| 1 | PIPE LINE WORKS OF THE THERMIC FLUID HEATER |
| 2 | Supply, fabrication and erection of thermic fluid lines with 80 NB C MS \"C\" class pipes including,fixing, welding andcutting consumables all inclusive of the flanges, bends, reducers etc and necessary fittngs as required for the successful installation |
| 3 | Supply, fabrication and erection of thermic fluid lines with 100 NB C MS \"C\" class pipes including,fixing, welding andcutting consumables including flanges, bends, reducers etcand necessary fittings required for the successful installation |
| 4 | Supply, fabrication and installation of 80 NB Cast steelgate valve including,fixing, welding andcutting, consumable, etc |
| 5 | Supply, fabrication and installation of 60 NB Cast steelgate valve including,fixing, welding andcutting, consumable, etc |
| 6 | Supply, fabrication and installation of 80 NB Cast steelnon return valve including,fixing, welding andcutting, consumable, etc |
| 7 | Supply, fabrication and installation of 3way valve for controlling the heat,including,fixing, welding andcutting, consumable, etc |
| 8 | Supply and installation of control panel for the controlling of 3 way valve including it electrical wirings. |
| 9 | Supply and installation of a booster pump for maintaining adequate pressure and head in the line. The pump shall be of the flow rate of 25m3 per hour and head of 45 mtrs. Includingnecessary electrical works, valves, bends and other fittings. |
| 10 | Supply and installation of a circulation pump formaintaining circulation in the dryer. The pump shall be of the flow rate of 25m3 per hour and head of 30 mtrs. . Includingnecessary electrical works, valves, bends and other fittings. |
| 11 | Fixing of structural supports including welding and cutting consumables |
| 12 | Fabrication , fixing of thermal insulation with 50mm thick rock wool/ slab packed by chicken wire mesh and cladding with aluminum sheet. |
| 13 | Draining of the existing thermic fluid from the pipe lines and equipments. Cleaning and removal of sludge from the existing pipe lines of the dryer and TFH using proper chemical treatment meathod. |
| 14 | supply and installation of pneumatic pipe line works for the working of 3way valve, all inclusive of the piping and connections as per the site condition |
| 15 | Supply and filing of thermic fluid to the new pipe line. The thermic fluid should be matching with the existing fluid in the system. |