Tender for Special Repair Work At Dadri Kathera Road In District Gautambudhnagar - Part-A (Bituminous Work)Earth work in Embankment (For Patri) with ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M. in depth and earth work in patries should be including ramming and dressing the surface to required levels and slopes as directed by the Engineer incharge.Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. As per S.I. No. 253 a 2 Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3.Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. As per Technical Specification Clause 405. 3 Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared granular/Bituminous surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.Including cost of, all material, Bitumen, labour, T&P, all taxes and labour cess complete. But excluding GST. 4 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen VG-10 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per MORD specifiction clause 508. Including cost of, all material, Bitumen, labour, T&P,royality , all taxes and labour cess complete. But excluding GST. 5 Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen,labour, T&P,royality, all taxes and labour cess complete. But excluding GST. 6 Part-B (C.C. Work)Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5. Including cost of, all material, labour, T&P, Labour cess, all taxes complete. But excluding GST. As per S.I. No. 253 a 7 Providing, laying, spreading and compacting stone aggregates of 22.4-53 mm sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with threewheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. As per Technical Specification Clause 405. 8 Construction of un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2M 30(Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant,near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and finished with Power Trowel Cum Floter-Trimix Flooring Machine.Technical Specification Clause 1501. Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. As per Technical Specification Clause 405. 9 Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move). Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. SI.No. 251a 10 Cement Concrete with 4 cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. SI.No. 281 11 R.C.C. work with Cement approved coarse sand and 2 cm.(3/4) gauge approved stone ballast in the proportions of 1:2:4 in lintels fo doors and windows excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 B.W. G.G.I., binding wire and including necessary centering and shuttering etc. and also including supply of all materials, labour and T & P etc. required for proper completion of the work. Excluding cost of Binding wire. Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. SI.No. 283 12 Supplying, fitting and placing with MS bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 including bending for proper and necessary completion of the work and including supply of steel and wastages, bends, hooks and authorised overlapping shall be measurised as per direction of Engineer-in-charge.Including cost of, all material, labour, T&P,royality, Labour cess, all taxes complete. But excluding GST. 13 Part - A (Bitiminous Work) 05 years Maintenance Charge @15% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T.First year Maintenance Charge @ 0.00 14 Second year Maintenance Charge @ 1.50 % 15 Third year Maintenance Charge @ 3.00% 16 Fourth year Maintenance Charge @ 4.50% 17 Fifth year Maintenance Charge @ 6.00% 18 Part - B (C.C. Work) 05 years Maintenance Charge @ 2.5% Routine maintenance of road for 05 years after the completion of work vide GO No. - 17/2024 SA-113/23-1-2024-23-1099/113/2023 Dated 16.01.2024 & Latter No. 36890C/RMC/Mool-23-24, Date 17.02.2024 of ENC PWD, Lucknow Rate Excluding Cost of G.S.T.First year Maintenance Charge @ 0.00% 19 Second year Maintenance Charge @ 0.25 20 Third year Maintenance Charge @ 0.50% 21 Fouth year Maintenance Charge @ 0.75% 22 Fifth year Maintenance Charge @ 1.00%