| 1 | Carriage of 8.5/9 Mtrs. long PCC pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 2 | Carriage of 9/11 Mtrs. long ST Pole from 132 KV Store Center Mathura to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) |
| 3 | Carriage of Line material i.e. conductor, G.I. wire TPMO stay rod, disc insulator, cross arm, Angle channel and other required material from Store Center at 132 KV substation Mathura to the site of work including loading and unloading of material at both ends. |
| 4 | Replacement of 8.5/9 Mtrs. Long damaged PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work. |
| 5 | Replacement of 9/11 Mtrs. long ST damaged pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to other place) required for proper completion of work. |
| 6 | Dismantling of existing damaged Double Pole structure on 8.5/9/11 Mtrs. long PCC/ST pole by opening all relevant accessories. |
| 7 | Erection of Double pole structure on 8.5/9 Mtrs. long PCC pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms. |
| 8 | Erection of Double pole structure on 9/11 Mtrs. long ST pole by digging of pits. Opening and fitting of all relevant accessories as per RESPO norms. |
| 9 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 10 | Installation of stay set with grouting and Nuzzling etc. as per RESPO drawing /norms along with all routine material to be used for such works. |
| 11 | Removal of ACSR Weasel conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer and its carriage to J.E. Store with loading and unloading at both ends. |
| 12 | Removal of ACSR Dog/Raccon conductor existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer and its carriage to J.E. Store with loading and unloading at both ends. |
| 13 | Removal of Arial Bunch Conductor 3x50/95 sq mm. existing conductor from damaged line/Pole including opening of jumpers etc as per requirement of site and as per direction of Supervising Engineer and its carriage to J.E. Store with loading and unloading at both ends. |
| 14 | Laying, sagging and stringing and jumpering / binding etc. ofnew &old ACSR Weasel conductor in 11 KV/ LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work |
| 15 | Laying, sagging and stringing and jumpering / binding etc. ofnew &old ACSR Dog/Raccon conductor in 11 KV/33KV lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work |
| 16 | Laying, sagging and stringing and jumpering / binding etc. ofnew &old Arial Bunch Conductor 3x50/95 sq mm. in LT lines as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work |
| 17 | Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 18 | Re-sagging of loose Arial Bunch Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 19 | Straightening of 8.5/9 Mtr. Long PCC/ST/Rail Pole tilted poleat various places by straighteningof pole including the cost of labour ,T&P charges required for proper completion of work. |
| 20 | Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. |
| 21 | Chopping of Tree branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc. |