| 1 | Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm. |
| 2 | Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming. |
| 3 | Cost of stone boulder 150 mm size delivered ans stacked at site. |
| 4 | Ordinary cement concrete(mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttring and reinforcement, if any, in ground floor as per relevant IS codes. (b) River bazree. |
| 5 | Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes. (b) River bazree. |
| 6 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc.initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. (a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.SAIL/TATA/RINL/JSW/JSPL/Shyam/SRMB/ISSL/BMASL/Electrosteel |
| 7 | Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor). |
| 8 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor. |
| 9 | Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].(i) with 1:6 cement mortar. (b) 20 mm. thickplaster. |
| 10 | Wood work in door and window frame fitted and fixed in position complete including a protective coat of painting at the contact surface of the frame excluding cost of concrete, Iron Butt Hinges and M.S clamps. (The quantum should be corrected up to three decimals). |
| 11 | Panel shutters of door and window, as per design (each panel consisting of single plank with out joint), including fitting and fixing the same in position but excluding the cost of hinge and other fittings.In ground floor.(In case of non-supply of single plank, panel rate of reduction of 20% will be made). |
| 12 | Supplying, fitting and fixing M.S. clamps for door and window frame made of flat bent bar , end bifurcated with necessary screws etc. by cement concrete (1:2:4) as per direction . ( cost of concrete will be paid separately). |
| 13 | Iron butt hinges of approved qualityfitted and fixed with steel screws, with ISI mark. |
| 14 | Anodise aluminium barred/tower/socket bolt (full covered) of approved manufactured from extruded section conforming to I.S.204/74 fitted and Fixed with cadmium plated screws. |
| 15 | Anodise aluminium Aldrop/Slidingbolts of approvedquality manufactured form extruded section conforming to I.S. specifictation (I.S.2681/66) fitted and fixed complete. |
| 16 | Neat cement punning about 1.5mm thick in wall, dado, window sill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m. |
| 17 | (b) Priming one coat on timber or plasteredsurface with syntheticenamel oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 18 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sandparpering etc. in cluding using of approved putty etc. on the surface , if necessary. |
| 19 | Applying interior grade acrylic primer of approved quality and brand on plasteredor concrete surface old or new surface to received distemper /Acrylic emulsion paint including scraping and preparing the surface thoroughly , complete as per manufactured specification and as per directions of the EIC.In ground floor.. |
| 20 | Applying exteriorgrade Acrylic primer of approved quality and brand on plaster or concrete surface old or new surface to receive decorative textured (mat finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly complete as per manufacturer\"s specification and as per direction of the EIC. In Ground Floor: |
| 21 | Supplying, fitting and fixing Orissa pattern water closet in white glazed vitreous chinaware of approved make in position complete excluding \"P\" or \"S\" trap (excluding cost of concrete for fixing). |
| 22 | Supply of UPVC pipes (B Type) & fittings conforming to IS-13592-1992 (xx) 125/110 P Trap with W.C. Ring |
| 23 | Supplying, fitting and fixing PVC pipes of approved make ofof Schedule 80 (medium duty) conforming to ASTMD-1785 and threaded to match with GI Pi;es as per IS:1239 (Part-I) with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting piles, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made seperately). |
| 24 | Supplying, fitting and fixing PVC pipes of approved make ofof Schedule 80 (medium duty) conforming to ASTMD-1785 and threaded to match with GI Pi;es as per IS:1239 (Part-I) with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting piles, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made seperately). |
| 25 | Supplying, fitting and fixing bib cock or stop cock.PTMT (Polytetra Bib Cock / Stop Cock ( Prayag or equivalent)15 mm |
| 26 | Supplying PVC water storage tank of approved quality with closed top weith lid (Black) - Multilayer.500 litre capacity. |
| 27 | Labour for hoisting plastic water storage tank. Upto 1500 litre capacity. Upto 1st story from G.L. |
| 28 | CConstruction of Septic tank of different capacities as per approved drawing with 1st class brick work in cement mortar (4:1) including two 560 mm dia. R.C.C. manhloe cover of approved make supplied, fitted and fixied in the top slab with necessary fittings, 19 mm thick cement plaster(4:1) with neat cement finish to the internal surfaces and 12 mm thick plaster(4:1) to outside wall upto 200 mm below G.L. floor finished with 25 mm thick grey artificial stone including supplying, fitting and fixing all necessary specials, fittings, S.W. tees, C.I. foot rest etc. including excavating earth in all sorts of soil, shoring, bailing and pumping out water as necessary, ramming, dressing the bed and refilling the sides of the tank with earth, removing spoils, fliing up the chamber with clear water, removing foreign materialsfrom the chamber and including constructing attached inspection pit as per approved dawing and connecting all necessary pipes, joints etc. with internal plaster work and artificial stone flooring is to be done with admixture of water proofing compound @ 5% by weight of cement, complete in all respect as per directon of Engineer-in-Charge. |
| 29 | Display Board |
| 30 | Add 18 % GST on Total Amount |
| 31 | Add 1%labour cess on (Total Amount + GST) |