|
| 1 | Noise Monitoring Terminal (NMT) |
| 2 | IEC61672-1(2013) Class1: Outdoor Microphone |
| 3 | NMT system with alphanumeric display at monitoring Stations |
| 4 | P4 outdoor video wall(6.31x6.31) |
| 5 | High gain GSM/GPRS Antenna (8 DB dual band antenna) or better |
| 6 | IP-65 compliant Enclosure for Remote Stations |
| 7 | Transmission unit-GSM/GPRS Modem or better |
| 8 | Intrusion alarm to be transmitted at Central Station |
| 9 | Power backup |
| 10 | External battery (minimum 65AH) sealed maintenance free (24hrs backup) |
| 11 | Solar Panel for Power Backup (minimum 75 watts) |
| 12 | Solar charge controller (minimum 20Amp) |
| 13 | External NEMA 4 Enclosure |
| 14 | Recurring Charges |
| 15 | Remote station recurring charges on yearly basis including SIM cost, 08 number of stations recurring cost and any other cost. |
| 16 | Recurring Charges on yearly basis for Central Server with 4Mbps or better fixed IP Connection |
| 17 | Remote display, GPRS receiving charges on yearly basis (8 Nos Alphanumeric and 2 Nos. P4 Outdoor video wall) |
| 18 | Central Receiving station |
| 19 | Charges for Empanelled Cloud Based Server |
| 20 | Analysis Software with full graphics display, communicationmanagement and database generation for Cloud Based Server |
| 21 | Web Enabled Software for data distribution |
| 22 | Data Processing Workstation |
| 23 | Installation and Civil Work |
| 24 | 4 meters triangular lattice mast and mounting accessories |
| 25 | Installation of the remote stations with Civil work |
| 26 | Installation of the P4 outdoor video wallwith Civil work |
| 27 | Automatic backup |
| 28 | 4TB NAS Drive for incremental backup of existing and newsystem. |
| 29 | Calibrators |
| 30 | Handheld stand noise system with transportation kit |
| 31 | External acoustic calibrator with microphone adaptor |
| 32 | Transportation and insurance |
| 33 | Transportation and insurance of material to respective sites |
| 34 | Two Year Extended Warranty |
| 35 | CAMC |
| 36 | Comprehensive Annual Maintenance Cost for 4thyear |
| 37 | Comprehensive Annual Maintenance Cost for 5thyear |
| 38 | Comprehensive Annual Maintenance Cost for 6th year |
| 39 | Comprehensive Annual Maintenance Cost for 7th year |
| 40 | Comprehensive Annual Maintenance Cost for 8th year |