Tender For Special Repair Of Kursi Kheda Road To Krishna Datt Niwada Via Dalikpur Maharajpur Link Road (Vr) (Including 5 Year Maintenance Cost) - Providing, Laying, Spreading And Compacting Stone Aggregates Of Specific Sizes (22.4-53 Mm Guage) To Water Bo
Tender Overview
Project Description
Special Repair Of Kursi Kheda Road To Krishna Datt Niwada Via Dalikpur Maharajpur Link Road (Vr) (Including 5 Year Maintenance Cost) - Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm guage) to water bound macadam (WBM-3) specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD Technical Specification Clause 405. (MORD 4.7) (3) (a) by Manual Means 2 Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (MORD 5.01) 3 Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (MORD 5.02) (iii) 4 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.Case - I By Manual Means (I) Bitumen VG-10 5 Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510Case - III : Type CB. By Manual Means (I) Bitumen VG-10 6 Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (MORD 3.14). 7 Maintenance Charges for Bituminous Surfaceincluding @ Earth work, Repair of Painted Surface, Earthwork in Patri, etc. as Per GO-17/2024/sa-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Letter CE (HQ-1) PWD Lucknow 3689C-OPRMC/mool 23-24 Dated 17.02.2024 subjected to approval from Govt. Maintenance of 1st Year after completion of work (for above Item No. 1 to 6) @ Zero % of cost of construction of work / BOQ. 8 Item No.7 but Maintenance of 2nd Year after completion of work @ 0.75% of total Work amount of item 1 to 6. 9 Item No.7 but Maintenance of 3rd Year after completion of work @ 1.50% of total Work amount of item 1 to 6. 10 Item No.7 but Maintenance of 4th Year after completion of work @ 2.25% of total Work amount of item 1 to 6. 11 Item No.7 but Maintenance of 5th Year after completion of work @ 3.00% of total Work amount of item 1 to 6.
BOQ
| Sl. No. | Item Description |
| 1 | Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53 mm guage) to water bound macadam (WBM-3) specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per MORD Technical Specification Clause 405. (MORD 4.7) (3) (a) by Manual Means |
| 2 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502 (MORD 5.01) |
| 3 | Providing and applying tack coat with Bitumen VG-10 using bitumen pressure distributor at the rate of 0.35 kg per sqm on the granular surface cleaned with Hydraulic broom as per Technical Specification Clause 503. (MORD 5.02) (iii) |
| 4 | 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.Case - I By Manual Means (I) Bitumen VG-10 |
| 5 | Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510Case - III : Type CB. By Manual Means (I) Bitumen VG-10 |
| 6 | Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (MORD 3.14). |
| 7 | Maintenance Charges for Bituminous Surfaceincluding @ Earth work, Repair of Painted Surface, Earthwork in Patri, etc. as Per GO-17/2024/sa-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Letter CE (HQ-1) PWD Lucknow 3689C-OPRMC/mool 23-24 Dated 17.02.2024 subjected to approval from Govt. Maintenance of 1st Year after completion of work (for above Item No. 1 to 6) @ Zero % of cost of construction of work / BOQ. |
| 8 | Item No.7 but Maintenance of 2nd Year after completion of work @ 0.75% of total Work amount of item 1 to 6. |
| 9 | Item No.7 but Maintenance of 3rd Year after completion of work @ 1.50% of total Work amount of item 1 to 6. |
| 10 | Item No.7 but Maintenance of 4th Year after completion of work @ 2.25% of total Work amount of item 1 to 6. |
| 11 | Item No.7 but Maintenance of 5th Year after completion of work @ 3.00% of total Work amount of item 1 to 6. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender