|
| 1 | Dismantling bricks or stone work in lime or cement mortar and including stacking of material as directed by the Engineer-In-Charge within a distance of 60 meters. |
| 2 | Earth work in Mar, Kabar, Rankar, & Kankar mixed soil in Fillingembankment including lead upto 195 M. and lift upto 1.5 M including dressing making profile and manual compaction but excluding mechanical compaction. |
| 3 | Excavation 0f Foundation in Mar, Kabar, Rankar and Kankar mixed soils including lead upto 30 meter and lift upto 1.5 mincluding filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removel and disposal of surplus earth as directed by the Engineer-In-Charge within a distance of 30 meters from the foundation. |
| 4 | Laying P.C.C. M-10 (1:3:6) With cement , coarse sand of F.M not less then 2.5 and crused hard stone grid of size 4.75 to 20 mm size including lead 30 meters and lift 1.5 meters mechnical mixing and vibrator but excluding cost of centering and shuttering required for proper completion of work including cost of all Material & Labour T&P etc. |
| 5 | Class-150 brick work in 1:4 With cement , coarse sand including cost ofall materiallabour T&P etc. |
| 6 | Laying C.C. M-20 With cement , coarse sand of F.M not less then 2.5 and crused hard stone grid of size 4.75 to 20 mm size including lead 30 meters and lift 1.5 meters mechnical mixing and vibrator but excluding cost of centering and shuttering required for proper completion of work including cost of all Material & Labour T&P etc. |
| 7 | Centering & shuttering for R.C.C. work including all Material & Labour and T & P etc. |
| 8 | Cutting bending and placing TMT steel bar for reinforcement with cost of binding wire with required for proper completion of work including cost of materials , labours, T&P, etc. |
| 9 | Struck pointing with cement mortar consisting1 part cement and 3 part of fine sand of 1.25 fineness modulus. |
| 10 | Laying C.C. M-15 With cement , coarse sand of F.M not less then 2.5 and crused hard stone grid of size 4.75 to 20 mm size including lead 30 meters and lift 1.5 meters mechnical mixing and vibrator but excluding cost of centering and shuttering required for proper completion of work including cost of all Material & Labour T&P etc. |
| 11 | 12.5 mm cement plaster on bricks work with cement mortar of mix 1:4 |
| 12 | Providing and Laying Non pressure NP-2 class (Light Duty) RCC Pipes with collarst jointed with stiff mixure of cement mortar in the proportion of 1:2 (1 cement:2 fine sand) including testing of joint etc. complete. |
| 13 | Providing and Laying Pitching on Slope as per drawing and Technical Specification Clause 1302. |
| 14 | Khanda Stone Masonary Work in 1:4 (1 Cement 4 Sand) Including all Cost of Material Labour T&P Complete Required for Proper Complete Of Work. |