| 1 | Takingout Jhaw/Eucalyptus piles from river bed or from else where including carrying, stacking materials in the nearest stack yard. (b)above17.5 cm.and upto 25cm Diameter |
| 2 | Labour charges for taking out old wood work including cutting bolts and nuts and stacking within a lead of 100 metre etc.complete as per the direction of the Engineer-in-charge.(The quantum should be corrected upto 3 decimels) |
| 3 | Takingout bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same with in 150 metre from the site of work including sorting out and stacking serviceable meterials(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 4 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(iii) 15 cm av. Diameter |
| 5 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.(iii) 15 cm av. diameter |
| 6 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 7 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 8 | Extra rate over Item Nos. 2 for all kinds of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. 2 (Two) Extra lead. |
| 9 | Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 10 | Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag. |
| 11 | Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts. |
| 12 | Bailing or pumping out water from foundation trenches. |
| 13 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.(a) Depth of excavation not exceeding 1,500 mm. |
| 14 | Coaltarringwith5%pitchincludingcostofmaterialandlabour complete as per direction of the Engineer-in-charge. b) Two Coat |
| 15 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) |
| 16 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches |
| 17 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety. |
| 18 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction.(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction ofEngineer-In-Charge. |
| 19 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. |
| 20 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.JSW/JSPL/SHYAM/SRMB/BMASL/ELECTRO STEEL/SSL |
| 21 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1956 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 1957, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for thework including all incidental chages such as electricity charges, labour insurance charges etc. Payment to bemade on the basis of calculated weight of structural members only in finished work as per ISspecified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7%of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15% of weight for finished structal membersweighing less than 22.5 Kg. / m. may beincreased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment beingmade for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level fromthe ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.I) For structural members of specified sectionsweighing less than 22.5 Kg./m |
| 22 | (B)Painting with ready mixed red lead paint of approved make and brand :(b) Two coats |
| 23 | Painting on steel or other metal surface with any approved bituminous anticorrosive paint after preparing the surface including removing paints,cleaning,smoothening etc.including scaffolding where necessary including cost of all materials complete.b) Two coats |
| 24 | Taking out Jhaw / Eucalyptus piles from river bed or from elsewhereincluding carrying, stacking materials in the nearest stack yard.(a) Up to 17.5 cm. diameter |
| 25 | Taking out bullah wailing pieces after removing nuts, bolts and iron nails and stacking the same within 150 metre from the site of workincluding sorting out and stacking serviceable meterials. |
| 26 | Removing earth/sand filled poly bags/gunny bags from the channel bed/slope and initially depositing the same near channel bank at a place as directed by the Engineer-in Charge for measurement of Bag.& then disposing off the same at a distance not less than 150 metre from the channel site. |