| 1 | IT Hardware for SCADA/ADMS for Main Control Centre and RVDUs |
| 2 | ISR server |
| 3 | SMS gateway Server |
| 4 | Workstation with dual TFT Monitors( S/S monitoring) |
| 5 | Workstation with dual TFT Monitors (Network monitoring) |
| 6 | Remote VDUs with one TFT Monitors |
| 7 | Developmental console with one TFT |
| 8 | Storage & Backup Devices |
| 9 | SAN STORAGE 12 TB |
| 10 | Exteranl DAT drive |
| 11 | Routers |
| 12 | Router at remote VDU |
| 13 | Security system (DMZ) |
| 14 | Router |
| 15 | Firewall & network IDS/IPS |
| 16 | Layer III switch |
| 17 | Mandatory Spare @ 5% ofhardware part for control cneter |
| 18 | IT Hardware for SCADA/ADMS for backup Control Centre |
| 19 | ISR server |
| 20 | SMS gateway |
| 21 | Workstation with dual TFT Monitors( S/S monitoring) |
| 22 | Workstation with dual TFT Monitors (Network monitoring) |
| 23 | Developmental console with one TFT |
| 24 | Storage & Backup Devices |
| 25 | Exteranl DAT drive |
| 26 | SAN STORAGE 12 TB |
| 27 | Security system (DMZ) |
| 28 | Router |
| 29 | Firewall & network IDS/IPS |
| 30 | Layer III switch |
| 31 | Mandatory Spare @ 5% ofhardware part forbackup center |
| 32 | Software required for SCADA/ADMS at MCC |
| 33 | ISR Software |
| 34 | Integration with National SCADA Resource Center |
| 35 | Network Management Software |
| 36 | Any other software to meet functional/performance requierments to achieve SCADA system as per RFP |
| 37 | Software required for SCADA/ADMS at BCC |
| 38 | Any other software to meet functional/performance requierments to achieve SCADA system as per RFP |
| 39 | ISR Software |
| 40 | Remote terminal Unit (RTU) |
| 41 | RTU base equipment comprising panels,racks, sub-racks, Power Supply modules, CPU,interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules |
| 42 | Layer II Switch for integration of Numerical Relay with RTU ( 24 Port)( Industrial grade ) IEC 61850 |
| 43 | Multifunctuions transducers |
| 44 | Contact Multiplying Relays (CMRs) |
| 45 | Heavy duty relays for Control |
| 46 | Transformer Transducers |
| 47 | Dummy Breaker Latching Relays |
| 48 | Single TFT PC for LDMS |
| 49 | LDMS software |
| 50 | Mandatory Spare @5% of hardware part for RTU |
| 51 | TEST Software/Hardware Tools for RTU |
| 52 | RTU Database Configuration & Maintenance Software tool |
| 53 | Master Station cum RTU Simulator & Protocol analyser software tool |
| 54 | Laptop for the installation of above software tools along withinterfacing hardware including Hub |
| 55 | Feeder Remote terminal Unit (FRTU) |
| 56 | Mini pole mounted FRTU base equipment along with enclosure suitable to work in open environment (Adequate protection from water & dust),racks, sub-racks, Power Supply modules with power backup , I/o modules, CPU,interfacing equipment, required converters & all other required items/accessories including complete wiring for all modules. |
| 57 | FRTU Database Configuration & Maintenance Software tool |
| 58 | Master Station cum FRTU Simulator & Protocol analyser software tool |
| 59 | Laptop PC for above software tools along withinterfacing hardware including Hub |
| 60 | Mandatory Spare @5% of hardware part of FRTU |
| 61 | Communication System |
| 62 | 2 year Chargesfor 10 Mbps Links with RTUs fromdate of project go live |
| 63 | MPLS/SDWAN Router |
| 64 | 2 year Chargesfor 2 Mbps Links with FRTUs /FPI fromdate of project go live |
| 65 | Modems |
| 66 | Mandatory Spare @ 5% ofhardware for communication system |
| 67 | Power Supply |
| 68 | 24V DC Power Supply (DCPS) system based on SMPSfor RTU / Data Concentrator / Communication Equipment |
| 69 | 24 V DC Power Supply (DCPS) system based on SMPS for FRTU |
| 70 | UPS (2 kVA ) |
| 71 | Mandatory Spare @5% of hardware for power supply item |
| 72 | RMU |
| 73 | 11 KV 3W RMU |
| 74 | 11 KV 4W RMU |
| 75 | 33KV 4W RMU |
| 76 | 11 KV Auto recloser |
| 77 | Numerical relay /BCPU(SCADA compatible) |
| 78 | 11 KV Sectionalizer |
| 79 | Mandatory Spare @5% of hardware for RMU, sectinaliser, auto recloser and bpcu |
| 80 | Project Management Cost |
| 81 | Installation, Testing and Commissioning Cost to Integrate Entire SCADA & IT (relevant to SCADA) Infrastructure |
| 82 | Integration with legacy applications & Data Migration |
| 83 | Training for the Employees |
| 84 | FMS Charges |
| 85 | FMSSERVICESFOR 5 YEARSAFTER GO-L IVE |
| 86 | DT Health Management(DTHM) |
| 87 | Lug Temprature Sensor |
| 88 | Oil Temparature Sensor |
| 89 | Oil Level Sensor |
| 90 | 5G Gateway |
| 91 | DCU |
| 92 | Software as a Service(SaaS) Base web dashboard(12 Month) |
| 93 | Annual Maintenance (12 Month) |
| 94 | Voltage Regulations & Harmonic Management-Power Quality meters, Active Harmonic Filter and Smart Inverters |
| 95 | Power Quality Meter/ Analyzer |
| 96 | Active Harmonic Filter |
| 97 | Smart Inverters |
| 98 | Reconductoring and Development of Ring Main System |
| 99 | Cable H.T.XLPE 11 KV 3x185 SQ.M.M |
| 100 | Cable Termination Kits O/D 11 KV 3x185 XLPE |
| 101 | Cable Termination Kits I/D 11 KV 3x185 XLPE |
| 102 | Cable H.T.XLPE 33 KV 3x300 SQ.M.M |
| 103 | Cable Termination Kits O/D 33 KV 3x300 SQ.M.M |
| 104 | Cable Termination Kits I/D 33 KV 3x300 SQ.M.M |
| 105 | 11 Mtr STP Pole (SP-55) |
| 106 | 9.5 Mtr STP Pole (SP-33) |
| 107 | MS Items such as Clamp, MS Channel, MS Angle |
| 108 | MS Pipe 160 mm dia 3 metre long |
| 109 | Sundries Items such as earthing set, stay set, Danger plate, Pin Insulator, Barbed wire, Nut bolts, disc insulators, etc. |
| 110 | Control/power cable for RTUsfrom outdoorswitchgear,if any at S/S and numericalrelays |
| 111 | Control /Power cable |