Tender for protective work to prevent erosion at km 6. 7, 8, 9, 10, 17, 22, 23, 25, 26 and 28 of Chandauli Chakia road, Construction of Protection wall of Chandauli Chakia road in Km 6, 7, 8, 9, 10, 17, 22, 23, 25, 26 and 28 ¼ikap okhZ; vuqj{k.k lfgr½ Sl. No. Item Description 1 Excavation for roadwork in soil with hydraulic excavator including cutting and loading, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres) (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 2 Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 3 Providing, laying, spreading and compacting stone aggregates of specific sizes (22.4-53mm)to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller in stages to proper grade and camber, applying and brooming requisite type of binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. WBM Grading-3as per Technical Specification Clause 404 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 4 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2and as per MORTH technical specification clause. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 5 Excavation for roadwork in soil with hydraulic excavator including cutting and loading, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres)For Retaining wall. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 6 Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 7 Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications Clause. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 8 PCC Grade M20 in Sub-structure using batching plant transit mixer & Concrete pump using cement,coarse sand & 20mmsize stone aggregate including s/o all material labour T&P etc required for proper completion of the work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 9 Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 including supply of all materials labour and T & P etc. required for proper completion of the work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 10 PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. (from serial number 1 to 9 ) 11 1st year- maintainance cost 0%CC &Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 12 2nd year- maintainance cost 0.25 % CC &Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 13 3rd year- maintainance cost 0.5 %CC &Drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 14 4th year- maintainance cost 0.75 % CC &Drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 15 5th year- maintainance cost 1 % CC &Drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)