lifts, installed at AIIMS NURSING COLLEGE Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty andguarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1 mtrs/sec(iii)Floor= Gr+3(iv)Stops & Openings = 3 stops, 3 openings (All opening on the same side)(v) Controller = AC variable voltage & variablefrequency(vi) Operation = Microprocessor based duplex full collective with digital closed loop feed back(vii)Type of doors= Two speed two panel central opening brushed stainless steel finish .lift no. and location 40203584 nusring college ,40203587 nursing college (2 Nos.) |
| 21 | Comprehensive maintenance of M/s Kone make 15 Passenger Lifts, installed at AIIMS library Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1 mtrs/sec(ii)Floor= Gr+2(iii)Stops & Openings = 3 stops, 3 openings (Allopening center)(iv) Controller = AC variable voltage & variable frequency(v) Operation = Microprocessor based duplex full collective with digital closed loop feed back(vi)Type of doors= Two speed two panel central opening brushed stainless steel finish.lift and location 40206382 library (1 Nos.) |
| 22 | Comprehensive maintenance of M/s Kone make 13(884 KG) Passenger Lifts (gearless Kone I Monoscope) installed at AIIMS Extension of UG boys Hostel) Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1.0 mtrs/sec (ii) Travel = About 15.3 Meters(iii)Floor= GF+ 5th (iv)Stops & Openings = 6 stops, 6 openings (Allopening on the same side )1.1 43852943, 43852944 |
| 23 | Part C(2026-2027) |
| 24 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMSNursing hostelC wing , which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203600 nursing hostel c wing ,.40203603 nursing hostel c wing ,.40203610 nursing hostel c wing ,.40203613 nursing hostel c wing, (4 Nos.) |
| 25 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS PG Hostel C Wing Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203624 PG Hostel C wing ,.40203631PG Hostel Hostel C wing. (2 Nos.) |
| 26 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS,PG hostel A wing(WOMEN)and Nursing Hostel A wing, Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203595 new nusiring hostel Awing ,40203598new nusiring hostel Awing ,40203606 new nusiring hostel Awing ,40203616new nusiring hostel Awing ,40203619PG hostel A ((WOMEN)wing ,40203627 PG hostel (women) A wing, (6 Nos.) |
| 27 | Comprehensive maintenance of M/s Kone make 13 Passenger Lifts, installed at AIIMS , UG girls ,UG boys hostel Building which include routine, preventive and breakdownmaintenancei/c.repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 1.6 mtrs/sec(ii)Floor= Gr+6(iii)Stops&Openings=7stops,7openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v)Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi)Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish. lift no.40203591 UG GIRLS ,.40203593 UG GIRLS,40203635 UG BOYS HOSTEL, 40203638 UG BOYS HOSTEL, (4 Nos.) |
| 28 | Comprehensive maintenance of M/s Kone makeGOODS Lifts, installed atSERVICE Building AIIMS which include routine, preventive and breakdown maintenance i/c. repair/replacement warnoutitems/partswithminimumdowntime withoutchangingoriginaldesignandwarrantyand guarantee of repaired /replaced items etc. as requiredwith following specifications:-(i) Speed = 0.50 mtrs/sec(ii)Floor= Gr+1(iii)Stops&Openings=2stops,2 openings(All opening on the same side)(iv)Controller=ACvariablevoltage&variable frequency(v).Operation=Microprocessorbasedduplexfull collective with digital closed loop feed back(vi).Typeofdoors=Twospeedtwopanelcentral openingbrushed stainless steel finish.lift no and location 40203650 service building. (1 Nos.) |
| 29 | Comprehensive maintenance of KONE make 21 Passenger Lifts, installed at AIIMS Medical Collage Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with followingspecifications:-(i) Speed = 1.6 meters/sec(ii) Travel= About 15.60 meters.(iii) Floor = GF + 4(iv) Stop & Openings = 5 Stops & 5 Openings (All opening on the same side)(v) Controller = AC variable voltage & variable frequency)(vii) Operation = Microprocessor based duplex full collective with Digital closed loop feed-back.Lift no and location40203575 medical college, 40203579 medical college, 40203582 medical college, 402036379 medical college, (4 Nos.) |
| 30 | Comprehensive maintenance of KONE make 20 Passenger Lifts, installed at AIIMS Ayush Building which include routine, preventive and breakdown maintenance i/c. repair/ replacement warn out items/ parts with minimum down time without changing originaldesign and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1.00 meters/sec(ii) Travel= About 3.60 meters.(iii) Floor = GF + 1(iv) Stop & Openings = 2 Stops & 2 Openings (All opening on the same side)(v) Controller = AC variable voltage & variable frequency)(vii) Operation = Microprocessor based duplex full collective with Digital closed loop feed-back.(viii) Type of doors = Two Speed, two panel central opening brushed stainless steel finish. Lift no and location 40203642 ayush building (1 No.) |
| 31 | Comprehensive maintenance of M/s Kone make 15 Passenger Lifts, installed at AIIMS NURSING COLLEGE Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty andguarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1 mtrs/sec(iii)Floor= Gr+3(iv)Stops & Openings = 3 stops, 3 openings (All opening on the same side)(v) Controller = AC variable voltage & variablefrequency(vi) Operation = Microprocessor based duplex full collective with digital closed loop feed back(vii)Type of doors= Two speed two panel central opening brushed stainless steel finish .lift no. and location 40203584 nusring college ,40203587 nursing college (2 Nos.) |
| 32 | Comprehensive maintenance of M/s Kone make 15 Passenger Lifts, installed at AIIMS library Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1 mtrs/sec(ii)Floor= Gr+2(iii)Stops & Openings = 3 stops, 3 openings (Allopening center)(iv) Controller = AC variable voltage & variable frequency(v) Operation = Microprocessor based duplex full collective with digital closed loop feed back(vi)Type of doors= Two speed two panel central opening brushed stainless steel finish.lift and location 40206382 library (1 Nos.) |
| 33 | Comprehensive maintenance of M/s Kone make 13(884 KG) Passenger Lifts (gearless Kone I Monoscope) installed at AIIMS Extension of UG boys Hostel) Building which include routine, preventive and breakdown maintenance i/c. repair/replacement warn out items/ parts with minimum down time without changing original design and warranty and guarantee of repaired /replaced items etc. as required with following specifications:-(i) Speed = 1.0 mtrs/sec (ii) Travel = About 15.3 Meters(iii)Floor= GF+ 5th (iv)Stops & Openings = 6 stops, 6 openings (Allopening on the same side )1.1 43852943, 43852944 |